EVLA Monitor & Control Transition System Software

Slides:



Advertisements
Similar presentations
Test Builder & Test Executor Sonja Vrcic Socorro, December 12, 2007.
Advertisements

14-Jun-2004EVLA Software Design Review Transition Plan Bill Sahr 1 EVLA Hybrid Array & Transition Plan.
National Radio Astronomy Observatory June 13/14, 2005 EVLA Phase II Proposal Review EVLA Phase II Computing Development Bryan Butler (EVLA System Engineer.
Bill SahrEVLA M&C Transition System Software CDR December 5-6, EVLA Monitor & Control Transition System Software Overview.
EVLA Computing Schedule, Staffing, Testing, Tracking.
The Prototype Correlator Sonja Vrcic Socorro, 5. December, 2006.
WIDAR Prototype Testing User Interface Software Kevin Ryan NRAO-DRAO Face-to-Face Meeting April 3, 2006.
EVLA Computing Overview Gareth Hunt EVLA Advisory Committee 2002 June
5-6 Dec, 2006EVLA M&C Critical Design ReviewRich Moeser 1 User Interfaces Rich Moeser.
Hichem Ben Frej 5-Dec-2006 EVLA M&C Transition Software CDR CMP: Control Monitor Processor 1 Hichem Ben Frej Kevin Ryan.
P. Dewdney Herzberg Institute of Astrophysics National Research Council Canada The EVLA Correlator.
Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Project Overview Mark McKinnon Project Manager.
Overall Data Processing Architecture Review EVLA Monitor and Control Interfaces July , 2002EVLA Data Processing PDR Bill Sahr.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
Bill SahrEVLA Advisory Committee Meeting May 8-9, EVLA Monitor & Control.
Bill Sahr EVLA M&C EVLA Advisory Committee Meeting December 14-15, EVLA Monitor & Control.
Project Overview and Status EVLA Advisory Committee Meeting, March 19-20, 2009 Mark McKinnon EVLA Project Manager.
Pre-OTS Testing in Penticton Sonja Vrcic Socorro, December 11, 2007.
Software Status Sonja Vrcic Socorro,
Gustaaf van MoorselEVLA Advisory Committee Meeting May 8-9, 2006 EVLA Computing Software Overview.
Peter NapierEVLA Correlator CoDR Nov 2, EVLA Correlator CoDR P. Napier Overall EVLA Project Plan.
Sean M. Dougherty Dominion Radio Astrophysical Observatory Herzberg Institute of Astrophysics National Research Council Canada The WIDAR Correlator.
Long Term Transition Plan Gareth Hunt EVLA M&C PDR 2002 May 15.
R MoeserCorrelator f2f Meeting1 MCAF (Metadata Capture and Formatting) Rich Moeser.
2007Sep06 EAC Butler - Software Overview 1 Software Overview Bryan Butler.
P. NapierEVLA Advisory Committee Meeting September 8-9, EVLA Advisory Committee Project Overview P. Napier, Project Manager Management, Schedule,
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Overview Peter Napier, EVLA Project Manager Status 2003 Committee Response.
14 June, 2004 EVLA Overall Design Subsystems II Tom Morgan 1 EVLA Overall Software Design Final Internal Review Subsystems II by Tom Morgan.
Introduction to EVLA Software Bryan Butler. 2006Dec05/06EVLA M&C Transition Software CDR2 EVLA Computing (Terse) History The original EVLA Phase I proposal.
Gustaaf van MoorselEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Computing Organization/Development.
EVLA Computing Software Overview. Gustaaf van MoorselEVLA Advisory Committee Meeting May 8-9, Contents History Organization and staffing Staffing.
EVLA Monitor & Control EVLA Advisory Committee June 10 – 11, 2002.
Output Formats Part I Bryan Butler NRAO Oct-31EVLA Correlator f2f2 Overview 2 types of data: –Monitor data - of interest to engineers and system.
Mark McKinnon NSF Mid-Project Review May 11-12, Baseline Project Definition Mark McKinnon Project Manager.
EVLA Monitor & Control Software PDR E2E Interfaces: Observation Scheduling Complaints to: Boyd Waters John Benson, Barry Clark, Tim Cornwell, Rich Moeser,
Interim Data Capture & Format (IDCAF) Walter Brisken 2006 Dec 6.
RupenEVLA Advisory Committee Meeting May 8-9, Software Requirements Michael P. Rupen EVLA Project Scientist for Software rev. 3may06.
M.P. RupenEVLA Advisory Committee Meeting September 6-7, Correlator Test Plan Michael P. Rupen.
Correlator GUI Sonja Vrcic Socorro, April 3, 2006.
M. McKinnonEVLA Advisory Committee Meeting September 6-7, Project Overview Mark McKinnon Project Manager.
Frazer OwenNSF EVLA Mid-Project Review May 11-12, Transition to EVLA
EVLA Monitor & Control Software PDR Status. May 15, 2002EVLA Monitor & Control Software PDR Bill Sahr 2 Requirements, Schedule Requirements (High Level,
Gustaaf van MoorselEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Computing End-to-end (E2e) software.
Software Requirements for the Testing of Prototype Correlator Sonja Vrcic Socorro, December 11, 2007.
Bill SahrNSF Review May , EVLA Monitor & Control.
Computing Introduction Gareth Hunt EVLA System PDR 2001 December 04.
P.NapierEVLA Advisory Committee, 10 June, EVLA ADVISORY COMMITTEE PROJECT OVERVIEW Scope Organization Schedule Budget, personnel.
Master Correlator Control Computer (MCCC) Requirements & Status Sonja Vrcic Socorro, December 12, 2007.
EVLA M&C CDR EVLA Monitor Data Archive System John Benson, Chunai Cai NRAO Dec 6, 2006.
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Management Plan Peter Napier Project Organization Schedule Budget.
Software Overview Sonja Vrcic
Bryan Butler EVLA Computing Division Head
Monitor and Control Software
EVLA Computing Software Overview.
Antenna Monitor & Control Subsystem Engineering Requirements
Software Requirements
VLA to EVLA Transition Plan
Bryan Butler (for Bill Sahr)
EVLA Advisory Committee Meeting
Software Requirements
EVLA Monitor & Control System
Software Requirements
Mark McKinnon EVLA Project Manager
Background Information P.Napier
EVLA Advisory Committee Meeting, March 19-20, 2009
EVLA M&C Components Observation Executor, Interim & Final Obs2script
Correlator Growth Path
EVLA Monitor & Control Bill Sahr NSF Review May , 2006
EVLA Construction Status
Requirements Bryan Butler.
Presentation transcript:

EVLA Monitor & Control Transition System Software Organization, Budget, Schedules /users/bsahr/EVLA/MandC_CDR/WJS_Presentations/WJS_OrgBudgtSched_CDR.ppt EVLA M&C Transition System Software CDR December 5-6, 2006 Bill Sahr

Organization – ECD Staffing

Organization – ECD Staffing, M&C SW Dev Hichem Ben Frej – CMP, MIB/module, deformatter port Bryan Butler – obs2script, design, software management Chunai Cai – deformatter (earlier), Telcal multicast, Telcal display, Flagging (1st version), monitor data archive, monitor data retrieval Richard Moeser – user interface software, communications Martin Pokorny – WIDAR correlator software Bruce Rowen – new correlator controller, WIDAR correlator software Kevin Ryan – WIDAR correlator software Ken Sowinski – new correlator controller, Telcal, parameters data base, extensive consultation in many areas including but not limited to MIB/module SW, CMP, Vis Pipe, Flagging, IDCAF, VLA antenna screens, plus invaluable assistance with the characterization and debugging of EVLA antenna performance Pete Whiteis – MIB/module software, MIB systems sw, Vis Pipe software EVLA M&C Transition System Software CDR December 5-6, 2006 Bill Sahr

Organization – Effort Contributed Directly to EVLA M&C SW Dev John Benson – monitor data archive, VLA archive, EVLA archive Walter Brisken – IDCAF Brent Carlson (DRAO) – numerous, detailed, high quality software specifications, plus many other contributions Barry Clark – Observation Executor, extensive consultation in many areas too numerous to mention, plus invaluable assistance with the characterization and debugging of EVLA antenna performance Dave Del Rizzo (DRAO) – Real-Time Data Display software Ray Ferraro – new correlator controller HW Dave Fort (DRAO) – utility & test software for the Station Board Clayton Frank Helvey (contractor) – MIB/module software, esp MIB Systems software Michael Rupen – Binary Data Format spec, SDM spec, other correl issues Pat Van Buskirk – monitor data archive, numerous operational issues Sonja Vrcic – Station Board software, WIDAR correlator software EVLA M&C Transition System Software CDR December 5-6, 2006 Bill Sahr

Organization – Staffing levels One (1) EVLA M&C Group Leader Nine (9) individuals in the ECD working directly on EVLA M&C software development Eleven (11) scientists and engineers making significant contributions directly to &/or actually developing EVLA M&C software Many significant contributions from numerous individuals omitted – Gene Cole, Mark McKinnon, Rick Perley, Steve Durand, Jim Jackson, Peggy Perley, VLA Operators, numerous hardware engineers, many others EVLA M&C Transition System Software CDR December 5-6, 2006 Bill Sahr

EVLA M&C Transition System Software CDR Organization - Code From Jan through June 2006, biweekly code reviews The code reviews will probably be resumed Design reviews have been requested CVS used for source code control since earliest days of the project. Agreed upon, standard dir/subdir structure Now transitioning to Subversion Maven and make files used for builds Update to Maven 2.0 planned Nightly code builds Agreed upon system for code distribution EVLA M&C Transition System Software CDR December 5-6, 2006 Bill Sahr

