PHOTOMULTIPLIER HIGH VOLTAGE POWER SUPPLY SYSTEM FOR THE CMS FORWARD HADRON CALORIMETER Lubomir Dimitrov, Ivan Vankov Nuclear Electronics Laboratory, Institute.

Slides:



Advertisements
Similar presentations
HIGH VOLTAGE POWER SUPPLY SYSTEM FOR CMS FORWARD SUBDETECTOR Lubomir Dimitrov, Ivan Vankov Nuclear Electronics Laboratory, Institute for Nuclear Research.
Advertisements

The group is developing readout electronics for initial use with the prototype test-stand at Fermilab. This work will contribute towards the design and.
HV-LV DCS Workshop – 16/03/2004 G. De Cataldo, A. Franco, A.Tauro - INFN Bari Progress report on the HMPID LV System Cabling and LV sectorsCabling and.
Large Area, High Speed Photo-detectors Readout Jean-Francois Genat + On behalf and with the help of Herve Grabas +, Samuel Meehan +, Eric Oberla +, Fukun.
E. Hazen, Boston University BU Meeting, Apr. 6, 2001 Front-end Readout of the CMS Hadronic Forward Calorimeter (HF) Conceptual Design (Summary) by Eric.
IFR/LST Meeting Feb 26, 2003K. Honscheid, Ohio State University High Voltage Requirements Commercial Solutions Custom Solutions.
LECC 2006 Ewald Effinger AB-BI-BL The LHC beam loss monitoring system’s data acquisition card Ewald Effinger AB-BI-BL.
Tullio Grassi ATLAS–CMS Power Working Group 31 March 2010 DC-DC converters and Power Supplies requirements for CMS HCAL Phase 1 Upgrade.
Group: CCM Project 1.2. EMERSON Emerson is a diversified global manufacturing company.  Provides innovative solutions to customers in the following areas:
1 Warsaw University of Technology Faculty of Electronics and Information Technology Institute of Electronic Systems HARDWARE SIMULATOR of the high-resolution.
The High Voltage, Monitoring and Control systems of the Hadronic and Electromagnetic calorimeters are essentially slow control based, and therefore are.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Laguna Beach, CA March 30-April 1, 2003 PMT HV Base Board Development Nobuyoshi Kitamura SSEC / UW-Madison.
HCAL1 Status 2003 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance 2003 General design High Voltage system LED monitoring 2. Tests in muon halo beam.
Development and Performance of the High Voltage Distribution System for the ALICE TRD A. Markouizos, P. Mantzaridis, P. Mitseas, A. Petridis, S. Potirakis,
LHCb F. Murtas Servizio elettronica G. Corradi D.Tagnani P.Ciambrone HV_GEM per LHCB M1R1 HV power supply Introduction Introduction HV_GEM Technical specification.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
LNA DC Bias Module Approach Block Diagram Schematic Program Plan
Data acquisition system for the Baikal-GVD neutrino telescope Denis Kuleshov Valday, February 3, 2015.
Figure 1: ICD Single Channel Block Diagram Schematic PMT High Voltage Supply (see Figure 4 & 4a) LED Pulser PMT Calibration (see Figure 6) ICD Scintillator.
HV-Splitter for RENO Project S. Stepanyan, 김우영 경북대학교 Y.Kim Sejong University May-2008.
Adapting Muon Endcap UF/PNPI HV system for GEM V. Barashko, A. Korytov, A. Madorsky, G. Mitselmakher University of Florida/Physics N. Bondar, V. Golovtsov,
UF –PNPI HV system status August 2008 Sergey Volkov Nikolai Bondar PNPI.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
PMT HV Base Prototypes Evaluation Instrumentation Workshop LBNL July 23-24, 2003 Nobuyoshi Kitamura University of Wisconsin-Madison SSEC.
I. Vankov, NEC’2003, September ‘03, Varna HV PS System NEC’2003, September 03, VARNA CMS HCAL High Voltage Power Supply System Dimitrov L.(*), Kunov B.(*),
1 LHCb CALO meeting Anatoli Konoplyannikov [ ITEP / LAPP ] Introduction Status bits of the LHCb readout supervisor ODIN HVSB board specification.
Colmar, 9-13 Sept. 2002LECC th Workshop on Electronics for LHC Experiments: Progress in Radiation and Magnetic Field tests of CAEN HV and LV boards.
Institute for Nuclear Research and Nuclear Energy Dimitrov L.P., Iaydjiev P.S., Mitev G.M., Vankov I.V.
ROBOX with Multi Anode PMT’s Status and plans A.Mestvirishvili, I. Schmidt, S. Sen, F. Ozok University of Iowa.
