Agenda. WP1 – Project Management Start M0, finish M36 CIP lead Progress to date & plans for next 6 months: –Deliverables –Financials –Annual review –Audits.

Slides:



Advertisements
Similar presentations
StratusLab is co-funded by the European Community’s Seventh Framework Programme (Capacities) Grant Agreement INFSO-RI Management Overview StratusLab.
Advertisements

Funding: STEER – INTELLIGENT ENERGY EUROPE (IEE) Grant Agreement IEE/10/290/SI Full title: ECOSTARS Europe Acronym: ECOSTARS Project start date:
TRIUMPH Meeting Cork P. Vorreau WP1 Universität Karlsruhe (TH) Institute of High-Frequency and Quantum Electronics.
GENIUS T4 - September 2014 GENIUS T4 Teleconference X. Luri.
WP1 – Project Management Start M0, finish M36 CIP lead Progress to date & plans for next 6 months: –Deliverables –Financials –Audits.
UGDIE PROJECT MEETING Athens – September On-site Final Review Venue and dates –Genoa, UGDIE + SCIRO premises –December 2 nd (afternoon) –
Supported by Project Administration Second Project Meeting London, 10/11 March 2009 Liv Becker / Veit Bürger, Öko-Institut e.V.
RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework programme RENAISSANCE - LYON - FRANCE 1 Technical seminar (WP0.
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
INFSO-RI Enabling Grids for E-sciencE Financial Status EGEE Collaboration Board – Athens – April 20 th, Severine Bergerot.
Northern Periphery Programme Final Administrative Report Lead Partner Seminar 22 nd February 2012.
2-6th June 2003 WP6 MAMA project WWW WP6 MAMA WWW 4 rd MAMA Meeting ROME, 3-6th June 2003 IFREMER coordinator Responsible
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
Agenda TopicSpeaker Wednesday Coffee and welcome Project update over last 6 monthsGDM (general stuff, financials etc) Workpackage reviews, updates and.
SLHC-PP Admin News Admin guide Time sheets Effort Web Pages 1 st Deliverable Report SLHC-PP Steering Committee Meeting CERN, July 3 rd, 2008.
Coordinating EC Research Projects Paul Drath Singleimage Limited 3 Foundry Walk St Ives Cambs PE27 5FW phone fax
SCAMPI Review WP6: Project Management 3r d Annual Review of Project CNET-ICT Beaulieu, Brussels, Belgium 26 November, 2013.
European Commission DG for Fisheries and maritime affairs Research & scientific analysis 1 The 6th Framework Programme Project UNCOVER Kick-off.
WP0 Management Gillian Armitt. Outline Objectives for Year 2 Progress Issues resolved/outstanding Forward planning Electronic submission of Form C.
Project overview: objectives, work programme & management guidelines FIRST MEETING OF EUROPEAN POLICY CORE GROUP Thursday, 03 March 2005 in Berlin PRESENTATION.
Reporting Guidelines (FP5) Karen Fabbri Scientific Officer Natural & Technological Hazards DG Research European Commission Brussels
Centre for Genetic Resources, the Netherlands Chris Kik, CGN, Wageningen, the Netherlands LEAFY VEGETABLES WP5 Coordination.
Centre for Genetic Resources, the Netherlands Chris Kik, CGN, Wageningen, the Netherlands LEAFY VEGETABLES WP5 Coordination.
Project proposal for ISO :2011 implementation Subtitle or presenter.
WP1 – Project management EuroVO-ICE– First review – 26 October 2010 Françoise Genova, EuroVO-ICE coordinator,1 WP1 Management.
Project Reporting for the EuCARD Integrating Activity Project Based on: - Provisions of the Grant Agreement (GA) and its annexes - FP7 Guide on Project.
Agenda TopicSpeaker Coffee and welcome Project update over last 6 monthsGDM (general stuff, financials etc) Workpackage updatesWorkpackage leaders Demonstrator.
Green Partnerships Local Partnerships for Greener Cities and Regions Study visit and 3 rd Steering Committee meeting Freiburg, 14 – 18 October 2013.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
3.4 Budgeting HL Chapter 21. What is a Budget? A budget is a detailed financial plan for the future. A budget holder is the individual responsible for.
SLHC – PP Management Plan April 3 rd, 2008 M. Capeans, M. Ropka CERN April 3, 20081M.C.
Work Package 4 Practicalities Kick-off meeting Judith Freita Ramos Project Deputy for Detectors at ESS.
Agenda TopicSpeaker Coffee and welcome Project update over last 6 monthsGDM (general stuff, financials etc) Workpackage updatesWorkpackage leaders Demonstrator.
CODE 2 Cogeneration Observatory and Dissemination Europe Kick-off meeting July 2012 WP1 Management 10-11/07/2012COGEN Europe.
Slide 1 PAO MO75 M. Hugon D:/DATA/POWERPNT/HNML. 0107kickoffconcertedaction ADvanced Options for P&T ADOPT Thematic Network kick-off Meeting.
Status of Annual Report : Submitting of the Annual Report with only 3-days delay..not final version due to the non-final financial information.
FP OntoGrid: Paving the way for Knowledgeable Grid Services and Systems 15 th –17 th June 2005 Athens Summary Athens meeting A.
INFSO-RI Enabling Grids for E-sciencE Resources and Budget Robin Middleton PMB – 13 July 2005.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
NSHIELD Project Meeting Brussels - 15 Feb 2012 Luigi Trono.
SAI Performance Measurement Framework The SAI Performance Measurement Framework Presented by: Marcela Mora, IDI Young EUROSAI Jerusalem, 10 November 2015.
Negotiation of Proposals Dr. Evangelos Ouzounis Directorate C DG Information Society European Commission.
Work Package 1: Progress and Focus on specific issues 5th Steering Committee Meeting Rijeka, 26/2/2015 Presented by: Mrs Maria Poulou.
Centre for Genetic Resources, the Netherlands Chris Kik, CGN, Wageningen, the Netherlands LEAFY VEGETABLES WP5 Coordination.
1 WP7 Presentation WP7 -- Project Evaluation Computer Engineering and Networks Laboratory, ETH Zurich Lukas Ruf.
Fabrizio Gagliardi EGEE project director All activity workshop 17 th March 2004 EGEE is proposed as a project funded by the European Union under contract.
AIDA Governing Board meeting 30 March 2012, DESY Use of resources in Y1 and distribution of EC pre-financing (2nd installment) S. Stavrev, CERN Administrative.
StratusLab is co-funded by the European Community’s Seventh Framework Programme (Capacities) Grant Agreement INFSO-RI Management Overview StratusLab.
TECHNICAL QUALITY MANAGEMENT Technical Quality Management Co-funded by the Prevention, Preparedness and Consequence Management of Terrorism and other Security-related.
Review Preparation Meeting of the FP7 Project J-AGE Vienna 25th March 2015.
12 th General Assembly Meeting Joint Programming Initiative „More Years, Better Lives ” Rome 18 th November 2014.
WP6 – Monitoring and Evaluation 17th November 2014 Rome.
ICT Smartcities 2013 FP7-SMARTCITIES-2013 WP6 – Project Management OPTIMising the energy USe in cities with smart decision support system (OPTIMUS) Objective.
Brussels, January 16th, Overview and status of the project.
UNISEC Universal Influenza Vaccines Secured
Dr Sally Priest, Flood Hazard Research Centre
Review preparation.
StratusLab Project Status
Exit Capacity User Commitment – Transmission Workstream update
Istituto Nazionale di Statistica – Istat
WP1 INERTIA Framework Requirements, Specifications and Architecture
Summary of WP1 TF2 Bucharest, June 15, 2012.
SKADS Controller’s Meeting Timeline Annual Financial Report
Kick-off meeting of the project UMBRELLA
CEOS Work planning Steven Hosford, ESA/CNES, CEO
Reporting 25 April 2018.
Project proposal for ISO 9001:2008 implementation
CEOS Workplan Steven Hosford LSI-VC-5 Agenda Item #1.3 February 2018
WP 6 Combining big data: early estimates
Presentation transcript:

Agenda

WP1 – Project Management Start M0, finish M36 CIP lead Progress to date & plans for next 6 months: –Deliverables –Financials –Annual review –Audits

Progress To Date: Deliverables Deliverable No Deliverable titleDelivery date NatureDissemination level D7.1Project presentationM03PPU D1.1Mid-year technical progress reportM06RCO D2.1Optical firewall architecture with target specifications for the optical sub-systems M06RRE D2.2Outline proposals for algorithm designM06RCO D7.2Web site developmentM06PPU D4.1Optical sub-system boundary conditionsM09RCO D1.2First year technical, administrative and future plan reportM12RCO D3.1Security Applications PartitioningM12PCO D4.2Hybrid optical circuit layoutsM12RPU

Sums Distributed

Financials Planned & Actual for 1 st year Currently underspending. Need to have plan in place before review to be able to get back on track Planned spend is based on calendarised figure – not completely accurate, but used for indication purposes

External Spend

Annual Review Date not finalised, but proposal is for a day during week beginning 16 th July All deliverables need to be up to date –D1.2 First year technical, administrative and future plan report –D3.1 Security Applications Partitioning –D4.2 Hybrid optical circuit layouts Financial forms (form C and summary financial report) as well as audit certificates will be needed (timescale to be confirmed) Representation by and presentations from all partners –Pre-meeting the afternoon before in Brussels Need a view of final demonstrator for review

Provisional Second Year Distribution Total possible distribution from EU is 408,400€ which represents 35.82% of total Not known at the moment if underspending current on the project effects this

Workplanning WPMM

Manpower

Next Year WP3 & WP4 main focus Need to decide on final demonstrator(s) WP6 and WP7 will move up the agenda in terms of requiring dedicated effort

Deliverables For Year 2