Tacis 2.02/95 on VVER 440 RPV Integrity TACIS Project: R8.01/98 – TRANSLATION, EDITING AND DIFFUSION OF DOCUMENTS (Result Dissemination) Tacis R2.02/95,

Slides:



Advertisements
Similar presentations
Hungarian Academy of Sciences KFKI Atomic Energy Research Institute Behaviour of irradiated RPV cladding F. Gillemot, M. Horváth, G. Úri, H-W. Viehrig,
Advertisements

Bay Zoltán Foundation for Applied Research Institute for Logistics and Production Systems BAY-LOGI Temperature dependence of Beremin-modell parameters.
Technology & Engineering Division 1 IDR-IVC-ELM/VS Coils – July, 2010 ITER_D_3LDJVJ v1.0 FATIGUE CONSIDERATIONS FOR ITER IVC COILS Jun Feng INTERIM.
NEEP 541 – Creep Fall 2002 Jake Blanchard.
Fracture Mechanics Overview & Basics
Chapter 9 Fracture Testing
Design of Machine Elements
A comparison of the surveillance test results for the South-Ukrainian NPP unit 2 standard and modernized surveillance assemblies V. Revka, E. Grynik, L.
1 CONSTRAINT CORRECTED FRACTURE MECHANICS IN STRUCTURAL INTEGRITY ASSESSMENT Application to a failure of a steel bridge Anssi Laukkanen, Kim Wallin Safir.
Background of PTS Assessments in Hungary Fekete Tamás - Tatár Levente MTA KFKI AEKI 1 st Hungarian-Ukrainian Joint Conference on Safety-Reliability and.
ME 388 – Applied Instrumentation Laboratory Fatigue Lab.
RUSSIAN RESEARCH CENTER KURCHATOV INSTITUTE Development of annealing for VVER-1000 reactor vessels Experimental assessment of possibility for performance.
DESIGNING AGAINST FATIGUE
TRAMPUS Consultancy Virtual Defense-in-Depth Concept in RPV Integrity Assessment P. Trampus 1st Hungarian-Ukrainian Joint.
Evaluation and Comparison of Fracture Behavior of Selected Nuclear Graphite by Small Size SENB Specimens Se-Hwan Chi. Ph. D. 15 th International Nuclear.
A.V. Kozlov, I.A. Portnykh, V.L. Panchenko FSUE «INM», , Box 29, Zarechny, Sverdlovsk region, Russia Corresponding author. fax: ;
FAST NEUTRON FLUX EFFECT ON VVER RPV’s LIFETIME ASSESSMENT
Engineering Doctorate – Nuclear Materials Development of Advanced Defect Assessment Methods Involving Weld Residual Stresses If using an image in the.
Miskolc, Hungary Miskolc, Hungary April2006 April 2006 Numerical Modelling of Deformation and Fracture Processes of NPP Equipment Elements Моделирование.
CRISM “Prometey”, Saint-Petersburg, Russia 1 ПОСТРОЕНИЕ РАСЧЕТНОЙ ТЕМПЕРАТУРНОЙ ЗАВИСИМОСТИ ВЯЗКОСТИ РАЗРУШЕНИЯ КОРПУСНЫХ РЕАКТОРНЫХ МАТЕРИАЛОВ: ОБЩИЕ.
Professor V.I. Makhnenko, scientist A.S. Milenin E.O. Paton Electric Welding Institute of National Academy of Sciences of Ukraine 1 Remaining Time Assessment.
“Influence of atomic displacement rate on radiation-induced ageing of power reactor components” Ulyanovsk, 3 -7 October 2005 Displacement rates and primary.
Orynyak I.V., Borodii M.V., Batura A.S. IPS NASU Pisarenko’ Institute for Problems of Strength, Kyiv, Ukraine National Academy of Sciences of Ukraine Pisarenko’
1 1) Japan Atomic Energy research Institute 2) Institute of Advanced Energy, Kyoto University 3) Japan Nuclear Cycle Development Institute Progress of.
1 Presentation L.Kupca Podolsk May 2007 AGEING MANAGEMENT OF SAFETY RELATED COMPONENTS OF WWER-440 UNITS OPERATED IN SLOVAK REPUBLIC The 5-th International.
High strength materials are being increasingly used in designing critical components to save weight or meet difficult service conditions. Unfortunately.
1st Ukrainian-Hungarian Seminar “Safety, Reliability and Risk of Engineering Plants and Components”, Miskolc April 2006 Intergranular stress corrosion.
Application of artificial neural network in materials research Wei SHA Professor of Materials Science
PPC-10 Smolenice Castle, Slovakia Sept , 2011
Bay Zoltán Foundation for Applied Reseach Institute for Logistics and Production Systems BAY-LOGI Integrity Assessment of Dissimilar Metal Welds BAY-LOGI.