1 H C A L S.Sergueev, NEC2001, Varna, September 2001 CMS HCAL Slow Control System for the CMS Hadron calorimeter S.Sergueev, FNAL/JINR CMS HCAL.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
Control program for distributed high-voltage power supply system G. M. Mitev L. P. Dimitrov I. D. Vankov Nuclear Electronics Lab., Institute for Nuclear.
1 LHCb meeting Anatoli Konoplyannikov Introduction Which HV to be set before beam will come? Needed Constants PVSS data point type (DPT) format.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
Introduction Stacey Nordt Computer Science NC A&T State University Project Description: Converting a Visual C++ program into LabView for testing the 2280.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Assumptions: Cockcroft-Walton photomultiplier bases are the same for all ECAL sections Digital to analog converters are installed on the distribution boards.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
1 Overview of the HCAL LED monitoring PRR note CALO meeting Anatoli Konoplyannikov ABSTRACT In this note the design and integration of the LED.
CALO DCS upgrade A. Konoplyannikov, M. Soldatov, A. Ostankov, Yu. Guz (IHEP, Protvino) V. Kudryavtsev (BINP, Novosibirsk)
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
RPC R&D collaboration meeting, CERN, High Energy Laboratory at INRNE, Sofia and RPC R&D collaboration High energy Physics Laboratory Scientific.
A Silicon Photomultiplier (SiPM) Based Readout for the sPHENIX Upgrade S. Boose, J. Haggerty, E. Mannel, A. Sukhanov For the PHENIX Collaboration Introduction:
ATLAS DCS ELMB PRR, March 4th 2002, H.J.Burckhart1 Embedded Local Monitor Board ELMB  Context  Aim  Requirements  Add-ons  Our aims of PRR.
Current Status of RICH LVL-1 Trigger Module Takashi Matsumoto and Ken Oyama Presentation Outline Topics Geometry of Trigger Tile Required function of RICH.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
HCAL1 Status 2004 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance in 2004 General design High Voltage system LED monitoring 2. Stability in 2003 Led.
New digital readout of HFRAMDON neutron counters Proposal Version 2.
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
AGROFARM WEATHER MONITOR USING LabVIEW. INTRODUCTION Innovation in agriculture field Implementing instrumentation tech. in agricultural field The quantity.
Design summary Status of the development & production - test run with S3a and S3b prototype - performance tests To do list for production & development.
Outline Upgrade status of the ECAL/HCAL HV control mezzanine board;  Firmware design,  Setup for making functional tests and validation FPGA firmware.
New prototype modulator for the European XFEL Project (DESY) Pulse Step Modulator (PSM) Technology for long pulse applications.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
TRANSMISSION LINE MULTIPLE FAULT DETECTION AND INDICATION TO EB
Trigger system for setup 2016 V. Rogov, V. Yurevich,D.Bogoslovski, S.Sergeev, O.Batenkov* LHEP JINR *V. G. Khlopin Radium Institute, St. Petersburg.
Shashlyk DAQ and FEE Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA DAQ and FEE Workshop, Rauischholzhausen Castle.
High Voltage Power Supply for RPC Suvendu Nath Bose, Satyajit Saha, Sudeb Bhattacharya, Saha Institute of Nuclear Physics, Kolkata,, Description Presently.
HF ROBOX PRR3 Apr 2003E. Hazen HF Front-End Electronics ● System Description – Overview – PMT Board, ROBOX, Patch Panel – Signal Cable, Front-end boards.
CERN LHC RF Power Systems
The prototype string for the km3 scale Baikal neutrino telescope VLVnT April 2008 Vladimir Aynutdinov, INR RAS for the Baikal Collaboration for.
Stefano Levorato INFN Trieste
Calorimeter Mu2e Development electronics Front-end Review
BI-day 2014, The SEM-grid renovation project Michel Duraffourg
HCAL M&O-B Budget CMS Finance Board
Front-end electronic system for large area photomultipliers readout
Instrumentation for Colliding Beam Physics 2017
Combiner functionalities
Commodity Flash ADC-FPGA Based Electronics for an
Presentation transcript:

PHOTOMULTIPLIER HIGH VOLTAGE POWER SUPPLY SYSTEM FOR THE CMS FORWARD HADRON CALORIMETER Lubomir Dimitrov, Ivan Vankov Nuclear Electronics Laboratory, Institute for Nuclear Research and Nuclear Energy, BAS Serguei Sergeev Fermi National Laboratory, USA/Joint Institute for Nuclear Research, Dubna, Russia I. Vankov NEC’2005, Varna, Sept. 2005

PMT HV PSS for HF I. Vankov NEC’2005, Varna, Sept INTRODUCTION. 2.POWER SUPPLY SYSTEM 3.HV POWER SUPPLY MODULE 4.CRATE CONTROLLER MODULE AND MONITOR AND CONTROL UNIT 5.POWER SUPPLY SYSTEM SOFTWARE 6.BASIC TECHNICAL PARAMETERS 7.CONCLUSIONS

Compact Muon Solenoid (CMS) PMT HV PSS for HF - INTRODUCTION 1 HEHB HF2 HF1 I. Vankov NEC’2005, Varna, Sept. 2005

FORWARD HADRON CALORIMETER (HF) Copper Block Cerenkov Detectors – Embedded Quartz Fibers 1728 Photomultiplyers (PMTs) Type Hamamatsu R7525 (8 dynodes) I. Vankov NEC’2005, Varna, Sept PMT HV PSS for HF - INTRODUCTION 2

PROBLEMS CLASSIC SOLUTION: INDIVIDUAL RESISTOR DIVIDERS – GENERATE ALL PMT DYNODE VOLTAGES, BUT: 1. NEED 1728 HIGH VOLTAGE CHANNELS and m long HV CABLES - VERY EXPENSIVE 2. LARGE SPACE FOR THE 1728 DIVIDERS 3. GREAT POWER LOSSES IN THE DIVIDERS – PRODUCE MUCH HEAT PMT HV PSS for HF - INTRODUCTION 3 I. Vankov NEC’2005, Varna, Sept. 2005

PMT HV PSS for HF - INTRODUCTION 4 SPECIFIC SYSTEM STRUCTURE proposed by Dr. David Winn from Fairfield University 72 READ OUT BOXES (ROBOXES) – 36 for HF1 and 36 for HF2 36 roboxes – divided to 4 group of 9 corresponding to the four HF quadrants IN EACH ROBOX – 3 PRINTED CIRCUIT BOARDS (PCBs) WITH 8 PMTs HAVING VERY SIMILAR GAIN/VOLTAGE I. Vankov NEC’2005, Varna, Sept. 2005

PMT HV PSS for HF - INTRODUCTION 5 PRINTED CIRCUIT BOARD DIAGRAM I. Vankov NEC’2005, Varna, Sept. 2005

PMT HV PSS for HF - INTRODUCTION 6 I. Vankov NEC’2005, Varna, Sept PRINTED CIRCUIT BOARD WITH 8 PMTs ONE RESISTOR DIVIDER FOR THE FIRST 6 DYNODES WITH TOTAL RESISTANCE ABOUT 20 Mohms – MAX. CURRENT < 50 uA THREE SUPPLY VOLTAGES: U K = 2000 V; U D7 = 800 V; U D8 = 400 V RESULTS: STABLE VOLTAGE TO D7 AND D8 VERY LOW POWER LOSSES

PMT HV PSS for HF - INTRODUCTION 6 ONE QUADRANT HV SYSTEM STRUCTURE PS3 PS2 PS1 ROBOX No 1 3 PCs x 8 PMTs Cable No 1 Cable No 2 Cable No 9 9 HV cables L  15 m 1 HV cable L  150 m ROBOX No 2 ROBOX No 9 HV MODULE No 1 U U D7,1 LG U D8,1 U K,1 U U D7,2 LG U D8,2 U K,2 U D7,2 LG U D8,2 U K,2 U D7,1 LG U D8,1 U K,1 U D7,3 LG U D8,3 U K,3 U U D7,3 LG U D8,3 U K,3 9 HV CHANNELS = 1 MODULE 1 CLUSTER SUPPLIES 9 PCBs 3 GROUPS OF 72 PMTs WITH SIMILAR PARAMETERS 1x9 HV WIRES 165 m CABLE 9x9 HV WIRES 15 m CABLES I. Vankov NEC’2005, Varna, Sept. 2005

