RockSat-C 2012 SITR Full Mission Simulation Report University of Minnesota Alexander Richman Jacob Schultz Justine Topel Will Thorson 4/23/2012.

Slides:



Advertisements
Similar presentations
RockOn! Canister Integration RockOn! 2009.
Advertisements

Team Ramrod Final Presentation Dan Armel, Michaela Cui, Andrew Grimaldi, Kyle Kemble, Silvia Peckham, Chris Sawyer & Kelsey Whitesell 6 th December 2007.
Full Mission Simulation Report Temple University Fred Avery, Gene Council, Ny’Jaa Bobo, Salvatore Giorgi, Jay Shukla 4/21/12.
RockSat-C 2012 CoDR Minnesota Sound Wreckers Conceptual Design Review University of Minnesota Alexander Richman Jacob Schultz Justine Topel Will Thorson.
Solar Cell Efficiency Flight Readiness Review Teddy Bounds Angela Dunn Joel Sasser.
Servo Feedback Control of an Audio Subwoofer by Dalimar Vélez Advisor: Shawn Hunt.
Protocol & Test Review Spaceport America Student Launch University/Institution Team Members Date.
Problems Encountered - Up to Midterm State Machine Transitions Much Too Fast - Solved by Decreasing Clock (LED Circuit) Difficult to Test LED (Column)
Data Test Review Spaceport America Student Launch University/Institution Team Members Date.
Flight Readiness Review New Mexico Space Grant Consortium University/Institution Team Members Date.
RockSat-C 2012 LRR Launch Readiness Review University/Institution Team Members Date.
Full Mission Simulation Test Report UPR-R(river) P(rock) University of Puerto Rico Río Piedras Campus May 14, 2010.
Gary MKIII University of Central Florida Chris Valle, Braden Urban, John Rowe, and Tyler Yoemans.
RockSat-C 2012 SITR Full Mission Simulation Report University/Institution Team Members Date.
RockSat 2010 Harding Flying Bison RockSat-C Rocket Team Harding University Ethan Lilly, Eric Locke, Darah McDaniel, Ed Wilson June 22, 2011.
Brynn Larson Trey Karsten Terek Campbell Marcus Flores Marcell Smalley Shunsuke Miyazaki 2015/6/10 Team Ochocinco.
RockSat-C 2012 PDR Minnesota Sound Wreckers Preliminary Design Review University of Minnesota Alexander Richman Jacob Schultz Justine Topel Will Thorson.
RockSat-C 2011 SITR Payload Subsystem Integration and Testing Report University/Institution Team Members Date.
RockSat-C 2011 ISTR Payload Subsystem Integration and Testing Report Universities/Institutions Team Members Date.
Laser Shoot-Out Game By Steven Noto and Laura Miller Advisor: Steven Gutschlag April 4, 2000 Senior Project Status Report 2.
RockSat-C 2012 PDR Minnesota Sound Wreckers Comprehensive Design Review University of Minnesota Alexander Richman Jacob Schultz Justine Topel Will Thorson.
Full Mission Simulation Test Report Team Name University/Institution Team Members Date.
Launch Readiness Review JASMM Virginia Tech Team Members: Robbie Robertson Zack HarlowJeremiah Shiflet Daniel Martin Matt James Anthony Rinaldi Senior.
Team Hubble Jr. Final Presentation Rachel Small, Holly Zaepfel, Ryan Del Gizzi, Kyle Norman, and Evan Levy December 5, 2006.
Echo  Final Presentation Andrew Berg, Shawn Carroll, Cody Humbargar, Jade Nelson, Jared Russell, Austin Williamson
Team Name Final Presentation Team Members Date. User notes –You may reformat to fit your design but make sure you cover the following points –You may.
Payload Subsystem Integration and Testing Report Team Name 1 Team Name 2 Team Name N Universities/Institutions Team Members Date.
Conceptual Design Review Metro State College of Denver Daniel Bass, Matt Hanley
Launch Readiness Review MinnSpec University of Minnesota Bryce Schaefer, Chris Woerhle, Art Graf
Full Mission Simulation Report New Jersey Space Grant Consortium at Stevens Institute of Technology and Rutgers University Ethan Hayon, Mark Siembab, Mike.
Noise Cancellation Device Peter Gordon, Zach Rohde, Aman Sanghera, Andrew Taylor, and Tanner Brunhoeber Critical Design Review.
Unit 9 Key Properties Definition & Instrument Use Advantages Disadvantages Condenser Microphone The condenser microphone is also called a capacitor microphone.
