BCIS 4610 Project - Interim Report 1 BCIS 4610 INTERIM REPORT By : Name 1, Name 2 and Name 3. LLC.

Slides:



Advertisements
Similar presentations
Logical and Physical Design of an Information System
Advertisements

TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
Preparing Business Reports
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
Chapter 4 Enterprise Modeling.
INFO 425 Week 31 INFO 425 Design Problem I Week 3 – SDS Improvements Glenn Booker.
EPICS Design Review Template Notes:  Use the template as a guide to preparing your presentation….you may add, subtract, or rearrange as needed to tell.
EPICS Conceptual Review Template Notes:  Use the template as a guide to preparing your presentation….you may add, subtract, or rearrange as needed to.
Projects Key dates lists of suggested projects published * *You are highly encouraged to choose a project yourself or find a relevant project.
Chapter 3: The Project Management Process Groups
AD description template definition Marián Mlynarovič FIIT Lectures 2006.
Systems Analysis I Data Flow Diagrams
Examine Quality Assurance/Quality Control Documentation
Chapter 3 Project Initiation. The stages of a project  Project concept  Project proposal request  Project proposal  Project green light  Project.
Instructions & Notes This template was created to help you: – Show the team where you are going via slides representing each planned activity. – Keep your.
6 Systems Analysis and Design in a Changing World, Fourth Edition.
Chapter 6: The Traditional Approach to Requirements
USE Case Model.
Systems Analysis and Design in a Changing World, Fifth Edition
INFORMATION X INFO415: Systems Analysis Systems Analysis Project Deliverable 3 Requirements Models.
Chapter 6 The Traditional Approach to Requirements
1 Part 5: Closing Task 1 Kelvin asked you to help him prepare and present the final project presentation. Prepare a short presentation to summarize result.
Systems Analysis and Design in a Changing World, Fifth Edition
INFORMATION SYSTEM APPLICATIONS System Development Life Cycle.
Typical Software Documents with an emphasis on writing proposals.
Copyright 2012 by Arthur Fricke Report Organization Engl 2311.
Phase 2: Systems Analysis
Put the Title of the WebQuest Here A WebQuest for xth Grade (Put Subject Here) Designed by (Put Your Name Here) Put Your Address Here Put some interesting.
Chapter 10 Information Systems Analysis and Design
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
Requirements Specification for Lab3 COP4331 and EEL4884 OO Processes for Software Development © Dr. David A. Workman School of Computer Science University.
MAE126B Report Writing Lecture Refer also to MAE126A Report Writing Lecture.
Adding the Executive Summary and …. Executive Summary (1-2 pages) briefly presents these items: 1.sustainability problem 2.rationale for your project.
Systems Analysis and Design
CS 4850: Senior Project Fall 2014 Object-Oriented Design.
1 CS Tutorial 5 Frid. Oct 23, 2009 Design Document Tutorial.
Going Deeper with Mark Twain A WebQuest for 10th Grade Composition Designed by Sandy Schaufelberger Wes-Del High School, Gaston IN
DESIGN PROPOSAL REPORT. Why write a proposal? Basic means of convincing someone to support a project. Important tool for organizing time and resources.
Survey Report Reporting Survey Results When your survey and analysis has been completed, the final step in the survey process is to present your findings,
Activity 3 - introduction
Systems Development Life Cycle
Requirement Engineering. Recap Elaboration Behavioral Modeling State Diagram Sequence Diagram Negotiation.
©2011 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Module 4: Systems Development Chapter 13: Investigation and Analysis.
Now what? 1.  I have short-listed projects I am interested in  I know the types of projects I would like to pursue  I have an idea of the resources.
6 Systems Analysis and Design in a Changing World, Fourth Edition.
CSIS 4850: CS Senior Project – Spring 2009 CSIS 4850: Senior Project Spring 2009 Object-Oriented Design.
Systems Development Lifecycle
Your Interactive Guide to the Digital World Discovering Computers 2012 Chapter 12 Exploring Information System Development.
Fundamentals of Information Systems, Sixth Edition Chapter 3 Database Systems, Data Centers, and Business Intelligence.
Defining and Managing Project Scope. MOV Scope Phases Time Estimates Resources Tasks Schedule Budget Sequence Project Planning Framework.
BCIS 5420 Project - Proposal 1 BCIS 5420PROPOSAL By : Name 1, Name 2 and Name 3. LLC.
P3 Business Analysis. 2 Section F: Project Management F1.The nature of projects F2. Building the Business Case F4. Planning,monitoring and controlling.
Final Review Systems Analysis and Design in a Changing World, 4th Edition 1 Final Review u Chapters 1-6, 8-10, 13, 14, 15 u Multiple choice, short answer,
Project Management PTM721S
This template provides guidance for the execution of task, Analyze Capabilities (EA.040). It is in a presentation format that may be used to present.
Chapter 6 The Traditional Approach to Requirements.
Principles of Information Systems Eighth Edition
Physical Data Model – step-by-step instructions and template
Project Management PTM721S
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
How does a Requirements Package Vary from Project to Project?
STATUS REPORT.
EDD/581 Action Research Proposal (insert your name)
CHAPTER 4 PROPOSAL.
CHAPTER 4 PROPOSAL.
Project Management Process Groups
COMP 208/214/215/216 – Lecture 7 Documenting Design.
Systems Design Project Deliverable 3
EDD/581 Action Research Proposal (insert your name)
Presentation transcript:

BCIS 4610 Project - Interim Report 1 BCIS 4610 INTERIM REPORT By : Name 1, Name 2 and Name 3. LLC

P ROPOSAL C ONTENT Executive Summaryp.11 Our Understanding of your needs And so on… 2 BCIS 4610 Project - Interim Report

OVERVIEW 3BCIS 4610 Project - Interim Report

E XECUTIVE S UMMARY Executive Summary This template is intended to provide guidance with regard to the expected content and presentation of the Interim Report. Specifically, the template provides guidance on: The sections that should be present in the report; The approximate length of each section; Formatting expectations – a professionally looking proposal is similar to a brochure; Expectations regarding graphics and diagrams – you are expected to substitute the diagrams in the template with the ones related to your project. You are encouraged to customize your template in the following ways: Customizing the title page; Replacing the logo; Changing page layouts; Changing section and sub-section titles; Changing color schemes and replacing/adding graphics; Changing the approach and the number of stages; Other, given that the overall quality is not compromised. Your executive summary should summarize the content of this specific report, including an overview of the process, data structure, design decisions, ect. 4 BCIS 4610 Project - Interim Report

D ISCUSSION OF THE C URRENT SITUATION Client or functional area description Can come directly from the proposal. May be abridged. Description of the as-is (old) system Briefly describe how the system (the process you are trying to automate currently works. If you are designing a generic system, describe a typical process (make sure you change the section tytle appropriately. Finish with problems with the old system (from your proposal) 5 BCIS 4610 Project - Interim Report

G OALS OF THE PROJECT The goal of the project Use a lot of positive and flashy words. Can come directly from your proposal, unless you modified the goal. Benefits for the client Goal 1 Goal 2 Goal 3 Figure 1: Goals of the project 6 BCIS 4610 Project - Interim Report

P ROJECT SCOPE Scope of the project Be very specific to state what is within the scope of this project. You have likely changed (narrowed) your scope after your proposal. Make sure that you reflect those changes in the scope description. Make sure that your scope description is consistent with the scope reflected in your DFD. Key deliverables Limitations State what is NOT in the scope of this project, but be positive 7 BCIS 4610 Project - Interim Report

SYSTEM REQUIREMENTS 8BCIS 4610 Project - Interim Report

A PPROACH TO COLLECTING USER REQUIREMENTS The overall approach you followed in collecting your user requirements Describe where you got your system requirements from. Be truthful. If you had worked for a similar place in the past and you remembered it, state it. If you used a book, mention it. Key stakeholders of the system Describe the key stakeholders of the system. Theoretically, these would be the people that you would collect the requirements from. Because this is a class project, you probably did not, but list the stakeholders anyway. Sources of information Be truthful. If you had worked for a similar place in the past and you remembered it, state it. If you used a book, mention it. 9 BCIS 4610 Project - Interim Report

