Open Workshop,Pisa, November 2002 VI Framework: Integrated Project Dependability Foundations for Information infrastructures - Network of Excellence DeFINE.

Slides:



Advertisements
Similar presentations
Connected Health Framework
Advertisements

Department of Electronic Engineering Challenges & Proposals INFSO Information Day Research Networking Test-beds 26/27 May 2005,
Perspective from large Energy Utilities Global Standards Challenges ITU – GSS – Dubai UAE – Nov 19th, V6.
DM Copyright © Tekes Duration: Funding volume: 50 million euros Contact: Jerri Laine, Tekes Tel:
Hanover-Fair 2002 IEC The world-wide standard for communication in substations HM IEC   Substation Protocols Benefits Customer.
Improving Cybersecurity Through Research & Innovation Dr. Steve Purser Head of Technical Competence Department European Network and Information Security.
Smart Grid - Cyber Security Small Rural Electric George Gamble Black & Veatch
Vulnerability of Complex System Lokaltermin des ETH-Präsidenten Mittwoch, 1. Juli 2009 Laboratory for Safety Analysis.
Security Controls – What Works
Adaptive Infrastructures EPRI/DoD Initiative on Complex Interactive Networks/Systems Joint innovative research ·EPRI and ·Office of the Director of Defense.
(Geneva, Switzerland, September 2014)
Frankfurt (Germany), 6-9 June 2011 Enel Smart metering in Endesa Meters and More technology Valerio Vadacchino Business Development of Smart Grids and.
FUTURE IN ENERGY. The biggest co-generation high efficiency power plant in Romania, built in Suceava Investment value: over EUR 90 mil Used fuels: natural.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
Dependability in critical business systems DeSIRE & DeFINE Workshop Stefano De Panfilis Engineering Ingegneria Informatica S.p.A November 2002,
E.ON on the Romanian Energy Market ZF Power Summit Bucharest, February 27, 2013 Frank Hajdinjak CEO E.ON România.
Presentation of the Lombardy Region Foz de Iguaçu, 29th of January 2010 Four Motors for Europe.
CJ International 1 CJ International Welcomes you to the Soft Logic Open World.
A Research Agenda for Accelerating Adoption of Emerging Technologies in Complex Edge-to-Enterprise Systems Jay Ramanathan Rajiv Ramnath Co-Directors,
Critical Emerging Network-Centric Applications Tele-control/tele-presence Defense Tele-medicine Remote plane/vehicle/robot control Distance learning Real-time.
ANSALDO: BACKGROUND experience in dependable Signalling Automation Systems experience in dependable Management Automation Systems experience in installation,
TEKNOLOGI IKERTEGIA TECHNOLOGICAL RESEARCH CENTRE Dependable applications for DeSIRE (Pisa November 2002) A.R.Olano/Ikerlan
BITS Proprietary and Confidential © BITS Security and Technology Risks: Risk Mitigation Activities of US Financial Institutions John Carlson Senior.
Frankfurt (Germany), 6-9 June 2011 ENEL Group Italian core European base Worldwide strategy Italy’s largest power company. Europe’s second listed utility.
Putting a Face on Electronic Commerce Kathy Warden.
Infrastructure & Cities Sector – Smart Grid Division © Siemens AG All rights reserved. October 2012Page 1 The Smart Grid by Siemens Constant energy.
EDISON INTERNATIONAL® SM SCE Project Story CIM User Group 10/12/2010 Jim Horstman Southern California Edison.
AUTOMOTIVE CAREERS. AN INSIGHT INTO ONE OF THE MOST EXCITING AND REWARDING INDUSTRIES. 23 November, 2012.
Driving Innovation Technology Strategy Board Hydrogen and Fuel Cells Programmes.
Rome Energy Meeting 2008 Rome, November 2008 Investments Opportunities and Project Finance in the Energy Market Luigi Marsullo President Finpublic.
Pisa, 11/25/2002Susanna Donatelli1 Modelling process and heterogeneous model construction Susanna Donatelli Modelling and evaluation groups.
Expert Group for Virtual Reality in Transport, Manufacturing and Logistics Virtual Reality in Transport, Manufacturing and Logistics VIRTUAL REALITY IN.
Effective liberalization: an investor's perspective Matteo Codazzi Country Manager and CEO ENEL Romania “Sectorul eniergei electrice” Bucharest – 2007,
Copyright © Praxis Critical Systems Limited 2002 The Way Ahead Session Praxis Critical Systems Tom Anderson – The Commission’s View Discussion The Next.