PMT HV PSS for HF – CRATE DIAGRAM 4 HV POWER SUPPLY MODULES 3 HV CLUSTERS A, B, C CRATE CONTROLLER MODULE RS 485 – CRATE LOCAL BUS MONITOR AND CONTROL UNIT 7 LEDs – SYSTEM STATUS 4 LIMITS – U klim, I lim1, I lim2, I lim3 CRATE POWER SUPPLY +5 V, +8 V, -8 V, +40 V I. Vankov NEC’2005, Varna, Sept. 2005

PMT HV PSS for HF – CRATE PHOTO I. Vankov NEC’2005, Varna, Sept. 2005

PMT HV PSS for HF – HV MODULE 1 A1, B1, C1 – 0 to 2000 V A2, B2, C2 – 0 to 800 V A3, B3, C3 – 0 to 400 V FLOATING OUTPUTS ONE CHANNEL: DAC – HV SET VALUE DC-DC CONVERTER 2 CMPs – U and I LOCAL CONTROL MUX+12 bits ADC INTERLOCK LED CONTROL I. Vankov NEC’2005, Varna, Sept. 2005

PMT HV PSS for HF – HV MODULE 2 I. Vankov NEC’2005, Varna, Sept. 2005

RS485 INTERFACE WITH HOST COMPUTER CRATE LOCAL BUS + CUSTOM PROTOCOL 7 LEDS – STATUS OF THE SYSTEM 4 POTENTIOMETERS – U and I LIMIT VALUES A NEW FIRMWARE HAS BEEN DEVELOPED WHICH IS NOW CAPABLE TO CONTROL BOTH HCAL AND HF PS SYSTEM RECOGNIZING THE DIFFERENT TYPE OF MODULES BY THEIR UNIQUE ID NUMBER. PMT HV PSS for HF – CONTROL & DISPLAY Fig. 8. Crate controller module with the monitor and control unit block diagram. CPU CONTROL LOGIC MONITOR AND CONTROL UNIT POWER ON CHANNEL ON VOLTAGE PROT CURRENT PROT OVER HEAT INTERLOCK POWER FAILURE A[13..15] A[8..12] D[0..7] RxD TxD A[13..15] A[0..7] D[0..7] CNTRL[0..3] KILL TxD RxD INTERFACE RS485 OUT RS485 IN ST MD[0..3] CLK D-WR D-RD RES U Klim I I I MEMORY CNTR[0..3] D[0..7] A[0..12] S[0] MD[0..3] CLK D-WR RES D-RD KILL lim1 lim2 lim3 I. Vankov NEC’2005, Varna, Sept. 2005

PMT HV PSS for HF – SOFTWARE VERY SIMILAR TO THE HPD POWER SUPPLY SYSTEM MAIN MONITOR WINDOW NINE CHANNELS STATUS LIMIT VALUES VOLTAGE UP/DOWN RATES CRATE PS VOLTAGES MODULE STATUS I. Vankov NEC’2005, Varna, Sept. 2005

HV PSS for HF - PARAMETERS I. Vankov NEC’2005, Varna, Sept PARAMETER CHANNELS A1,B1,C1 CHANNELS A2,B2,C2 CHANNELS A3,B3,C3 Max. operating voltage, V Voltage adjustment step, V Ramp rate, V/s Voltage ripple, mVp-p Voltage monitoring inaccuracy, % Long term instability, % Max. output current, mA Current monitoring inaccuracy, % Special – < 0,1 0,8 < 1 Floating output – < 0,1 0,8 < 1 Floating output – < 0,1 0,8 < 1 Floating Output

HV PSS for HF CONCLUSIONS HV SYSTEM FOR HF PHOTODETECTORS OF 2 CRATES WITH 4 HV MODULES DESIGNED AND PRODUCED LONG TERM TEST CONFIRMED THE BASIC SYSTEM PARAMETERS AND ITS RELIABILITY I. Vankov NEC’2005, Varna, Sept. 2005