EN-GMS Group Meeting S. Prodon – 24.09.2015. CERN News (General) New structure 2016.

Slides:



Advertisements
Similar presentations
GridPP4 – Revised Plan Implementing the PPAN recommendations.
Advertisements

PH Dept News Fellows and associate committee Dec 2011: 12 fellow candidates for ISOLDE (on par with LHC experiments) 2 new fellows hired – Susanne Kreim.
Electronic Systems Support LV PS Procurement - Status February 28, 2005.
APT progress and resource discussion HS; 9 th March 2012.
Management’s preliminary comments to the ERC Report.
SCIENTIFIC ACTIVITIES AND BUDGET ESTIMATES FOR 2007 AND PROVISIONAL PROJECTIONS FOR THE YEARS AND LONG-TERM PERSPECTIVES White Paper Robert Aymar.
L. Tavian, TE/CRG, Page 2 12 th September 2013 Accelerator Consolidation Workshop L. Tavian, TE-CRG.
Information about system status Piquet backup call Supervision of fire alarm systems Control room backup Computer support for HCI’s/terminals Confirmation.
Service Management Status 107 th ACCU Meeting 10 March 2015.
Time System What is this all about? The purpose of this project is to automate how Evergreen collects, records and manages employees’ dates and times worked.
1. Contents I. GS Action list following the 98th meeting held on 7 December 2012 II. CERN Hotel III. LS1 i. Increased car fleet IV. Restaurant & Snack.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
LHC’s Second Run Hyunseok Lee 1. 2 ■ Discovery of the Higgs particle.
Overview of the participation of the CIS and SEE countries in the LHC Experiments NEC, VARNA 12 – 16 September 2005 Nicolas Koulberg, CERN.
Impact on Project Planning and Cost. Agenda CERN Project Budget Planning Summary E. Gschwendtner, 9 April
Bidders’ conference IT-4123 Supply, Replacement and Repair of Crane Rails Introduction to CERN and rails consolidation program Handling Engineering Group.
EN-GMS Group Meeting S. Prodon – CERN News (scientific matters) 1 st collisions at 13 TeV on 20 May Stable beam as from 3 June = start of.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
8 October 2013 The Royal Swedish Academy of Sciences has decided to award the Nobel Prize in Physics for 2013 to François Englert and Peter Higgs “for.
Large Hadron Collider Big Science for the 21 st Century David Lantz.
15/2/2006 LHCC Status Report J. Schukraft General News LHC progress & Schedule  now recent news on schedule  ‘closure of beam on 31 August’, first injected.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
… where the Web was born 11 November 2003 Wolfgang von Rüden, IT Division Leader CERN openlab Workshop on TCO Introduction.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
1 EARLY SAFETY MANAGEMENT OF PROJECTS AND EXPERIMENTS HSE UNIT PH DSO EDMS No
DriveCam ® Program March 15, Outline Overview of DriveCam Fleet Overview Chronology of Program Coaching Outcomes Financial Outcomes Case Studies.
PS Days, January 2001 The “Plan” B.W.Allardyce The Medium Term Plan is presented at the June FC meeting by the Management and covers 4 years (I.e. in June.
1 1. Some recent views ( ) 2 Linac tunnel
ECRs and ES for the LHC Last presentation on the 26 th of August 2015 (LMC 232) S. Chemli for EN-MEF-DC LMC xxx.
CATHI Project Administration Seamus Hegarty Human Resources Department Marie Curie Actions administrator CATHI General Meeting CERN 14 November 2011.
Plan. 12/05/ Who are we? PM (Project Management and Resource Planning) – APT – IMPACT – PPTEU2 – Plan LS1 – 2012 –…–… Plan V2 – From LS1 to LS2.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
Medium Term Plan, with a Long Term Projection to 2010 L. Maiani. CERN Finance Committee June 19, 2002.
Training Procedures in EN Department Elvina Perrin EN-GMS.
Handling Financial Matters Chapter 5 ©2013 Cengage Learning. All Rights Reserved.
Management’s preliminary comments to the ERC Report FINANCE COMMITTEE June 19, 2002.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Lucie Linssen, CLICdp, bi-monthly meeting, 3 Aug General news CLICdp monthly meeting August 3 rd 2015.
Users’ Office. 8.December 2015 ACCU meeting - D.Chromek-Burckhart – Users’ Office 2 Users’ Office news Web Site Recognition of Partnership Team Leader.
10 December 2015 – Plenary Session COFUND & CERN: furthering career development opportunities in Big Science Seamus Hegarty, CERN Synergies to fuel Researchers’
T. KurtykaLinac4 meeting 12 March 2009 Guidelines from the sLHC Specification Committee 1). sLHC Specification Committee 2). Schedule of tenders for Linac4.
James Gillies, InterActions, November 2012 News from CERN.
Lau Gatignon. The open session of this meeting was fully dedicated to the AD program with 6 presentations by AEGIS, ACE, GBAR, ASACUSA, ATRAP and ALPHA.
CERN Education and Communication (ETT/EC) James Gillies 4 April 2003.
BIDDERS’ CONFERENCE IT-3981 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Over 10 Tons Capacity January.
CERN openlab Overview CERN openlab Summer Students 2015 Fons Rademakers.
Agenda 1 BOSS Meeting - 27/5/ : :10 Introduction and aims of the workshop 10‘ 09: :25 Priorities from OP for PSB and transfer lines 15'
Germany and CERN / June 2009Germany and CERN | May Welcome - Willkommen CERN: to CERN: Accelerating Science and Innovation Professor Wolfgang A.
FY PROPOSED BUDGET  A "Target Level" expenditure base was established for all departments six- months’ worth of operations (July 1, 2016 – December.
Transport and Handling Manpower Planning S. Prodon – LEAF
PROCUREMENT RULES FOR EXPERIMENTS AT CERN Dante Gregorio CERN Procurement Service.
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
Lucio Rossi The High Luminosity LHC Project Distinguished Lecturer 2013.
Handling Financial Matters Chapter 5 ©2013 Cengage Learning. All Rights Reserved.
Lucio Rossi for the LARP Internal Project Review Via videlink, June 10, 2013.
General Information & Templates S. Prodon. Medium Term Plan MTP approved by the Finance Committee in June Peaks at a cumulative deficit of 540.
European Organization for Nuclear Research
EN-GMS Group Meeting S. Prodon –
LIU – EVM status and next steps
Looking back on 2014 and Perspectives for the MPE Group in 2015
SPSC123 Summary Lau Gatignon/EN-EA IEFC, 4 November 2016.
HL Consolidation Day Analysis of needs from BE-ICS
Overview & baseline of LS2 and roadmap for CRG
IT-4328/EN Bidders conference
Magdalena Kowalska, CERN PH-SME-IS
Beam Transfer Line Stage 1:
Presentation transcript:

EN-GMS Group Meeting S. Prodon –

CERN News (General) New structure 2016

CERN News (General) MTP approved Reduction of contributions by 60 MCHF in 2015 to compensate for the impact of the CHF SHIP, TSR and HIE Isolde Phase 3 not included Cut 10% in fellows budget Brochure & video «Doing business with CERN» New Grey Book (approved experiments & projects) : Pakistan as associated member state Applications from India & Azerbaijan

CERN News (General) New policy for posters (approval process, time limits, defined places) Recall campaign for gas bottles (up to 30-sep-15) Lync is becoming “Skype for Business” (upgrade mid-October) Financial and reputational risks for illegal use of software T. Cass is replacing Ph. Lebrun as chairman of SAPOCO LS2 Days on Sep 15

CERN News (scientific matters) AD : In a recent Nature article, the BASE collaboration reported the most precise comparison of the charge-to-mass ratio of the proton to its antimatter equivalent, the antiproton The LHCb experiment at CERN has made the first measurement at a hadron collider of decays of B mesons that have already shown possible deviations from the predictions of the Standard Model in earlier studies at an electron-positron collider. LHCbStandard Model Start-up of the AWAKE equipment installation phase

CERN News (scientific matters) Additional event recorded in OPERA (5 in total vs 10 expected) LHC machine : 3 to 4 fb -1 delivered to experiments in 2015 instead of 10 fb -1 CMS magnet cryo-system problem fixed for the moment. Major intervention in the end-of-the- year technical stop

CERN News (HR Matters) Indefinite Contract Review exercise in progress VIA selection will start this week 5YR: proposals from the Management to be presented at the TREF on 30-oct-15 HR meeting on 1-oct-15

EN-GMS News Evacuation Pavillon 112: new roof to be installed for January Car fleet : new GPS tracking system Smartphones < 200 CHF under Group responsibility but order through EN Desktop Support GS consolidation plan : Group feed-back before end September Procedure for small purchases (agreement procurement service beforehand) except for entertainment expenses (see rules in e-guide)

EN-GMS News Next visits: MEDICIS with operational robots (November) Microcosm new exhibition (December)