Preparing for the Hydrogen Economy by Using the Existing Natural Gas System as a Catalyst // Project Contract No.: SES6/CT/2004/ NATURALHY is an.
TACIS Project: R8.01/98 – TRANSLATION, EDITING AND DIFFUSION OF DOCUMENTS (Result Dissemination) Probabilistic Safety Analysis Technology (PSA) TACIS R3.1/91.
Welding Design 1998/MJ1/MatJoin2/1 Design. Lesson Objectives When you finish this lesson you will understand: Mechanical and Physical Properties (structure.
2 nd Hungarian-Ukrainian Joint Conference on SAFETY-RELIABILITY AND RISK OF ENGINEERING PLANTS AND COMPONENTS ASSESSMENT OF SUB-CLAD FLAWS, J-INTEGRAL.
R 2.09/96, LBB of VVER-1000 NPP TACIS Project: R8.01/98 - DISSEMINATION OF RESULTS: "TRANSLATION, EDITING AND DIFFUSION OF DOCUMENTS" Tacis R2.09/96, “LBB.
1 Quantifying the hydrogen embrittlement of pipeline steels for safety considerations ( #186) L. Briottet, I. Moro, P. Lemoine CEA,LITEN, DTBH/LCTA, F
On the estimation of WWER-1000 RPV materials embrittlement by a standard surveillance program V. Vasilchenko, V. Kovyrshin State Scientific and Technical.
TACIS Project: R8.01/98 – TRANSLATION, EDITING AND DIFFUSION OF DOCUMENTS (Result Dissemination) TACIS R2.08/92 Stress Analysis in VVER-1000-Containment.
Welding Inspection and Metallurgy
TACIS Project: R8.01/98 – TRANSLATION, EDITING AND DIFFUSION OF DOCUMENTS (Result Dissemination) Improvement of the fission product retention system at.
Reactor pressure vessels of WWER (materials and technology) Janovec, J
Investigation of 15kh2NMFAA steel and weld after irradiation in the “Korpus” facility on the RBT-6 reactor D. Kozlov, V. Golovanov, V. Raetsky, G. Shevlyakov,
Bay Zoltán Foundation for Applied Reseach Institute for Logistics and Production Systems BAY-LOGI Assessment of crack like defect in dissimilar welded.
TACIS Project: R8.01/98 - DISSEMINATION OF RESULTS: "TRANSLATION, EDITING AND DIFFUSION OF DOCUMENTS" Licensing Related Assessments of Reactor Vessel Embrittlement.
Tacis 1.14/91 on life-time evaluation TACIS Project: R8.01/98 – TRANSLATION, EDITING AND DIFFUSION OF DOCUMENTS (Result Dissemination) Tacis R1.14/91,
William Prosser April 15, Introduction to Probability of Detection (POD) for Nondestructive Evaluation (NDE) This briefing is for status only and.
R 2.06/96, Surveillance of VVER-1000 RPV Beneficiary:Rosenergoatom, Moscow Consortium:Belgatom, Siemens AG, SCK-CEN Local Subcontractor:Atomstroyexport.
Quantification of the reliability of flaw detection (NDT) using probability of detection (POD) based on synthetic data - Validation of the ultrasonic.
Numerical simulation of dissimilar metal welding
Suction Roll Material Comparison
08/ Institute for Safety Research Hans-Werner Viehrig Member of the Leibniz Community Post Mortem Investigations of the NPP Greifswald WWER-440 Reactor.
19-1 Lesson 19: Reliability of Nondestructive Evaluation (NDE)
REACTOR PRESSURE VESSEL
Reactor Pressure Vessel Cladding
Turbo Power Life Prediction- Overview
Orynyak I.V., Borodii M.V., Batura A.S.
Ignacio Aviles Santillana
Project General Data Beneficiary: Rosenergoatom
EDF 3-loop RPV life management beyond 40 years of operation
VVER Reactor Pressure Vessel Start of life toughness
Milan Brumovsky, Milos Kytka, Milan Marek, Petr Novosad
Tutorial Irradiation Embrittlement and Life Management of RPVs
Irradiation Shift – Questions and Answers
INRAG Public Conference, April 13 – 14, Aachen, Germany
Determination of Fracture Toughness
VVER Reactor Pressure Vessel Start of life toughness
Mechanical Properties of Metals
INRAG Public Conference, April 13 – 14, Aachen, Germany
May 27-31, 2019, JSC “SSC RIAR”, Dimitrovgrad, Russia
ROLE of JSC OKB "GIDROPRESS", JCS “GNC NIIAR” and CNII KM "PROMETEY" in INTERNATIONAL PROJECT ТАСIS 2002 (R2/01.02) V.M. Komolov, V.V. Evdokimenko, V.A.Piminov,
Presentation transcript:

