LBT Q2 2008 Eng/SW Review SHTRShutters/Seals/Mechanisms.

Slides:



Advertisements
Similar presentations
PROGRAMMABLE PERIPHERAL INTERFACE -8255
Advertisements

LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
LBT Q Engineering Review ALPC – Primary Mirror Aluminum Shooting.
Tom’s Tips for Silencing Your Model “A” 2014 Missouri Valley Region Membership Meet.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
1 LBT Q Eng/SW Review SHTR: Shutters. 2 Highlights (Q1/2009) Shutters have been working well, generally Shutters have been working well, generally.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli, Chris Biddick.
Ocean Dunes Special Assessment 2013 o Problems with Roofs Building Envelope and Generators o Roofs – No Name Storm o Generators – Rust, mechanical problems.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Kern.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
LBT Q Eng/SW Review ROT - Rotators. 4-Apr-2008LBT Q Eng/SW Review Highlights First BG rotator installed First BG rotator installed BG cable.
LBT Q Engineering Review Primary Mirror Cells Biddick/Gusick/Kern.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
Telescope Integration and Tests Tuesday Afternoon.
1 LBT Q Eng/SW Review ECS: Enclosure Control System.
LBT Q Engineering Review Swing Arms (SWA) Apr-04LBT Q Engineering Review Highlights (Q4/2007) The PF SAs lost their cable trays The.
LBT Q Eng/SW Review TEL – TELEMETRY Tony Edgin.
LBT Q Engineering and Software Review ENGG Engineering General.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
Camera Body and Mechanisms 16 September 2008 Martin Nordby, Pierre Antilogus, Gordon Bowden.
1 LBT Q Engineering Review ICS – Instrument Cooling System.
1 LBT Q Eng/SW Review PVM: Preventive Maintenance.
LBT Q Eng/SW Review TERC Tertiary Mirror Units Commissioning.
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Howard.
1 LBT Q Eng/SW Review PLMG: Plumbing. 2 Highlights (Q2/2008) Have recently replaced worn contactors in the Primary Loop chillers Have recently replaced.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
LBT Q Eng/SW Review MCSC – Mount Control System.
LBT Q Engineering Review DYB. 21-Dec-2007LBT Q Engineering Review Highlights (Q4/2007) Currently in Commissioning Phase Currently in Commissioning.
LBT Q Engineering Review Instrument Cooling.
1 LBT Q Eng/SW Review ICS – Instrument Cooling System.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
LBT Q Engineering Review SAB Static Balancing.
Engineering 4862 Microprocessors Lecture 21
1 LBT Q Engineering Review PLMG: Plumbing, includes IC system, chiller systems, instrument lab cooling, and LUCIFER cryo-compressor cooling.
LBT Q Eng/SW Review MCSC – Mount Control System.
LBT Q Eng/SW Review CM – Configuration Management Stephen Hooper.
1 LBT Q Eng/SW Review PWR: Site electrical power.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
1 LBT Q Eng/SW Review ECS: Enclosure Control System.
21 July 2008 LBT Q Eng/SW Review 1 SIN – Software Infrastructure Titus Purdin.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Engineering Review ESW Engineering Software.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
1 LBT Q Engineering Review ECS: Enclosure Control System, includes the dewpoint sensor, CA system upgrades, grounding, enclosure track performance.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Engineering and Software Review ENGG Engineering General.
LBT Q Engineering/Software Review ROTRotators.
1 LBT Q Eng/SW Review PWR: Site electrical power.
Minutes Left:
LBT Q Eng/SW Review DIMM – Differential Image Motion Monitor.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
LBT Q Engineering Review PMCD. 21-DEC-2007LBT Q Engineering Review Highlights (Q4/2007) Draft of System Overview and O&M manual complete except.
LBT Q Engineering Review DAQ. 19-Apr-2007LBT Q Engineering Review Housekeeping System Requirements Interface directly to the Agilent 34970A.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
1 LBT Q Eng/SW Review PLMG: Plumbing, Chiller Systems.
LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
LBT Q Engineering Review Swing Arms (SWA). 10-Jul-2007LBT Q Engineering Review Highlights (Q2/2007) The right secondary arm is wired and the.
LBT Q Engineering Review Primary Mirror Cells.
LBT Q Engineering Review ENGG – Engineering General.
1 LBT Q Eng/SW Review PSPI: PEPSI installation preparation.
Area Covered. Work Done Quantity Financial Progress of work.
Adjusting Tilt and Turn Inswing Door or Window
HMI Reliability Dale Wolfe Reliability Engineer LMSSC*ATC*LMSAL
Presentation transcript:

LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms

2008-Jul-21LBT Q Engineering Review Highlights (Q2/2008) John Little reports pins are working well overall John Little reports pins are working well overall

2008-Jul-21LBT Q Engineering Review Progress (Q2/2008) Planning From Q1 Review: Planning From Q1 Review: Install rest of first batch of floating sockets (1 more installed, for 3 total) Install rest of first batch of floating sockets (1 more installed, for 3 total) Get 0704 back online √ Get 0704 back online √ Monitor shutter rails √ Monitor shutter rails √ Harass people about backup generator √ Harass people about backup generator √ Need to buy 480V 3ph genset Need to buy 480V 3ph genset

2008-Jul-21LBT Q Engineering Review Open Issues Technical Technical Failure Mode and Effects Analysis (FMEA) Failure Mode and Effects Analysis (FMEA) E-stop failure lead to inability to close shutter doors and vents (Issue 1419) E-stop failure lead to inability to close shutter doors and vents (Issue 1419) Power Failure Power Failure How to unlatch from the open position and close door How to unlatch from the open position and close door Failsafe latch pins? Failsafe latch pins? Drive failure Drive failure Motor/mechanical failure Motor/mechanical failure If we had a mirror cover, are the consequences of failure less severe? If we had a mirror cover, are the consequences of failure less severe? Shutter Rails Shutter Rails Upper left rail may have an alignment problem Upper left rail may have an alignment problem Lower left rail bogies misaligned Lower left rail bogies misaligned Leaky Seals (IssueTrak 944) Leaky Seals (IssueTrak 944) Is flexure of the enclosure causing problems? Is flexure of the enclosure causing problems? Snowmelt ducting doors need repair Snowmelt ducting doors need repair Schedule Schedule Time Time Financial Financial Unknown Unknown Resource Resource Mountain manpower availability Mountain manpower availability

2008-Jul-21LBT Q Engineering Review Planning (Q3/2008) Failure analysis Failure analysis E-stop bypass to enable door closure E-stop bypass to enable door closure Rebuild pin for 1007 Rebuild pin for 1007 Shim socket for 0716 (the socket is ~100 mm too far away) Shim socket for 0716 (the socket is ~100 mm too far away)