Low Peak Frequency High Off-Peak Frequency Wide Frequency Fluctuation Damage to Generating Plants and Consumers’ Equipment Merit Order not followed - Optimizat.

Slides:



Advertisements
Similar presentations
1 FREQUENCY LINKED DISPATCH AND ELECTRICITY PRICING (An unconventional approach for tackling the peculiar problems existing in India) - Bhanu Bhushan -
Advertisements

NET2007 Conference Orlando, FL Feb 7, 2007 Reduce Peak Demand Now Reduce Peak Demand Now Let your equipment work as a team Copyright 2007 REGEN Energy.
1 FREQUENCY CONTROL -- Bhanu Bhushan -- (April, 2011)
OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
Challenge of Large Scale Wind Power Integration - Introduction to the Workshop Pradeep Perera Principal Energy Specialist Asian Development Bank.
1 ABT Based Boundary Metering. 2 ABTBoundary Metering+
Congestion When transmission demand >capability When Voltage levels in a corridor beyond operable limits When Real time line flow exceeds the TTC Most.
Integrating Multiple Microgrids into an Active Network Management System Presented By:Colin Gault, Smarter Grid Solutions Co-Authors:Joe Schatz, Southern.
Aidan Tuohy Technical Leader/Project Manager, EPRI ERCOT Emerging Technology Working Group (ETWG) 09/24/2014 Transmission System Considerations for Integrating.
ANCILLARY SERVICES THE NEXT STEP IN MARKET GRANULARISATION.
INTRA STATE ABT Necessity Issues Implementation. Some of the features of New National Electricity Policy – Feb.’05 Appropriate Commissions to undertake.
Power Factor and Power Factor Correction
Lesson 27 Power Factor Correction
Plant Utility System (TKK-2210)
Utility Analysis. Baseline Electricity Analysis  Understanding and documenting current energy use is called developing a baseline. Developing a baseline:
System Operator Conference Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS Facilitator Team.
ET2105 Electrical Power System Essentials
Copyright © 2013 Rockwell Automation, Inc. All Rights Reserved.Rev 5058-CO900E PUBLIC INFORMATION L19 - Combining the Latest Rockwell Automation® Hardware.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
1 THE INDIA ELECTRICITY MARKET TIME LINE REAL TIME 15 MT BLOCKS LONG TERM LOAD FORECAST FUND MOBILISATION 10-5 YEARS POWER PURCHASE AGREEMENTS CAPACITY.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 3rd SRPC MEETING 19 th February 2007 Bangalore GRID EVENTS AND ISSUES.
IEGC PROVOSIONS FOR RENEWABLE GENERATION SCHEDULING & UI SETTLEMENT 1.
1. 2 ENERGY MANAGEMENT SYSTEM AN OVERVIEW AN OVERVIEW.
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
INDIAN POWER SECTOR. Presentation Contents: Power Sector Structure in India Transmission Planning Criteria RLDC ’ s Management System Restoration Procedures.
Golden Valley Electric Assoc. Inc © 2012 GVEA. All rights reserved. GVEA BESS Expected and Actual Performance Dan Bishop Golden Valley Electric Assoc Fairbanks,
Black Sea Regional Transmission Planning Project By Predrag Mikša EKC - Electricity Coordinating Center Istanbul, March 2011.
Demand Response How to make money by not using electricity?
Effect of generation loss and Frequency Response Characteristics (FRC) on tie-line flow to Southern Region under various scenarios and Target setting for.
ERCOT Demand Side Working Group Mary Anne Brelinsky Eagle Energy Partners.
With amendments w.e.f  (1) In these regulations, unless the context otherwise requires,-  (a) ‘Act’ means the Electricity Act, 2003 (36.
The Secrets to Successful AMI Deployment – The Ontario Experience Paul Murphy, President & CEO Independent Electricity System Operator February 19, 2007.
Section 7.5 –4 – ii of Indian Electricity Grid code (IEGC): “The summation of station-wise ex-power plant drawal schedules for all ISGS after deducting.
1 Bilateral Interconnection Agreement Model Presented to HAPUA Working Group 5 (ESI Services), Project 6 By Power Purchase Agreement Division Electricity.
Ontario Electricity Supply Forum PEO Mississauga Chapter - September 6, 2007 Rhonda Wright-Hilbig, P.Eng Market Analysis - IESO.
CMD VISIT ON 16-JAN-03 DAILY FREQ COMPARISION JAN-02 & JAN DAYS FREQ COMPARISION JAN-02 & JAN DAYS FREQ JAN DAYS FREQ JAN-02 TYPICAL.
Presentation at DERC Public Hearing in the matter of ARR for F.Y filed by Distribution Companies in Delhi by N. Ponrathnam 6/2/20161.
Transmission Equivalence Richard V. Kowalski Manager, Transmission Planning ISO New England.
Daudi Mushamalirwa Luanda June, 2014 Technical issues of the stability of small size electric systems composed of wind generators and conventional generating.
PETITION BY TNEB TO INVESTIGATE ANY GAMING BY THE GENERATORS PETITION NO:- 90/2005 CERC HEARING ON 06-OCT-05.
Renewables and System Services Ann Scully.
SRLDC WELCOMES SHRI VISHNUVARDHAN REDDY DIRECTOR(F) KPC.
Indian Power System Peculiarities & Solutions S K Soonee Executive Director NRLDC.
SCHEDULING METHODOLOGY The station-wise (Ex-bus) capability would be submitted by the ISGSs in the specified format. ISGSs would declare the capability.
ABT / IEGC CLAUSES While making or revising their declaration of capability, the generator shall ensure that their declared capability during peak hours.
MERIT ORDER OPERATION AND GRID DISCIPLINE S.P.KUMAR MANAGER(IT), SRLDC,BANGALORE.
NLDC 1 Ancillary Services in Indian Context. NLDC 2 Outline Definition Drivers for Ancillary Services Ancillary Services in Indian Context.
IMPACT OF ABT, NETWORK STRENGTHENING ON GRID OPERATION IN KARNATAKA SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED ADVANTAGE.
Congestion regulations. Definitions and Interpretation “Available Transfer Capability (ATC)” means the transfer capability of the inter- control area.
1 INTRA – STATE AVAILABILITY BASED TARIFF (ABT) A Presentation on INTRA – STATE AVAILABILITY BASED TARIFF (ABT)
-- Bhanu Bhushan -- < > (August, 2011)
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
Optimizing Power Availability -- Action Plan for Next Decade Challenges of Distribution -- Investment and Reforms 1.
AN OVERVIEW IN RESPECT OF CPP’S IN SOUTHERN REGION STATES.
Availability Based Tariff (ABT) in Northern Region.
Planning for Texas’ Energy Future Select Committee on Electric Generation Capacity and Environmental Effects Bob Kahn President & CEO February 6, 2008.
SOUTHERN REGIONAL GRID ▀ Centre Generating Stations in the Region are Ramagundam Super Thermal Power Stn. : 2,600 MW (200x x4) Neyveli Lignite Corporation.
Recent TSO report on changes because of larger amounts of renewable enery IEA Task 25, January 14, 2016 Edf – Clamart – Paris – France Lennart Söder Professor.
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
AVAILABILITY BASED TARIFF. - Tariff structures - Two part tariff - Concept of ABT - ABT structure - Expectations from OEMs/Utilities Session outline.
1 8. OPERATING, REACTIVE AND BLACK START RESERVES Asko Vuorinen.
1 A Conversation about MISO Paul Spicer November 8, 2007.
Integration.
UNIFIED LOAD DESPATCH SCHEME IN THE SOUTHERN REGION
Economic Operation of Power Systems
Solar City: Effect of Solar Technologies on Network Performance
DEC System Voltage Planning - June 2018
GRID STATUS – PRE - ABT Very wide Frequency fluctuations
FREQUENCY CONTROL-THE UNEXPLOITED GOLD
Solar Energy Commercialization
Presentation transcript:

Low Peak Frequency High Off-Peak Frequency Wide Frequency Fluctuation Damage to Generating Plants and Consumers’ Equipment Merit Order not followed - Optimizat n. Oppo r. Lost Perpetual Operational and Commercial Disputes

UFR Load Shedding - Ineffective for Tackling Contingencies Over-drawal in Low Frequency Reluctance to Back-down Governor Action Supressed on Most Units  No Spinning Reserve  No Frequency Response Inadequacy/Low Availability of Generating Capacity : Widening Gap Reactive Power Drawals  Back-log in Capacitor Installation

Regional Energy Accounting In Daily/monthly MU, Disregarding TOD And/or System Situation (Freq) Unscientific Tariff Structre  No Disincentive for Hurting the Grid  Conflict With Merit Order Inappropriate Criteria for Judging Plants’ Performance Compounding effects of frequency fluctuations No formal Scheduling Process for Fixing Datums for Generation and Drawal Levels No Clear Demarcation of Scheduling and Despatch

 Incorporation Of Effective Automatic Load-shedding  Maximization Of Generation During Peak- load Hours And Load Curtailment Equal To The Remaining Generation Deficit  Backing Down Of Generation To Match The System Load Reduction During Off-peak Hours  Putting All Generating Units On Free- governor Mode Operation  Installation Of Capacitorss To The Required Extent  Absorbtion Of Vars During Off-peak Hours

Capacity Ch. + Energy Ch.  UI A + B  C

Total Special Energy Meter Installed – 226 No. of Locations - 70 Data received at ERLDC every week through , Modem, V-sat or floppy Special Energy Meters are 0.2s class, 3 Phase 4 wire microprocessor based and record energy transmittals in every 15 minutes along with frequency, voltage and MVAR flow.

INDIAN ELECTRICITY GRID CODE BRINGS TOGETHER A SINGLE SET OF TECHNICAL RULES, ENCOMPASSING ALL THE UTILITIES CONNECTED TO/OR USING THE INTER- STATE TRANSMISSION SYSTEM (ISTS)

INDIAN ELECTRICITY GRID CODE

INDIAN ELECTRICITY GRID CODE

INDIAN ELECTRICITY GRID CODE

INDIAN ELECTRICITY GRID CODE

INDIAN ELECTRICITY GRID CODE

INDIAN ELECTRICITY GRID CODE

INDIAN ELECTRICITY GRID CODE