Tacis 2.02/95 on VVER 440 RPV Integrity TACIS Project: R8.01/98 – TRANSLATION, EDITING AND DIFFUSION OF DOCUMENTS (Result Dissemination) Tacis R2.02/95, “VVER , Reactor Pressure Vessel Integrity Assessment” Slide 1 Rev.: Beneficiary:Rosenergoatom, Moscow Contractor:EdF, VTT, Fortum Local Subcontractor:Moht & Atomenergoexport Budget: € Duration:24 months Contract expired:December 1999

Tacis 2.02/95 on VVER 440 RPV Integrity TACIS Project: R8.01/98 – TRANSLATION, EDITING AND DIFFUSION OF DOCUMENTS (Result Dissemination) Tacis R2.02/95, “VVER , Reactor Pressure Vessel Integrity Assessment” Slide 2 Rev.: Objectives of the project Carry out accelerated re-embrittlement experiments on spare templates from Novovoronezh 3 & 4 RPV for validation of re- embrittlement kinetics. The elaboration of data files (material properties and NDT) needed for the PTS assessment of WWER 440 /230 RPV. Elaboration of mechanical properties by direct measurements of kinetic hardness of the RPV core region material. Re-evaluation of the crack initiation toughness (K Ic) )/ temperature indexation curve by consideration of all typical (representative of WWER 440 / 230 weld materials) results, available in Russia. Presentation of the results to the local Safety Authorities.

Tacis 2.02/95 on VVER 440 RPV Integrity TACIS Project: R8.01/98 – TRANSLATION, EDITING AND DIFFUSION OF DOCUMENTS (Result Dissemination) Tacis R2.02/95, “VVER , Reactor Pressure Vessel Integrity Assessment” Slide 3 Rev.: Project implementation and results Task 1; Accelerated re-embrittlement experiments for Novovoronesh 3&4 RPV core weld –Templates form the RPV were used for the experimental part –Sub-size test specimens were irradiated in the Kola NPP, Unit 4 –Neutron dose was estimated on routine bases by measuring Mn-54 activity –Irradiation temperature was monitored with melting binary alloys –The test specimens were tested in RRCKI in Moscow after re-irradiation cycle –The increase in yield strength as expected –The shift in transition temperature in re-irradiation after annealing was much smaller than expected (Fig 1 and 2)

Tacis 2.02/95 on VVER 440 RPV Integrity TACIS Project: R8.01/98 – TRANSLATION, EDITING AND DIFFUSION OF DOCUMENTS (Result Dissemination) Tacis R2.02/95, “VVER , Reactor Pressure Vessel Integrity Assessment” Slide 4 Rev.: Fig. 1Comparison of experimental and calculated embrittlement rates after irradiation-annealing-re-irradiation (IAI) cycle of the RPV core weld of Novovoronesh NPP Unit 3

Tacis 2.02/95 on VVER 440 RPV Integrity TACIS Project: R8.01/98 – TRANSLATION, EDITING AND DIFFUSION OF DOCUMENTS (Result Dissemination) Tacis R2.02/95, “VVER , Reactor Pressure Vessel Integrity Assessment” Slide 5 Rev.: Fig. 2 Comparison of experimental and calculated embrittleemnt rates after irradiation-annealing-reirradiation cycle of RPV core weld of Novovoronesh NPP Unit 4.

Tacis 2.02/95 on VVER 440 RPV Integrity TACIS Project: R8.01/98 – TRANSLATION, EDITING AND DIFFUSION OF DOCUMENTS (Result Dissemination) Tacis R2.02/95, “VVER , Reactor Pressure Vessel Integrity Assessment” Slide 6 Rev.: Project implementation and results (cont.) Task 2; Data files for Pressurized Thermal Shock (PTS) assessment; “material properties” A comprehensive summary of material properties needed for PTS studies was elaborated The summary included data on mechanical and chemical properties as well as crack initiation and fatigue crack growth Plant specific material data from Russian VVER 440/230 units Data from open literature, previous projects and other available sources were collected RPV core weld embrittlement aspects were a most important issue (influence of neutron irradiation as a function of neutron fluence) Effect of annealing and post annealing embrittlement was included

