Best Practices for Design Build Procurement

Slides:



Advertisements
Similar presentations
Office of Purchasing and Contracts Research Funded Procurement Outreach Training Level III Procurements $50,000 and Above.
Advertisements

Construction Contracting
W E L C O M E.
Quality Assurance/Quality Control Plan Evaluation February 16, 2005.
Project Procurement & Contract Administration Jiwei Ma
Contracting for Laboratory Services Ann Mullin Cleveland US Geological Survey Presented to the Environmental Protection Agency Science Advisory Board April.
Gene Shawcroft, P.E. Central Utah Water Conservancy District April 29-30, 2013.
Your Presenters Lisa Dal Gallo Dave Kirn Regional Executive/Justice Market Leader Partner, LEED AP
Planning for Program Delivery Presented By: Michael A. Haithcock, P.E. Assistant State Program Delivery Engineer October 27, 2009.
State Aid Design-Build Project Delivery for Minnesota Cities and Counties.
Alternative Project Delivery
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
Chapter 3 Project Initiation
Public Private Partnerships P3s What the Public Sector Considers When Selecting the Right Private Partner Jose A. Galan - Division Director Miami-Dade.
Legal Perspective on NDOT Alternative Procurements Geoffrey S. Petrov, Nossaman LLP.
Syed Zaidi, P.Eng. PM (Stanford), PhD. Director, Strategic Partnerships Alberta Infrastructure. Government of Alberta Canada Richard. B. (Dick) Innes,
ENRICH INSPIRE TRANSFORM ENRICH INSPIRE TRANSFORM ENRICH INSPIRE TRANSFORM ENRICH INSPIRE TRANSFORM ENRICH INSPIRE TRANSFORM ENRICH INSPIRE TRANSFORM ENRICH.
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
PROJECT DELIVERY SYSTEMS
Delivery Methods  The Players from Handbook of Architectural Practice, Chapter 9.1 by Phillip Bernstein FAIA  Variables from Handbook of Architectural.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
Performance Monitoring All All Contracts require basic monitoring once awarded. The Goal of contract monitoring is to ensure that the contract is satisfactorily.
Purpose of the Standards
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Interstate 81 Bridges over Route 80 Design-Build Project (PIN , D900023) Town of Tully, Onondaga County.
Chapter 3 Project Initiation. The stages of a project  Project concept  Project proposal request  Project proposal  Project green light  Project.
Pre-Project Planning Lessons from the Construction Industry Institute Construction Industry Institute Michael Davis, P. Eng, PMP Ontario Power Generation.
WELCOME TO THE PROCUREMENT SEMINAR Procurement and Contracts An Overview of Contract Administration.
Civil Contractors Federation ‘2014 Earth Awards’ Submission Template CATEGORIES 1 and 2 ONLY Company Name (NOTE: if an Alliance then the name of the companies.
A SOUND INVESTMENT IN SUCCESSFUL VR OUTCOMES FINANCIAL MANAGEMENT FINANCIAL MANAGEMENT.
FIDIC CONFERENCE 2005, BEIJING Workshop 13 Design & Build - Role of Consulting Engineers in the Tender Process Tse Yau Shing.
2005 AASHTO Value Engineering Conference Using VE in Design Build Presented by: Jerry R. Blanding Innovative Contracting Engineer FHWA – NRC July 21, 2005.
Honoraria for Design Build Projects Methodology Assessment Matrix.
New York State Department of Transportation
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Standards of Practice Course
Click on Next to continue Introductio n Inputs Tools and Techniques Outputs Next 12.2 Conduct Procurements: Introduction The process of obtaining seller.
Module 10 Session 10.4 Visual 1 Module 10 Organizing Procurement Session 10.4 Procurement of Services: Use of Consultants and Developing Terms of Reference.
Design–Build Contracts G. Hardy Acree Director of Airports Sacramento County Airport System Advantages of of During Turbulent Times.
TH 2 – Wilton Bridge Replacement Design-Build Project S.P March 5, 2009 Todd Vonasek, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING.
DESIGN-BUILD The Culture of Builders The “Design–Builder" is typically a general contractor. Some design–build firms employ professionals from both the.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
January 31, …a delivery method in which the construction team is known as the design-builder…and is responsible for taking a concept developed by.
Scope Management Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Chapter 5 Learning Objectives After completing this chapter,
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall o P.I.I.M.T o American University of Leadership Ahmed Hanane, MBA, Eng, CMA, Partner.
WSDOT Design Build Contracting – an innovative partnership Society of American Military Engineers September 16, 2014 Phil Fordyce, P.E. WSDOT.
Project Procurement Management
PUBLIC–PRIVATE PARTNERSHIP (PPP) FRAMEWORK AND GUIDELINES Syed M. Ali Zaidi, P.Eng. PM(Stanford), Ph.D. Director, Strategic Partnerships Alberta Infrastructure.
LACCD Building the Future THOMAS HALL Director Facilities Planning and Development.
1. Design-Build is a project delivery process in which the design and construction phases of a project are combined in a single contract. The consultant.
1 Performance Auditing ICAS & IRAS Officers NAAA 21 Jan 2016.
The Contract Management Process Post Award Activities.
Construction Management At Risk Process
US Army Corps of Engineers BUILDING STRONG ® Building and Preserving Alaska’s Future Alaska District Design-Build Contracts Moolin Seminar November.
Compliance with CCNA F.S..  Advertisement  Longlist  Shortlist  Request for Proposal  Scope of Services Meeting  Technical Proposal Review.
2016 SAME Small Business Conference - Atlanta
Yukon Government 3rd Annual Industry Conference
NHCA Education Series Contractor Pre-Qualification CSST
PRESENTER Jose A. Galan ▸ Division Director, Internal Services Department, Real Estate Development Division ▸ Current Chair of the Florida Council For.
Award Management Services
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
Request for Proposal - Best Value
Request for Proposal - Best Value
PROJECT DELIVERY METHODS
CIS12-3 IT Project Management
OCPS CCNA SELECTION COMMITTEE TRAINING
Civil Contractors Federation ‘2014 Earth Awards’ Submission Template CATEGORIES 1 and 2 ONLY Company Name (NOTE: if an Alliance then the name of the.
Second Avenue Subway Project Execution Strategy
Presentation transcript:

Best Practices for Design Build Procurement Presentation to 2010 FAA Worldwide Airport Technology Conference Atlantic City, NJ April 22, 2010 Jim Hall, PE, PhD Recycling of Hot Mix 1

IPRF Project 01-G-002-06-1 Review Panel Jim Lafrenz (IPRF) Craig Rutland (HQ AFCESA/CEOA) Gary Mitchell (ACPA) Carlton Lambiasi (FAA) Bob Benko (FAA) Susan Winslow (Delta Airport Consultants) Dean Rue (CH2M Hill) Mike Devoy (RW Armstrong) Recycling of Hot Mix

Project Team Jim Hall (ARA) Dave Hein (ARA) Chris Olidis (ARA) Justin Jones (PBSJ) Recycling of Hot Mix 3

Project Objectives Assess, document and compare merits and deficiencies between D/B and D/B/B Document myths and realities of D/B Develop a suitability template for D/B Develop a D/B best practices document Recycling of Hot Mix 4

Project Approach IPRF identified list of airfield D/B projects Each was contacted; completed questionnaire and personal interview Recycling of Hot Mix 5

D/B versus D/B/B Recycling of Hot Mix 6

Key Aspects of D/B D/B projects move from conception to commission much faster than D/B/B Design and construction integration/overlap allows compression of schedule critical path Projects with higher level of complexity better suited Allows innovation Promotes sense of ownership of final product Less cost creep than traditional D/B/B Not always least cost approach Recycling of Hot Mix 7

Role of Design Engineer The design engineer is contracted to the D/B Entity Does not have a direct relationship with the Owner Designer retained by D/B contractor not an issue in projects reviewed Some advantages to have contractor personnel be an integral part of the design team May work best when D/B is joint venture between design firm and contractor Recycling of Hot Mix 8

Project Development Owners should have a clear understanding of what they want and ask for it A risk allocation matrix helps identify the responsibilities of owner and contractor Owners preliminary design should allow a contractor to do preliminary estimating Recycling of Hot Mix 9

Risk Allocation Matrix Recycling of Hot Mix 10

Risk Allocation Matrix Recycling of Hot Mix 11

Minimum Information to be Provided to Prospective Bidders Performance specifications Geotechnical information Topographical survey Environmental Impact Statement (EIS) Record of Decision (ROD) Design parameters (traffic, design life, etc) Recycling of Hot Mix 12

