VLBI Facility report - Mar 2003 Tasso Tzioumis ATNF CSIRO.

Slides:



Advertisements
Similar presentations
Australian Report -- The view from down under
Advertisements

Towards the e-APT Tasso Tzioumis ATNF
VLBI progress Down-under Tasso Tzioumis Australia Telescope National Facility (ATNF) 25 September 2008.
E-VLBI down-under Tasso Tzioumis ATNF, CSIRO July 2005 Towards e-VLBI.
E-VLBI Progress with the LBA Chris Phillips, eVLBI Project Scientist November 2011.
Science Operations Phil Edwards 30 October 2012 Space for collaborator logos [delete instructions before use] CSIRO ASTRONOMY & SPACE SCIENCE.
E-VLBI progress in the South Tasso Tzioumis ATNF, CSIRO September 2006 “Towards e-VLBI”  “e-VLBI”
A supercomputer-based software correlator at the Swinburne University of Technology Tingay, S.J. and Deller, A.
Baseband Processing and SKA Simulations using Supercomputers: Enhancing Australia‘s radio astronomy facilities and its bid for the SKA Steven Tingay Swinburne.
Spectrum Management: Parkes & ATCA Briefing for ATUC members CSIRO ASTRONOMY AND SPACE SCIENCE Erik Lensson | Head, ATNF Engineering Operations 30 October.
Line Efficiency     Percentage Month Today’s Date
Decadal Plan UNSW, 17 Dec 2004 Australia Telescope Operated by CSIRO as a National Facility since 1990 As a National Facility, the Australia Telescope.
ATCA and Mopra Phil Edwards. VSOP observations with ATCA 190 observations with Mopra.
Baseband processing, e-VLBI, and SKA simulations Steven Tingay Swinburne University of Technology MNRF Symposium, 8 June, 2004.
Mopra Time Allocation Mopra publications performance Mopra time allocation statistics Mopra Large Projects Proposal applications for 2012 APRS Jessica.
Radio Quiet Zones (RQZ) History and Current Activities Tasso Tzioumis ATNF, CSIRO.
Australian Radio Astronomy Facilities Tasso Tzioumis Australia Telescope National Facility CSIRO Spectrum Management Coordinator
VLBI Report LBA Operations & eVLBI Tasso Tzioumis ATNF May 2008.
03/000 VLBI Australian Government Geoscience Australia.
Current LBA Developments Chris Phillips CSIRO ATNF 13/7/2005.
Mark Bowen Acting Theme Leader – Technologies for Radio Astronomy CSIRO Astronomy and Space Science 14 October 2010 Australia Telescope Users Committee.
VSOP-2 the role of Hobart and Ceduna? Simon Ellingsen University of Tasmania Centre for Astrophysics of Compact Objects.
Recent Developments in Australia Phil Edwards Head of Science Operations CSIRO ATNF.
E-VLBI at ≥ 1 Gbps -- “unlimited” networks? Tasso Tzioumis Australia Telescope National Facility (ATNF) 4 November 2008.
LBA Calibrator Survey Chris Phillips eVLBI Project Scientist 23 July 2009.
Session 10: Space Data Support to GFOI R&D DLR Contributing Data Stream Report SDCG-7 Sydney, Australia March 4 th – 6 th 2015 Helmut Staudenrausch, DLR.
(Spectral Line) VLBI Chris Phillips CSIRO ATNF Chris Phillips CSIRO ATNF.
2003 LBA Ops meeting Tasso Tzioumis. Previous LBA ops meeting 3 April 2003, Hobart Minutes on
ATUC meeting Director’s Report Brian Boyle November 2007.
VLBI/eVLBI with the 305-m Arecibo Radio Telescope Chris Salter Tapasi Ghosh Emmanuel Momjian Arun Venkataraman Jon Hagen.
EVLBI and the Australian SKA Pathfinder (ASKAP) Prof. Steven Tingay Curtin University of Technology Perth, Australia 7th eVLBI workshop SHAO, 2008 June.
ATNF Users’ Committee: Director’s Update CSIRO Astronomy and Space Science Philip Diamond, Chief CASS & Director ATNF 11 July 2012.
Status and capabilities of the Australian LBA Phil Diamond Chief, Astronomy & Space Science.
ATNF Operations Douglas Bock ATUC – 25 NOVEMBER 2014.
Astro Report to ATUC – October 2011 Simon Johnston Head Astrophysics, CASS ATUC, October 2011.
An FX software correlator for VLBI Adam Deller Swinburne University Australia Telescope National Facility (ATNF)
ATUC meeting Director’s Report Lewis Ball October 2008 Gomez et al P616 H 2 O maser AGB star.
Collaborative Research Projects in Australia: Radio Astronomy Dr. Greg Wickham (AARNet) Dr Tasso Tzioumis Dr Shaun Amy Dr Chris Phillips (CSIRO ATNF) Global.
Network Connections – e-VLBI Tasso Tzioumis ATNF.
Parkes ATUC Report Nov Stats Scheduled observing time (2007) –85% Downtime (last 12 months): –1% system faults –3.1% high wind.
Using the Trapezoidal Model to Derate NW Hydro Capacity Resource Adequacy Technical Committee July 25, 2007 Portland, Oregon.
VLBI Developments in Australia ASTRONOMY AND SPACE SCIENCE Chris Phillips| LBA Lead Scientist 11 November 2014.
Jan 2016 Solar Lunar Data.
Japan proposal on schedule
Director’s Update AT Users’ Committee -- November 2016
Best viewed in slide show mode (F5)
Japan proposal on schedule
Average Monthly Temperature and Rainfall
80-Hour SHARP Certification Course Schedule
OECD and Radio Astronomy Spectrum
Radio Astronomy Spectrum Management in practice – Australia (ATNF)
Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
LBA05 ops meeting Tasso Tzioumis
FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule
Proposed Strategic Planning Process for FY 2013/14 thru FY 2015/16
MONTH CYCLE BEGINS CYCLE ENDS DUE TO FINANCE JUL /2/2015
on propulsion of OBD2 gtr
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Presentation transcript:

VLBI Facility report - Mar 2003 Tasso Tzioumis ATNF CSIRO

Report timing Last report Nov 2002 – 4 months ago Early ATUC + late AT steering committee -- no detailed stats available TAC meeting follows 5-6 March - proposal stats? LBA strategic review – 5 March  Short report – details next meeting

The LBA in brief ATNF – Parkes, ATCA, Mopra, LBA-Correlator UTas – Hobart, Ceduna Tidbinbilla (NASA) -- limited access Hartebeesthoek (S. Africa); – Kokee Park (USNO) ++ adhoc others Observe at all AT-bands - 1.4, 1.6, 2.3, 4.8, 6.0, 6.7, 8.4, (12), 22 GHz Observations 5-10 days /term Usually “block” session + “special” days

LBA Proposals Proposals – through ATNF ATAC -- (1-year lifetime) ~ 6 new proposals /term Overall oversubscription rate - ~2 Schedule time on 5-6 proposals/term Expired proposals – notification? - adhoc at present (TAC group; scheduler; operations) Better mechanism to be developed

Operations Successful observations November 02 and February 03. No major known failures in last year Observational support problematic - more people are needed Correlation progress still slow (people?) - casual student operator in Jan-Feb - may try to continue practice

Scheduling Access to Tid (70m) difficult for VLBI (Access via SIM mission for astrometry project) Short time periods available (spectroscopy) 2-3 x (10-12hr) slots (VLBI?) Ceduna only manned during LBA “block” sessions Available for whole session  Conflict -- Ceduna vs. Tid scheduling

People movements Steven Tingay - ATCA  Swinbourne (Jan 03) Richard Dodson - UTas  Japan (Nov 02) Hayley Bignall (UAdel)  JIVE (Jan 03) Tracy Getts  netball coaching (Dec 02) Paul Jones – 6 months LBA correlator (Jul 02) Chris Phillips – Bolton fellow (technical) (Sep 02) Casual correlator operator Jan-Feb 03 - need more ?

VSOP NASA support ceased Feb 2002 (5 years) Survey program continues - S2 recording + Canadian correlator - until Feb 2003  Aug 2003 Request for Mopra support via ATAC per term LBA – Mp, Ho, (Hh) ~ 1-2 obs/week Since end Jan – HALCA attitude control loss - not recovered yet…. Observations cancelled till further notice

LBA Future New technologies (Disk recording; fibres) - 1+ Gb/s rates (vs. 128 Mb/s now) NTIV (New technologies in VLBI) meeting in Korea (5-8 Nov 2002) – 6 people from ATNF LBA strategic plan - open meeting 5 March will report to next ATUC +(Steering Ctee?) “All welcome” Plan LBA path for near future UTas VLBI centre??? Far future is SKA?

Radio Quiet Zones SKA & LOFAR - separate reports? Productivity Commission review of Radiocommunications Act in 2002 ATNF submission for “radio sensitive zones” around existing telescopes (ATCA, Parkes) Rec 10.4 in report  cabinet!!! DEST – ACA agreement to implement via ACA regulations and practices. Will be following up with ACA Prelude to international “radio quiet reserves”? Follow up at ITU-R