Tacis 2.02/95 on VVER 440 RPV Integrity TACIS Project: R8.01/98 – TRANSLATION, EDITING AND DIFFUSION OF DOCUMENTS (Result Dissemination) Tacis R2.02/95, “VVER , Reactor Pressure Vessel Integrity Assessment” Slide 7 Rev.: Task 2; Data files for PTS analyses; Non-Destructive Testing (NDT) results Spectrum of expected remaining defects in the RPV was elaborated Data collected from NDT-results of manufacturing and acceptance control of VVER RPVs Statistics and experience from manufacturing induced defects was elaborated Detection probability based on the applied quality control and ISI was evaluated Influence of cladding was also considered Corresponding data from Skoda manufacturing procedures was also included The flaw distribution in Russian and Czeck RPVs was practically the same The Marshal distribution gives a higher probability of defects (Fig. 1) No remarkable defects found in any VVER RPVs in ISI Project implementation and results (cont.)

Tacis 2.02/95 on VVER 440 RPV Integrity TACIS Project: R8.01/98 – TRANSLATION, EDITING AND DIFFUSION OF DOCUMENTS (Result Dissemination) Tacis R2.02/95, “VVER , Reactor Pressure Vessel Integrity Assessment” Slide 8 Rev.: Fig 3. Probability of defect size larger than a

Tacis 2.02/95 on VVER 440 RPV Integrity TACIS Project: R8.01/98 – TRANSLATION, EDITING AND DIFFUSION OF DOCUMENTS (Result Dissemination) Tacis R2.02/95, “VVER , Reactor Pressure Vessel Integrity Assessment” Slide 9 Rev.: Project implementation and results (cont.) Task 3 Evaluation of the Kinetic Hardness Method (KHM) The objective to evaluate feasibility of determining mechanical properties by a non-destructive method: KHM A correlation has been found between the KHM and the tensile strain diagram According to VNIIAES a correlation has also been confirmed with toughness properties and embrittlement due to irradiation If so, the KHM method could be used for assessing irradiation embrittlement and toughness properties of the core region material of an operating RPV This method could accordingly be considered revolutionary Some controversial opinions do exist regarding the reliable applicability of the method on operating RPVs In Task 1 above, the correlation could not be confirmed (Fig 4)

Tacis 2.02/95 on VVER 440 RPV Integrity TACIS Project: R8.01/98 – TRANSLATION, EDITING AND DIFFUSION OF DOCUMENTS (Result Dissemination) Tacis R2.02/95, “VVER , Reactor Pressure Vessel Integrity Assessment” Slide 10 Rev.: Fig 4. Comparison of R p0,2 values from real tensile testing with the KHM method for NV 3 core weld

Tacis 2.02/95 on VVER 440 RPV Integrity TACIS Project: R8.01/98 – TRANSLATION, EDITING AND DIFFUSION OF DOCUMENTS (Result Dissemination) Tacis R2.02/95, “VVER , Reactor Pressure Vessel Integrity Assessment” Slide 11 Rev.: Fig 5. Comparison of R p0,2 values from real tensile testing with the KHM method for NV 4 core weld

Tacis 2.02/95 on VVER 440 RPV Integrity TACIS Project: R8.01/98 – TRANSLATION, EDITING AND DIFFUSION OF DOCUMENTS (Result Dissemination) Tacis R2.02/95, “VVER , Reactor Pressure Vessel Integrity Assessment” Slide 12 Rev.: Project implementation and results (cont.) Task 4 ; Re-evaluation of the Fracture Toughness curve K Ic –Re-evaluation of the Russian K Ic curve by considering all VVER 440/230 RPV results available in Russia –Comparison with similar results from Phare 2.01/95 –The quality of the available Russian fracture toughness data did not enable upgrading of the K Ic curve in a fully reliable way according to the Maters Curve method –The results confirmed that the Fracture Toughness dependence of Eastern and Western type of RPV steels have a similar temperature dependence

Tacis 2.02/95 on VVER 440 RPV Integrity TACIS Project: R8.01/98 – TRANSLATION, EDITING AND DIFFUSION OF DOCUMENTS (Result Dissemination) Tacis R2.02/95, “VVER , Reactor Pressure Vessel Integrity Assessment” Slide 13 Rev.: Project implementation and results (cont.) Global conclusions and recommendations –The embrittlement rate of the core weld at NV Units 3 & 4 was much smaller than expected based on sub-size specimen testing –Fracture toughness of template samples should be determined direct by static bend test of pre-cracked sub-size Charpy specimens –Russian acceptance standard for flaw evaluation and PTS analyses are well established –The correlation between mechanical tensile testing and KHM method was poor –Present Russian fracture toughness test data should be re-evaluated by analysing original load-displacement curves, if available –A more accurate statistical analysis using Master Curve approach should be performed