Budget - WBS Categories The software categories were formulated in 2001, before there was a software design, so they do not map well onto actual high level software tasks The software categories do provide a means of organizing the funds The hardware categories do map reasonably well onto reality. EVLA M&C Transition System Software CDR December 5-6, 2006 Bill Sahr

WBS Categories – Transition & Final System EVLA M&C Transition System Software CDR December 5-6, 2006 Bill Sahr

WBS Categories: Funding – Transition & Final System   M & S, Othr - Totals (includes contractors) WBS Name 2002 2003 2004 2005 2006 2007 2008 2009 2010 Totals 6.10.01 Mngmnt/Subsys 0.0 4.7 3.3 3.8 7.0 7.2 5.3 31.3 6.10.05.05 Phys Interface 33.3 93.8 49.3 361.5 443.4 25.8 7.7 2.5 1,017.4 6.10.05.10 M302 & M303 9.0 10.0 20.8 109.0 6.10.10 M&C Network 0.6 21.0 86.9 94.8 15.3 138.5 83.8 87.4 21.2 549.5 6.10.15 M&C Cmpting Systems 175.2 131.3 57.7 53.4 70.5 125.5 144.5 108.0 217.5 1,083.7 6.10.20.05 Stabilization of the VLA 6.10.20.10 Requirements 6.10.20.15 Arch & Design 6.10.20.20 Tst & Dev, Ant 6.10.20.25 Mid Level Anlysis & Dsgn 6.10.20.30 Test & Dev Correlator 54.1 45.2 52.6 35.0 186.8 6.10.20.35 Detailed Design & Coding 1.8 152.2 4.2 16.0 9.2 183.5 6.10.25 M301 4.4 0.1 52.4 12.5 0.7 70.0 6.10.30 M&C Transition Hardware 7.9 2.8 13.5 1.4 14.3 12.1 13.3 65.2 209.2 255.8 367.0 540.8 609.9 407.6 321.9 289.8 294.4 3,296.5 9

WBS – 6.10.15, M&C Computing Systems, HW & SW Approximately $1M allocated over the life of the project MIB Systems SW: OS, Network stack, Ethernet driver, shell – purchase, port, support MIB SW Dev Systems: laptop, toolset, debugger SW & HW Oracle license (& support) for the monitor data archive Workstations for SW development The EVLA M&C computing platforms The CMP hardware EVLA M&C Transition System Software CDR December 5-6, 2006 Bill Sahr

EVLA M&C Transition System Software CDR Schedules – Planning EVLA M&C Software Development Plan EVLA_MandC.mpp, an MS Project worksheet Task sheet view of the current version on CDR web page Task list: basically functional decomposition Start & finish dates, duration Percent complete Predecessors Resources EVLA M&C Transition System Software CDR December 5-6, 2006 Bill Sahr

Schedules – Planning EVLA_MandC.mpp EVLA M&C Transition System Software CDR December 5-6, 2006 Bill Sahr

EVLA M&C Software Goals/Milestones Transition System Support for EVLA antenna hardware development Support use of EVLA antennas in scientific observations Replacement of the Modcomp-based VLA control system Support WIDAR prototype board tests & prototype correlator Support for design & development of final system architecture: lessons learned, carryover, testbed Final System Final System Architecture: Observation Executor, Device Objects, Full Alerts Subsystem, Archive IF, & more Support for full version of WIDAR correlator: Obs Exec, EVLA Telcal, EVLA DCAF, MCCC SW (VCI, config mapping), CPCC SW, MAHs/Dev Drvrs V2, System GUIs, & much more EVLA M&C Transition System Software CDR December 5-6, 2006 Bill Sahr

Replacement of Modcomp-based VLA Control System Retirement of the Modcomp-based VLA Control System By the end of Q2 2007 (end of June 2007) Major Steps remaining: VLA correlator output (Visibility Pipe): mid Jan 2007 VLA format archive records (IDCAF): early Feb 2007 Monitor and control of VLA antennas: late Feb 2007 Monitor and control of VLA correlator: early Mar 2007 Operator Training, Modcomp Repl System: starts late Feb 2007 Parallel operation & testing: Apr – Jun 2007 EVLA M&C Transition System Software CDR December 5-6, 2006 Bill Sahr

EVLA M&C Transition System Software CDR Prototype Correlator Installation at the VLA site: Jan 2008 DRAO on-the-sky (OTS) testing: Feb thru mid-May 2008 Main NRAO responsibilities: Supply delay models & integration control parameters Prototype CBE/FF with Binary Data Format output Archive records (IDCAF2) & Archiving Sufficient post processing capabilities An exercise in NRAO-DRAO coordination EVLA M&C Transition System Software CDR December 5-6, 2006 Bill Sahr

Prototype Correlator - Planning EVLA M&C Transition System Software CDR December 5-6, 2006 Bill Sahr