KEK Status Report Kirk 04/Mar/20151LCC 5th SCRF Meeting.

Slides:



Advertisements
Similar presentations
E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Operational Results from STF-VTS and Cryomodule Tests at KEK Eiji Kako (KEK, Japan)
Advertisements

KEK cavity status, March 2011 H. Hayano, ALCPG11, WG3, Eugene.
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
1.3 GHz FNAL Dressed Cavity S-1 Global Deliverable to KEK 7 July 2009.
E. KAKO (KEK) 2009' Sept. 30 Albuquerque Global Design Effort 1 Cavity Test Items in S1-G Cryomodule Eiji Kako (KEK, Japan)
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
Test infrastructure and test programs at KEK-STF Kirk 2013/3/26TTC meeting
1.3 GHz SRF Cavity R&D Plan Jiyuan Zhai ILC Group, IHEP 3 rd IHEP-KEK 1.3 GHz SRF Meeting, 7 Dec 2010, Beijing.
S1G Experiment Schedule Plan H. Hayano. Assembly work after cavity arrived Assumption: cavity with VT, with pickup antena, with Ar or N2 filled,
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
Summary of AWG7 SCRF technologies Eiji Kako Wolf-Dietrich Moeller Akira Yamamoto Hitoshi Hayano Tokyo, Nov
Status of crab crossing studies Presented by NAKANISHI Kota (KEK) 2008/1/25.
E. KAKO (KEK) 2009' Dec. 22 S1-G Webex meeting Global Design Effort 1 Final Results of KEK Cavities for S1-Global Eiji Kako (KEK, Japan)
1 Results from the 'S1-Global' cryomodule tests at KEK (8-cav. and DRFS operation) Shin MICHIZONO (KEK) LOLB-2 (June, 2011) Outline I. 8-cavity installation.
STF Plan & Schedule H. Hayano, KEK. Superconducting RF Test Facility Comprehensive Test Facility dedicated to ILC SC-RF R&D (expandable to FEL, ERL) for.
STF Status and Future plan H. Hayano, KEK, LCWS12 Arlington System Test session 1.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
STF status Mar.22,2005 H. Hayano, KEK. STF Phase 1 Test Accelerator DC gun : 200kV CsTe photocathode for quick start UV(262nm) Laser (337ns spacing, 2820bunches)
ILC WG2 (Main Linac System) status & report H. Hayano, KEK.
S.Noguchi (KEK) ILC08 Chicago , Nov . 17, Cavity Package Test in STF STF Phase-1 E. Kako, S. Noguchi, H. Hayano, T. Shishido, M. Sato, K. Watanabe,
1 E. KAKO (KEK) 2012' May 28 Clermont 1 A_RD_03 R/D for the High Power Couplers for ILC Walid KAABI (LAL-Orsay, France) Eiji KAKO (KEK, Japan)
Cavity status; recent KEK activities : Hayano (1)STF CM-1 cavities are; MHI MV/m for CM-1 ILC cryomodule (3-rd VT) MHI MV/m for.
LCWS13 at Tokyo, 2013 Nov. 121Eiji Kako (KEK, Japan) Status of STF2 Input Couplers Eiji KAKO (KEK, Japan)
Status of ILC Activity in KEK H. Hayano, KEK APPI 03/10/2005.
1Matthias LiepeAugust 2, 2007 Future Options Matthias Liepe.
Dec/1/2015WG3 in TTC Meeting Test Result of STF-2 Cryomodule Kirk Jun/2013Jul/2015 Preliminary.
Summery of the power coupler session at the LCWS13 workshop E. Kako W.-D. Möller H. Hayano A. Yamamoto All members of SCRF WG November 14, 2013.
(1)[12~13/Dec/2009] Optical inspection (2)[14/Dec] frequency & field flatness measurement (3)[10/Mar/2010] pre-EP (5μm) (4)[11/Mar] EP1 (100μm) (5)[11/Mar]
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
Definition of Work Area H. Hayano, KEK EDR-KOM-cavity at DESY Issues of Cavity and Cavity Package, Work Package discussion.
STF phase 2 plan H. Hayano, STF phase 2 Accelerator Layout cavities: 2 capture cavities with short ILC-cross-section cryomodule + 26 cavities.
Progress and Plans for R&D and the Conceptual Design of the ILC Main Linacs H. Hayano, KEK PAC2005 5/18/2005.
KEK-STF Vertical Test and Diagnostics Brief History & Future Plan Vertical Test Facility Cavity Diagnostic System Example of MHI#7 Cavity Summary of T-mapping.
2 nd Workshop of the IHEP 1.3 GHz SRF R&D Project and 2nd IHEP-KEK 1.3 GHz SRF Meeting Opening Remark J. Gao December 2-3, 2009, IHEP, Beijing, China.
IHEP GHz 9-cell Cavity R&D Status and Plan The Third IHEP-KEK 1.3GHz SC Technology Collaboration Meeting Dec. 7-8, 2010, IHEP, Beijing GAO Jie,
S1-Global status report KEK Norihito Ohuchi 2008/11/171ILC08-GDE-Meeting-Chicago.
Plug compatibility discussion TILC09 cavity integration session H. Hayano.
MHI#16 号機の2回目の EP2  Process log  Status of working  Monitor data during EP & Rinsing process  Comparison of EP2 Period : 2011/5/10 ~ 5/16 Process :
Visiting DESY for S1-G module Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
MHI#19 号機の1回目の EP2  Process log  Condition of EP2 & Rinsing process  Status of working  Monitor data during EP & Rinsing process Period : 2012/2/17~
Low Beta Cryomodule Development at Fermilab Tom Nicol March 2, 2011.
Industrialization Studies in the KEK Cavity Fabrication Facility (CFF) H. Hayano The 2nd workshop on SCRF Cavity Technology and Industrialization.
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
Recent Result for the STF-2 Cryomodule Operation
HOM-BPM study in STF for cavity miss-alignment detection
ILC10 Beijing Global Design Effort
CW couplers; KEK injector couplers Eiji Kako (KEK, Japan)
WP5 Elliptical cavities
ILC-SCRF Test Facilities considerations
WG-1 Session Cavity Performance Cryomodule Performance
Crab Cavity R&D Plan Kirk 1 6/Dec/2016
Activities of Cavity Fabrication Facility at KEK
S1-G Webex meeting Global Design Effort
Cost reduction activities in cavity fabrication at MHI
Performance of Slide-jack tuner in STF-2 Cryomodule
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
Recent VT Results in the STF-2 cavities
Progress in Asia Hitoshi Hayano,KEK,
High Q Cavity Operation in the Cornell Horizontal Test Cryomodule
KEK injector cryomodule
ERL Main-Linac Cryomodule
ERL2015 WG4: RF & superconducting RF for ERL
IHEP Cryomodule Status
Construction and First Coo-down Test of cERL Injector Cryomodule
CEPC Input Coupler Discuss 6th IHEP-KEK SCRF Collaboration Meeting
IHEP ILC Cavity Status Jiyuan Zhai (IHEP)
CEPC-650MHz Cavity Cryomodule
Cavity Degradation Experience at S1-Global
Presentation transcript:

KEK Status Report Kirk 04/Mar/20151LCC 5th SCRF Meeting

STF-2 Cryomodule (CM-1; 8 cavities & Q-magnet, CM-2a; 4 cavities) ‒ First cool-down, and low power measurement at 2K done last autumn ‒ One Piezo broken with short circuit (will be exchanged in near future) ‒ High power test will start from this autumn 9-cell Cavity ‒ MHI-D fabricated / tested twice, but not so good results ‒ MHI-27~-30 fabricated / tested, but not achieved above 35 MV/m ‒ They will/may be used for cavity exchange after high power test in STF-2 ‒ KEK-2 (In-house, L.G.) fabrication started Others ‒ Magnetic shield study is still on going in vertical cryostat (Tsuchiya-san/Masuzawa-san) ‒ V.T. for In-house 1-cell cavities done many times (Umemori-san/Shimizu-san) ‒ V.T. for N 2 doped cavity done last week ‒ CP for SRF GUN (1.5-cell) cavity done (Umemori-san/Konomi-san) STF/CFF Status 04/Mar/20152LCC 5th SCRF Meeting

04/Mar/20153LCC 5th SCRF Meeting CM-1+CM-2a in STF-2 CM-2a (4 cavities) CM-1 (8 cavities+BQU) Injector CM (2 cavities) First cool-down for CM-1/CM-2a done Low power test with Network Analyzer done Motor drive test for variable input coupler done  W.G. system will be installed into tunnel around summer  Coupler conditioning at R.T. will start after that  Second cool-down / high power test will start from this autumn

04/Mar/20154LCC 5th SCRF Meeting Result in low power measurement S. Imada Target frequency : 1.3 GHz Target Q L : 5.0 x 10 6 I beam = 6mA → Q L = 6 x 10 6 I beam = 9mA → Q L = 4 x 10 6 One piezo did not work!

04/Mar/20155LCC 5th SCRF Meeting V.T. result for MHI-27~-30 T. Shishido

04/Mar/20156LCC 5th SCRF Meeting In-house cavities in CFF M. Yamanaka Cavity nameCavity typeComment / Status KEK-09-cellPrototype, w/o HOM couplers, V.T. finished KEK-19-cell3 rd V.T. will be done KEK-29-cell (L.G.)Fabrication started, under discussion on end group KEK-R11-cell (L.G.)V.T.s were done twice KEK-R21-cellV.T.s were done twice, after that N 2 doped tested KEK-R33-cellTwo dumbbells fabricated by improved method KEK-R41-cellF.G. for cell, L.G. for beam pipe KEK-R51-cell (L.G.)Low RRR (<200), Trimming for cell KEK-W11-cell (Seamless)1 st V.T. done KEK-W21-cell (Seamless)Broken in fabrication KEK-U41-cell (Seamless)Nb pipe produced

Thank you 04/Mar/20157LCC 5th SCRF Meeting