Typical RFP Information Recycling of Hot Mix 13

Project Development 30 percent design sufficient to describe owner’s requirements Procurement evaluation criteria should include decision parameters and ratings Pre-qualify no more than three D/B teams Recycling of Hot Mix 14

Project Development Consider a suitable stipend to short-listed bidders commensurate with size and complexity of project A 3-year warranty was considered reasonable An arbitration procedure for dispute resolution should be included in the D/B contract Recycling of Hot Mix 15

Contract Management Partnering session to establish / understand all aspects of the project Regular meetings to review issues and contingency items, ensure no surprises Deal with any financial issues immediately Design submissions need to be largely complete and accurate and have contractor buy-in before being submitted to the owner for review Recycling of Hot Mix 16

Project Management Owners project team must be committed to the D/B process Owners should retain an independent firm to review the design submittals (unless Owner has in-house capabilities) Owner design reviewers to be highly experienced in the subject matter due to compressed schedule Recycling of Hot Mix 17

Quality Management D/B lead responsible for overall project QC and QA checks of the subcontractors’ QC QMP should include: organizational details quality procedures inspection and testing frequencies corrective action plans reporting requirements, etc ISO 9000 Guidelines good reference Recycling of Hot Mix 18

Quality Management Subcontractors responsible for QC of their own work Owner and/or owner’s representative should provide QA oversight QA/QC information and test results should be readily available to all parties Recycling of Hot Mix 19

Quality Plan Requirements Recycling of Hot Mix 20

Quality Plan Requirements Recycling of Hot Mix 21

Project Suitability for D/B Large airport projects may be up to 3 years in the planning and funding stages Legislation to allow D/B Procurement Primary Considerations Time constraints for project delivery Environmental impact complete Project complexity Recycling of Hot Mix 22

Project Suitability for D/B Secondary Considerations (partial list) Well defined scope - clear performance requirements Project size Owner experience and resources Contractual restraints (complexity) Allocation of risks Recycling of Hot Mix 23

Project Suitability for D/B Other Considerations (partial list) Operational constraints Budget Unforeseen subsurface conditions Roles and responsibilities Surety/bonding/insurance, etc Recycling of Hot Mix 24

Project Suitability Template Considers primary, secondary, and other factors Assigns appropriate weighting factors Weighting factors based on Owner’s needs and expectations Outcome can range from 0 to 100 > 65, suitable for D/B 50 to 65, can be considered < 50, not considered suitable Recycling of Hot Mix 25

Recycling of Hot Mix 26

Design/Build Flowchart Step 1 Determine Suitability Evaluate fatal flaws Complete suitability matrix Recycling of Hot Mix 27

Design/Build Flowchart Step 1 Determine Suitability Step 2 Procurement Plan Project description Assess risk Develop schedule and planning budget Recycling of Hot Mix 28

Design/Build Flowchart Step 1 Determine Suitability Step 2 Procurement Plan Step 3 Develop RFQ Pre-qualification requirements Selection criteria and weighting Shortlist qualified proposers Recycling of Hot Mix 29

Design/Build Flowchart Step 1 Determine Suitability Step 2 Procurement Plan Step 3 Develop RFQ Step 4 Develop RFP Contractor does not accept risk, he prices it. Create knowledgeable selection panel Establish design guidelines Balanced contract language Recycling of Hot Mix 30

Design/Build Flowchart Step 1 Determine Suitability Step 2 Procurement Plan Step 3 Develop RFQ Step 4 Develop RFP Step 5 Evaluate and Award Separate evaluation of technical and financial submission Promptly award contract Recycling of Hot Mix 31

Design/Build Flowchart Step 1 Determine Suitability Step 2 Procurement Plan Step 3 Develop RFQ Step 4 Develop RFP Step 5 Evaluate and Award Step 6 Monitor Performance Hold chartering sessions Undertake auditing and monitoring Final acceptance Recycling of Hot Mix 32

Technical Report and Best Practices IPRF website http://www.iprf.org/ Recycling of Hot Mix 33

Draft ACC and UFC Documents Recycling of Hot Mix 34

QUESTIONS Recycling of Hot Mix 35