(PDR ) University of Northern Colorado Nathan and Casey 11/14/08.
The printed circuit board (PCB) design
Miscellaneous Notes: This is a bare-bones template – make it fancier if you wish, but be sure to address at least the items listed here. Basically this.
PHAT-TACO Experiment Pressure Humidity And Temperature Tests And Camera Observations Hannah Gardiner, Bill Freeman, Randy Dupuis, Corey Myers, Andrea Spring.
New Mexico Space Grant Consortium Student Launch Program Provide annual access to space for student experiments from Spaceport America.
Live Sound Reinforcement
RamRack Preliminary Design Review Colorado State University Zach Glueckert Christopher Reed Timothy Schneider Brendan Sheridan Christina Watanuki Advisor:
User notes: –Please use this template to create your Proposal Analysis Review –You may reformat this to fit your design, but make sure you cover the information.
User notes: –The purpose of the flight readiness review is to determine if your experiment is ready to fly. If it is not ready – it will not fly –You must.
Individual Subsystem Testing Report New Jersey Space Grant Consortium with Rutgers University Stevens Institute of Technology 2/13/2012.
RockSat-C 2012 ISTR Individual Subsystem Testing Report Minnesota Sound Wreckers University of Minnesota 2/13/12 1 Alexander Richman Jacob Schultz Justine.
RockSat-C 2012 SITR Full Mission Simulation Report Harding University William Waldron, Joshua Griffith, Drew Cancienne, Edmond Wilson, David Stair 22 April.
Team Name Final Presentation Team Members Date. User notes –You may reformat to fit your design but make sure you cover the following points –You may.
Full Mission Simulation Test Report SloshSAT University of Northern Colorado Team Members: Sage Andorka Dan Welsh Motoaki Honda Maurice Woods III Zach.
Balanced Audio, Speakers, and Amplifiers Created by: Sarah Hutchens & Jacob Hanchett.
Skeye The post report. Overview Original Plan Original Plan Results Results Possible Reasons for results Possible Reasons for results Resolutions for.
Team SSCSC Critical Design Review Nick Brennan, Kier Fortier, Tom Johnson, Shannon Martin, Dylan Stewart, and Adam Wright October 05, 2010 Fall 2010 Rev.
Launch Readiness Review
Northwest Nazarene University Chad Larson, Ben Gordon, Seth Leija, David Vinson, Drew Johnson, Zach Thomas June 1 st, 2012.
RockSat-C 2013 FMSTR Full Mission Simulation Report University/Institution Team Members Date.
UCLA IEEE NATCAR 2004 SUMMER CLASS Magnetic Sensors & Power Regulation.
Section 1: Mission Overview Mission Statement Mission Objectives Section 2: The Payload! User’s Guide Compliance Beta Prototype Testing Section 3: Check-In.
Surviving FlightSurviving Flight  28zn0&NR=1 28zn0&NR=1.
RequirementMethodStatus The payload must not exceed a weight of 1.45 Kgm.Design, Test The payload must conform to the WFF “no volt requirement”
RockSat-C 2012 LRR Launch Readiness Review University of Minnesota Alex Richman, Jacob Schultz, Justine Topel, Will Thorson 5/27/2012.
RockSat-C 2012 ISTR Individual Subsystem Testing Report Harding Flying Bison RockSat-C 2012 Rocket Team Harding University 13 February Team Members.
Section 1: Mission Overview Mission Statement Mission Objectives Expected Results System Modifications Functional Block Diagrams 2.
Scott Luisi, Abe Fark, Trent Quick, Jack Szmanda, Tom Valkenberg AEM 1905, 11/20/2008.
Preliminary Design Review Metro State College of Denver Matthew Hanley, Daniel Bass 14 November 2008.
RockOn! RockOn! Structure Build RockOn! 2009.
RamRack Conceptual Design Review Colorado State University Zach Glueckert Christopher Reed Timothy Schneider Brendan Sheridan Christina Watanuki Advisor:
RockSat-C 2013 SITR Payload Subsystem Integration and Testing Report University/Institution Team Members Date.
Cosmic Microwave Technology, Inc.
Instrumented Walker Status Update 2
Skillz That Killz Team 3 Final Presentation
Instrumented Walker Project Manager : Jairus Potts Rockwell Shields
Launch Readiness Review
<Your Team # > Your Team Name Here
Presentation transcript:

RockSat-C 2012 SITR Full Mission Simulation Report University of Minnesota Alexander Richman Jacob Schultz Justine Topel Will Thorson 4/23/2012

RockSat-C 2012 SITR Mission Overview Our mission is to demonstrate the feasibility of using active noise cancellation on board a rocket for future experiments. 2

RockSat-C 2012 SITR Mission Overview Our mission is to demonstrate the feasibility of using active noise cancellation on board a rocket for future experiments. We tested the impact g force on the structure without the onboard electronics because we still needed to complete a couple of the mounts and had to send the payload in to the shop to be modified. –The shop required the payload right away if we were to be able to get everything completed as soon as possible 3

RockSat-C 2012 SITR Mechanical/Structure The structure was slightly too large in diameter to fit in the canister. It has been taken back to the shop to be fitted properly. We also had to mill some holes in the canisters for running wires to connect all of the electronics throughout the payload. The integration procedure is a bottom up approach. The assembly starts with the bottom plate and build on top of it. 4

RockSat-C 2012 SITR Mechanical/Structure cont. We have a parts list and understand there will not be a machine shop at Wallops Our ballast for ensuring we have proper weight is weighted tape which can be found in golf stores. The exact weight of the payload will be determined when we get it back from the shop with the modifications. 5

RockSat-C 2012 SITR Mechanical/Structure cont. We tested the impact g force on the structure without the onboard electronics because we still needed to complete a couple of the mounts and had to send the payload in to the shop to be modified. The shop required the payload right away if we were to be able to get everything completed as soon as possible 6

RockSat-C 2012 SITR Mechanical/Structure For the test readiness review we have to test the vibrational durability of the electronics and their new mounts in the structure. We also have to get the final weight and properly ballast it. 7

RockSat-C 2012 SITR Electrical/CDH 8 Filters Data logger Power Standoff Mic 1 Standoff Mic 2 Battery Design overview: We have two identical chambers. The power supply, consisting of the battery and regulating circuit supplies power to both mics, the ANC system, the data logger and our filters. The mic signal is passed through the active filter/preamps and into the data logger.

RockSat-C 2012 SITR Power Supply Subsystem Overview We will be using the power supply that was flown last year. The power supply is in working condition and, with the new batteries we ordered, will be ready for flight. 9

RockSat-C 2012 SITR Power (EPS) Power supply has been tested Tests conducted –1 hour –See if it powers everything –Does is power everything? Yes -> Success When NASA connects the activation switch (Winchester switch), all subsystems will activate. 10

RockSat-C 2012 SITR Power (EPS) We had two new battery packs made. We have done testing recently using a plug-in power supply. We have to add a voltage divider/regulator to our development board for powering the microphones and ANC system. 11

RockSat-C 2012 SITR Data Logger Subsystem Overview We will be using the data logger that was flown last year. The data logger works, but we are adding low pass filters and a microphone preamp on the input side. 12

RockSat-C 2012 SITR Electrical/CDH The data collection system is working and we are getting data that is sensible from running tests. Tests conducted –Short Duration: 1-5 seconds –To see if there is a difference between the noise power between experimental and control methods –Power spectral analysis was used to determine success –We have seen a 3dB reduction in noise at this point (more on this later) Integration is still taking place. We are working on combining all of the things and don’t foresee any issues. 13

RockSat-C 2012 SITR Filtered Test Results The following graph shows the decibel level of attenuation from our ANC tests. –Data processed by bandpass filtering the control and test spectrum in 100 Hz increments, breaking down how effective the attenuation is by frequency. –Midpoints plotted, ex: Hz band is marked by 350 Hz on the plot 14

RockSat-C 2012 SITR ANC Filtered Test Results 15 The graph to the left shows a reduction in noise as measured in dB. This is a good result and shows that the system is working. We hope that it will be even better after adding the filter/preamp.

RockSat-C 2012 SITR Audio Spectrum Results – Test(Red) Control(Blue) 16 The fft shows a clear reduction in noise using the ANC system. The blue is the control case.

RockSat-C 2012 SITR Test Summary Everything worked as planned. All electronics communicated –The data logger saw the audio signal –Reasonable data was seen Sensors may need some calibration for robustness, although it is not essential 17

RockSat-C 2012 SITR Action Item Summary In the next week we are expecting to get shipments in with the parts for the filters and run tests with them and the data logger making sure everything interfaces correctly By the week after we expect to have the payload with all of the mounts and able to properly fit in the canister. We will put everything together and perform vibrational testing with a sub woofer. 18

RockSat-C 2012 SITR Pictures 19 Payload structure

RockSat-C 2012 SITR Pictures cont. 20 Microphone and speaker Power supply Data logger

RockSat-C 2012 SITR Conclusions We are finishing work on fixing all of the issues which popped up during full system integration and mission testing. We have some work to do but we still believe we will be ready to fly by launch. 21

RockSat-C 2012 SITR Appendix Extra/additional data plots Additional data not immediately relevant to presentation