STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 Workplan - Months 1-6 Colm O’Dwyer University College Cork (UCC) STABLE kick-off meeting Torino.

Slides:



Advertisements
Similar presentations
Info Day on New Calls and Partner Café Brussels, 10 February 2011 How to apply – Budget and Reporting.
Advertisements

FCMAT Response & Preparation: Process Outline October 25, 2006.
Achieve Benefit from IT Projects. Aim This presentation is prepared to support and give a general overview of the ‘How to Achieve Benefits from IT Projects’
Information and Communication Technologies (ICT) in the Seventh Framework Programme Support actions.
Silicon-Organic hybrid Fabrication platform for Integrated circuits Kick-off Meeting 01/08/2010 Partner Presentations - UKA.
Key issues in project reporting Jakub Rutkowski Project Annual meeting , Hannover.
TRIUMPH Meeting Cork P. Vorreau WP1 Universität Karlsruhe (TH) Institute of High-Frequency and Quantum Electronics.
SINPHONIE project WP8 Communication and dissemination SINPHONIE Project kick-off meeting November, REC Conference Center, Szentendre Hungary Eva.
Info Day on New Calls and Partner Café Brussels, 8 September 2010 How to apply – Budget and Reporting.
Prepared by: Harvard University, Office of the UCIO Harvard University IT Services Integration Initiative Program Management Planning Meeting January 10,
Ladoga Telecom PROJECT WEBSITE DEVELOPMENT Artem Rutkovsky project manager Ladoga Telecom.
STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 WP 7 Scientific coordination First phase (M1-M6) QIUPING CHEN POLITECNICO DI TORINO STABLE.
EGEE is a project funded by the European Union under contract IST NA2 Dissemination John DYER Activity Leader All Activity Meeting, CERN 18.
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
Management structure and procedures KickOff Meeting ICT-AGRI 2 4 th – 5 th Februrary 2014 Niels Gøtke, Iver Thysen Jan Erpenbach, Elke Saggau.
Multilateral Project for Transfer of Innovation Project Duration: 24 months Partners’ Kick-off Meeting, November 2009, Sofia Tanya Pancheva/University.
RES-H-Policy kick of meeting Freiburg, October 2008 Giakoumi Argyro MSc, Physics Centre for Renewable Energy Sources (CRES) Energy Policy Analysis.
Project acronym: TEACH Ref. Project: EACEA Harmonization of Preschool Teacher Education Curricula in Serbia.
Technology Strategy Board Driving Innovation Participation in Framework Programme 7 Octavio Pernas, UK NCP for Health (Industry) 11 th April 2012.
WP1 Management. N° of work package: 1 Management Duration in months: 36+2 EGEC Description of the tasks: 1.1. Project Management (EGEC) Coordination in.
NET-SHARE Kick-off meeting Matosinhos, Portugal April 15 h 2008 ICT Policy Support Programme (ICT PSP) WPs and ACTION POINTS.
Work Package 5 Internet Platform for Cybertaxonomy.
IST WP8: Project management Žiga Turk 2nd SciX Review Luxembourg, 17 th Nov IST
Course Summary IS-701.A – February 2010 Visual 6.1 Unit 6: Course Summary.
STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 POLITO’s proposal for measurement standard cell STABLE project 1 st skype call November 22.
Considerations for CIHR’s New Open Program. The Context Bottom up Strategy Reform of Open Suite of Programs Full spectrum of CIHR mandate Top Down Strategy.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
WP1 Consortium management OBJECTIVES To ensure compliance with the Grant Agreement and Consortium agreement Specific objectives: 1: To secure day-to-day.
Project acronym: TEACH Ref. Project: EACEA Harmonization of Preschool Teacher Education Curricula in Serbia Activities by Month 2015.
STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 WP5 Assembly and optimization of complete cell Iratxe de Meatza CEGASA STABLE kick-off meeting.
[Exercise Name] Full Scale Exercise Player Hotwash [Location] [Date] [Logo Here]
SIforAge Partner Presentation Of Your Organization February 2013 YOUR Organizations Logo.
Demonstrators and Pan-European Services Laboratory WP5 session.
RARECARENet: how will we work together?. Information network on rare cancers Advisory Board The Coordinator (Project Management Team) Steering Committee.
1 Environmental Services Training Group LOCAL AUTHORITY ENVIRONMENT CONFERENCE 2015 Protecting Our Environment Hodson Bay Hotel, Athlone, May 2015.
Process Center of Excellence 0409 Key contacts: STEP 6 - EXECUTION PHASE: IMPLEMENTATION - READINESS FOR CHANGE/GO-LIVE READI Assessment Plan: Detail the.
QUALITY OF THE MANAGEMENT PLAN 15 Points (recommend 5 pages)
EDINET PROJECT DISSEMINATION ACTIVITIES. DISSEMINATION Dissemination activities will be continued for the period of project realization, to be contributed.
GTZ | Tim Mahler| Project Management Project Management.
‘ AIDING THE PEACE’ - MULTI-DONOR EVALUATION OF SUPPORT TO CONFLICT PREVENTION AND PEACEBUILDING IN SOUTHERN SUDAN Background on the evaluation:
Project preparation workshop “Bringing a transnational project to life” Project idea “Challenges and chances from Climate Change for regional and local.
STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 LUREDERRA’s proposal of commercial compounds to be used as anode, cathode and electrolyte STABLE.
STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 Synthesis and optimization of electrolyte of Li-air cells David Amantia Christophe Aucher LEITAT.
ERASMUS+ EMREX – Status report 1/2015 EMREX status template.
Task 4.1 Communication Strategy Task 4.3 Networking and Dissemination Activities Task 4.4 Communication Kit Task Leader: ADELPHI Research AWARE Kick-off.
STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 WP 6 Life cycle assessment 1 st 6 months Mats Zackrisson STABLE kick-off meeting Torino - October.
WP1- Management EuroVO-DCA 1 st PCT Meeting – 3&4 May 2007 Mathias DEPRETZ – EuroVO-DCA Project Manager 1 st PCT meeting 3&4 May 2007 Strasbourg EuroVO.
Action 12:Internal Monitoring BMW Regional Assembly.
Use of resources and EC funding in year 2 EuCARD Governing Board meeting , CNRS, Paris Overview of EuCARD WPs and budget Use of resources by.
STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 WP1 Synthesis and optimization of anode materials for Li-air battery Leticia Ciganda LUREDERRA.
FUSE TEMPUS Project Coordination Meeting Belgrade University, 27 and 28 November, 2014 WP 5 PROGRESS Dissemination of Project-Related Information WP leader.
TELplus WP 1 “Making searchable digitised images via OCR” TELplus Kick-off Meeting Tallinn, 15./16. October 2007 Max Kaiser / Joachim Korb Austrian National.
Auto N omous, self-Learning, OPTI mal and comp L ete U nderwater S ystems NOPTILUS FP7-ICT : Information and Communication Technologies NOPTILUS.
Everywhere Bergen – Dec Agenda Day 1 Funding options Research Interests Consortium Structure Industrial Partners Roadmap 2.
Implementation Management Project Steven Wilson, Jakob Rhyner  Objective: Implementing Future Earth, based on the initial desgn of the Transition Team.
ICT Smartcities 2013 FP7-SMARTCITIES-2013 WP6 – Project Management OPTIMising the energy USe in cities with smart decision support system (OPTIMUS) Objective.
LOGO Организация кредитования в Республике Беларусь Костенко А.К., к.э.н., доцент.
涉外合同中的法律适用问题 --- 以上海地区为例 Group 2 吕雅丽 王燕玉 刘彧 孙煜 韦卫玲 李天奇 LOGO.
WP9: Dissemination and Exploitation
AVID Collaborative Study Groups.
Date of download: 10/17/2017 Copyright © ASME. All rights reserved.
1st Quality Assurance Committee meeting
دانشگاه شهیدرجایی تهران
تعهدات مشتری در کنوانسیون بیع بین المللی
1st Quality Assurance Committee meeting
Shodmonov M.. The main goal of the work Analysis.
REPUBLIC OF MACEDONIA STATE STATISTICAL OFFICE
Dissemination of the project and finding equipment
Determination of the Scope and Form of Census Data Dissemination
Presentation transcript:

STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 Workplan - Months 1-6 Colm O’Dwyer University College Cork (UCC) STABLE kick-off meeting Torino - October 25 th - 26 th, 2012

STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 LOGO PARTNER INSTITUTION Summary Overview oWorkplan Months 1-6 oCo-involvement/parallel investigations

STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 LOGO PARTNER INSTITUTION Overview Involvement in WPs WP 5: Preparations in M1-6 so that UCC are ready to conduct testing with partner materials and assemblies when needed – equipment and personnel in place before M6 WPs 7,8: Initial pre-flight planning and strategies for project, together with all partners UCC will be in a position to contribute to WPs 1-3 within the first 6 months if required

STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 LOGO PARTNER INSTITUTION Summary oOverview Workplan Months 1-6 Co-involvement/parallel investigations

STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 LOGO PARTNER INSTITUTION Workplan Months 1-6  Full setup of half cell electrochemical suite for characterization of materials from the beginning (although not committed until M6)  Hiring key postdoctoral personnel for research work, PD from Dec 12  Feedback interaction with WP1 and 2 for cathode and anode materials – provision for bespoke investigations (electrochemical, analytical) prior to WP 4 and 5  Interactive experimental and consortium level planning for important first phase – advert, press, dissemination preparation (WP8)  Preparation for M6 consortium meeting in Cork (WP7)

STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 LOGO PARTNER INSTITUTION Thank you for your attention