Chapter 6 – Data Handling and EPR. Electronic Health Record Systems: Government Initiatives and Public/Private Partnerships EHR is systematic collection.
Dependable ICT for Utilities Proposal for DESIRE activities The CRIS Institute Hans Ottosson The International.
KNX – the benefits. Schneider Electric 2 - IS&C – Aug Content ●Basic arguments ●Added value for: ●Investors ●Wholesalers ●Installers and System.
Framework for the Development and Testing of Dependable and Safety-Critical Systems IKTA 065/ Supported by the Information and Communication.
P R E S E N T A T I O N to Academic Senate Forum 17 – May ALFA TECH.
1 Regional Innovation Strategies RIS. 2 About Regional Innovation Strategies The RIS projects aimed to support regions to develop regional innovation.
WebCast 5 May 2003 Proposed NERC Cyber Security Standard Presentation to IT Standing Committee Stuart Brindley, IMO May 26, 2003.
Pisa, 11/25/2002Susanna Donatelli1 Heterogeneous model construction Susanna Donatelli Modelling and evaluation groups of the Dipartimento.
Frankfurt (Germany), 6-9 June 2011 G. Dondossola, F. Garrone, J. Szanto RSE  Research context  Test bed architecture  Attack model  Attack experiments.
JEMMA: an open platform for a connected Smart Grid Gateway GRUPPO TELECOM ITALIA MAS2TERING Smart Grid Workshop Brussels, September Strategy &
UML Use Case Diagramming Guidelines. What is UML? The Unified Modeling Language (UML) is a standard language for specifying, visualizing, constructing,
Advanced Controls and Sensors David G. Hansen. Advanced Controls and Sensors Planning Process.
Intelligent Efficiency: National Summit on Integrating Energy Efficiency & Smart Grid Washington, D.C. October 15 th, 2013 Ethan A. Rogers Senior Program.
The role of innovation for the future of Swiss industrial SME The role of innovation for the future of Swiss industrial SME Laboratoire de gestion et procédés.
Open Workshop,Pisa, November 2002 VI Framework: Integrated Project Dependable Systems and Information infrastructure - Research and Exploitation DeSIRE.
Frankfurt (Germany), 6-9 June 2011 Iiro Rinta-Jouppi – Sweden – RT 3c – Paper 0210 COMMUNICATION & DATA SECURITY.
Department of Electronic Engineering Challenges & Proposals INFSO Information Day e-Infrastructure Grid Initiatives 26/27 May.
1 Innovation in Services Business Service Design and Innovation Fostering the Economic and Legal Framework for Innovation Performance and Development of.
Role of Smart Grids in the Italian Energy Policy Strategy Marcello Capra General Directorate for Electricity Market, Renewables, Energy Efficiency and.
Department of Trade and Industry DRIVING COMPETITIVENESS: TOWARDS A NEW INTEGRATED INDUSTRIAL STRATEGY FOR SUSTAINABLE EMPLOYMENT AND GROWTH Dr David Kaplan.
E-Government e- Government WG Surveys of the Greek Presidency e- Economics February 2003 Ministry of Interior Affairs, Public Administration & Decentralization.
Bringing together skilled Engineering & ICT professionals and companies.
WP2001 CPA4 Towards Dependable and Survivable Systems and Infrastructures Baton holder ANDREA SERVIDA European Commission DG Information Society C-4
NATIONAL CYBER SECURITY GOVERNANCE & EMERGING CYBER SECURITY THREATS
1 Pacini IT Barcelona May 2003 Improvement in the Distribution Assets Management by the Exploitation of the Innovative Component Technology.
TÜBİTAK – BİLGEM – SGE Cyber Security Institute Asım Gençer Gökce TÜBİTAK BİLGEM Cyber Security Institute (SGE) Role: Cyber.
LSEC H2020-DS - & CIP Ulrich Seldeslachts, Brussels, January 27th, 2016.
Workshop on Research Methods to Study Productivity Determinants Within Firms and the Role of Policy November 1, 2012 P olicy setting and firm-level focus.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco PublicITE I Chapter 6 1 Creating the Network Design Designing and Supporting Computer Networks – Chapter.
WG3 Flexible Generation
CCNET Managed Services
Recent initiatives on investor education in Italy
ABB Switzerland Organization
Baldor Electric Company
Luca Simoncini PDCC, Pisa and University of Pisa, Pisa, Italy
Presentation transcript:

Open Workshop,Pisa, November 2002 VI Framework: Integrated Project Dependability Foundations for Information infrastructures - Network of Excellence DeFINE CESI position in DeFINE Giovanna Dondossola Automation and Information Business Unit

Open Workshop, Pisa, November 2002 VI Framework DeFINE 2 CESI history  large investments in testing facilities to qualify Italian electromechanical Industry  skills on power system analysis for the development of the national grid CESI was founded in 1956 with the support of the Italian electrical utilities and electromechanical manufacturers and aimed at concentrating:

Open Workshop, Pisa, November 2002 VI Framework DeFINE 3 Our history Our history (continued)  widening the range of services offered to the national & international market in the electro- energetic and environmental sectors  developing “full range approaches and solutions” to the market r With the liberalization of the Italian Electrical System Enel Research is incorporated in CESI with the aim of:

Open Workshop, Pisa, November 2002 VI Framework DeFINE 4 The shareholders Enel 26% Terna 15% Interpower3% GRTN, Sogin12% ABB, Alstom, Ansaldo, Pirelli, Vatech, Siemens 29% Edison, Sondel, Aem Milan, Aem Turin, Endesa Italia, Eurogen 15% Share capital: 8.55 Million Euro Equity: Million Euro

Open Workshop, Pisa, November 2002 VI Framework DeFINE 5 Personnel ( ): 1052 Our figures Turnover 2001:123.7 million € Facilities area: 300,000 m 2

Open Workshop, Pisa, November 2002 VI Framework DeFINE Our organization structure T & D Networks D. Lucarella Managing Director G. Santagostino Environment A. Pigini Industry, End Uses & Renewables A. Porrino Generation P. Motta Tests & Components V. Scarioni Certification U. Colombo Personnel, Organization & Quality L. Anelli Sales F. Giornelli Research & Product Development R. Buccianti Administration & Finance V. Della Bona Automation & Information Techn. A.R. Tiramani Business Units Departments

Open Workshop, Pisa, November 2002 VI Framework DeFINE 7 Research Goals  To address the evolution of tools supporting dependability in electric automation systems  by including support to dependability in pre- existing development tools  by developing techniques allowing to improve the efficiency of formal analysis processes  by developing efficient fault tolerance solution applicable to real time control

Open Workshop, Pisa, November 2002 VI Framework DeFINE 8 Methods and Tools UML-CD Customized UML-CD Predefined TRIO Customized TRIO Parametric GSPN Customized GSPN UML Behavioural diagrams Modeller experience Rules and predefined models Automatic translation Customization guidelines Customization and refinement Info from customization

Open Workshop, Pisa, November 2002 VI Framework DeFINE 9 Technologies  Rigorous design & Formal V&V  temporal logic approach: Modular TRIO dialect [FAST European project  construction of dependability strategy specifications  application independent vs. application dependent parts  techniques for pruning the model generation process (e.g. use of Abstract Test Cases)  automatic generation of fault injection cases from specification  testing and simulation with fault injection  risk analysis methodology (collaboration with JRC)  threats, vulnerability, attacks characterisation  security functions and their correlation to threats/attacks

Open Workshop, Pisa, November 2002 VI Framework DeFINE 10 Cont.  Fault tolerance  mechanisms for tolerating transient and permanent faults in real time control  intrusion tolerance components for protecting the automation infrastructure from external/internal malicious agents  Evaluation of fault tolerance solutions measures from modelling

Open Workshop, Pisa, November 2002 VI Framework DeFINE 11 Central Topics  Open information infrastructure securing the open communication infrastructure for providing the Level of Service required by Remote Functions of Electric System  Embedded systems efficient faul tolerance satisfying real time constraints of cyclic applications  Critical infrastructure interdependencies Electric Network & ICT infrastructure

Open Workshop, Pisa, November 2002 VI Framework DeFINE 12

Open Workshop, Pisa, November 2002 VI Framework DeFINE 13 Editor Window: PSAS System

Open Workshop, Pisa, November 2002 VI Framework DeFINE 14

Open Workshop, Pisa, November 2002 VI Framework DeFINE 15 CESI event  CESI is member of Cigré WG on  Information technology development and its effect on the economy, security and market operation of power systems  representatives from several European electric utilities  a main goal: survey the technological development of Information Technology (IT) and its future trend in power sector  next meeting in January 2003 hosted by CESI, involving major IT producers for power systems (ABB, SIEMENS, ALSTOM, SELTA,...) and Operators (GRTN)