F UNCTIONAL DESCRIPTION OF THE NEW SYSTEM Goal of the system, high level description Describe what your system does briefly but clearly (should be related to the scope of the project) Description of system functionality This should include bullet points shortly describing each of your high level processes. Essentially this is a verbal description of your Level 0 DFD, so make a reference to your appendix here) Relationship to other systems Here you will describe what other systems your system will interact with. 10 BCIS 4610 Project - Interim Report

F UNCTIONAL D ESCRIPTION OF THE NEW SYSTEM 11 BCIS 4610 Project - Interim Report Use Case Name:ID: 1Importance Level: High Primary Actor: Short description: Trigger:Type: Major InputsSourceMajor OutputsDestination Major Steps PerformedInformation for Steps

F UNCTIONAL D ESCRIPTION OF THE NEW SYSTEM 12 BCIS 4610 Project - Interim Report Use Case Name:ID: 2Importance Level: High Primary Actor: Short description: Trigger:Type: Major InputsSourceMajor OutputsDestination Major Steps PerformedInformation for Steps

F UNCTIONAL D ESCRIPTION OF THE NEW SYSTEM 13 BCIS 4610 Project - Interim Report Use Case Name:ID: 3Importance Level: High Primary Actor: Short description: Trigger:Type: Major InputsSourceMajor OutputsDestination Major Steps PerformedInformation for Steps

F UNCTIONAL D ESCRIPTION OF THE NEW SYSTEM 14 BCIS 4610 Project - Interim Report Use Case Name:ID: 4Importance Level: High Primary Actor: Short description: Trigger:Type: Major InputsSourceMajor OutputsDestination Major Steps PerformedInformation for Steps

F UNCTIONAL D ESCRIPTION OF THE NEW SYSTEM 15 BCIS 4610 Project - Interim Report Use Case Name:ID: 5Importance Level: High Primary Actor: Short description: Trigger:Type: Major InputsSourceMajor OutputsDestination Major Steps PerformedInformation for Steps

D ATA R EQUIREMENTS ( C ONTINUE ON THE NEXT PAGE IF NECESSARY ) Brief description of the key types of data the is being created, stored and manipulated by the system Describe your date in general. Mention all the entities, but do not describe them. DO not mention attributes and relationships. Discuss what data is manipulated within each of your processes. Make reference to the ERD and CRUD matrix in your appendix. Entities Define each of the entity and list its attributes. Make references to the Entity Model Reference Report. Relationships List all the relationships and discuss what they mean. Make references to the Entity Model Reference Report. 16 BCIS 4610 Project - Interim Report

N ON - FUNCTIONAL REQUIREMENTS Key considerations/archtecture Discuss the type of the environment in which the system will be used and what considerations (speed, security, interface, etc.) are important. Discuss if the system is local or distributed, whether it should be accessed locally or via Internet, etc. User interface requirements Usability, aesthetics, corporate colors, web interface, mobile devices interface, etc. Performance Speed, transaction volume, Security Other (see your Dennis et al book) 17 BCIS 4610 Project - Interim Report

D EFINITION OF WORK FOR PHASE 2 Phase description Overall description of what you need to accomplish to create your final report. Discuss whether you are going to build a prototype for the entire system represented in your DFD or just a part of it. Key activities This is based on your proposal and the requirements for your project Key deliverables This is based on the requirements for your project 18 BCIS 4610 Project - Interim Report

D EFINITION OF WORK FOR PHASE 2 Interface Design - Forms List and briefly describe all forms that you will need to design for your final report. You should generally have one or one report for each of the Level 1 process. Interface Design – Reports List all reports that you will need to design for your final report. You should generally have one or one report for each of the Level 1 process. Key queries Identify what ad-hoc queries will need to be answered with your system 19 BCIS 4610 Project - Interim Report

P HASE 2 TIMELINE Schedule update and phase 2 timeline Describe how you are doing with regard with your original time line. Mention any adjustments. Project plan Paste your Gantt chart with a detailed phase 2 schedule. 20 BCIS 4610 Project - Interim Report

APPENDIX BCIS 4610 Project - Interim Report21

A PPENDIX Guide to the appendix List all elements of your appendix, preferably numbered or otherwise identified, including: Level 0 and Level 1 DFDs Business Process Maps ERD Crud Matrix Functional Hierarchy Diagram Entity Model Reference Report Function Definition Report Dataflow and data store definition reports 22 BCIS 4610 Project - Interim Report

23