SRLDC 1 POWER SYSTEM OPERATION A FRESH PERSPECTIVE Power Grid Corporation of India Limited New Delhi, India.

Slides:



Advertisements
Similar presentations
1 FREQUENCY LINKED DISPATCH AND ELECTRICITY PRICING (An unconventional approach for tackling the peculiar problems existing in India) - Bhanu Bhushan -
Advertisements

The Single Electricity Market in Ireland
UCL ESPO/IAG/POMS Perspectives on Benchmarking Central Grids Prof. Per AGRELL CORE/IAG School of Management Université Catholique de Louvain BELGIUM.
Intertie Restoration Update September 15, Intertie Restoration Recommendation Paper Expected to be released by the end of September Will be released.
IWRM ToolBox: Knowledge Sharing Tool D. Thalmeinerova, GWP.
Reliable Power Reliable Markets Reliable People Challenges and Opportunities in the Power Industry in Alberta CERI Conference October 22 & 23, 2007 Warren.
GridWise ® Architecture Council Becky Harrison GridWise Alliance Future of the Grid Evolving to Meet America’s Needs.
Personnel and Transfer Management (PTM). FOR PERSONNEL BEING TRANSFERRED Lack of automation in the transfer process leads to inefficiency Stress on the.
Development Of A Common Platform For Electricity Trading CERC Public Hearing Presentation By POWERGRID 19-December-2006.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
Transmission; Foundation of a Power Market 12 May 2006.
Luis A. Camargo S. Wholesale Electricity Market Manager Colombia The Andean Electricity Market -TIE- Cartagena de Indias, October 14&15th
Mexico, april 2006 Modernization of Public Employment Services (PES) to Position Them as a Basic Instrument in the Design and Start Up of National Employment.
Asia-Pacific Finance and Development Centre 2006 Biennial Forum Shanghai, September 2006 Session V: Regional Cooperation and Innovation Development Presented.
INDUSTRIAL & SYSTEMS ENGINEERING
ANCILLARY SERVICES THE NEXT STEP IN MARKET GRANULARISATION.
INTRA STATE ABT Necessity Issues Implementation. Some of the features of New National Electricity Policy – Feb.’05 Appropriate Commissions to undertake.
1 Regulatory Challenges During and Following a Major Safety or Security Event Muhammad Iqbal Pakistan Nuclear Regulatory Authority Presentation at General.
Electric Power Infrastructure: Status and Challenges for the Future Mark Lauby Director, Reliability Assessments and Performance Analysis.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
1 Demand Response Update April, Strategic Perspective Demand Response  Aligns with PGE’s Strategic Direction; helping to provide exceptional.
Strategic Management the art and science of formulating, implementing and evaluating crossfunctional decisions that enable an organization to meet its.
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
-Nikhil Bhatia 28 th October What is RUP? Central Elements of RUP Project Lifecycle Phases Six Engineering Disciplines Three Supporting Disciplines.
“Status of Dispute Settlement Mechanism in the Telecom Sector in India” 24 th March, 2007 Ahmedabad Presentation by A.K. Sinha CMD BSNL.
Workshop on Trade Representation Trade Related Technical Assistance for SRE Peter Bennett Trade Development Consultant.
SARI/Energy Integration South Asia Regional Initiatives for Energy Integration (SARI/EI) Shanker Khagi USAID/Nepal March 7, 2013 Kathmandu, Nepal Supporting.
Challenges for the SEM.  Day-ahead price coupling is a key feature of the final draft Framework Guidelines on congestion management issued by ERGEG in.
Black Sea Regional Transmission Planning Project By Predrag Mikša EKC - Electricity Coordinating Center Istanbul, March 2011.
With amendments w.e.f  (1) In these regulations, unless the context otherwise requires,-  (a) ‘Act’ means the Electricity Act, 2003 (36.
Regulation and Sustainability A set of tasks and responses – varying by structure and stage Dennis Volk Programme Officer.
Section 7.5 –4 – ii of Indian Electricity Grid code (IEGC): “The summation of station-wise ex-power plant drawal schedules for all ISGS after deducting.
Sanjay Garg General Manager PGCIL/ Ministry of Power
MANAGEMENT OF LOAD DISPATCH CENTERS RLDC’s MANAGEMENT.
THE INDIAN POWER SYSTEM PECULIARITIES, PROBLEMS AND SOLUTIONS.
W E L C O M E Power Grid Corporation of India Limited.
Civil Societies Expectations on the Energy Union Providing Secure and Affordable Energy to EU Citizens EESC Hearing May S Nies Susanne Nies Corporate.
1 APPROPRIATE PRICING OF TRANSMISSION A PRESENTATION BY SRLDC, BANGALORE.
W E L C O M E Power Grid Corporation of India Limited.
SRLDC WELCOMES SHRI VISHNUVARDHAN REDDY DIRECTOR(F) KPC.
ABT / IEGC CLAUSES While making or revising their declaration of capability, the generator shall ensure that their declared capability during peak hours.
MERIT ORDER OPERATION AND GRID DISCIPLINE S.P.KUMAR MANAGER(IT), SRLDC,BANGALORE.
NLDC 1 Ancillary Services in Indian Context. NLDC 2 Outline Definition Drivers for Ancillary Services Ancillary Services in Indian Context.
Power Trading The Indian electricity sector has grown manifold since independence making India the third largest producer of electricity in Asia. The installed.
Workshop on State-Level Electricity Reforms: Firm Choices, Emerging Generation Markets and Externalities “Open Access: Experiences” ALOK ROY General Manager,
1 INTRA – STATE AVAILABILITY BASED TARIFF (ABT) A Presentation on INTRA – STATE AVAILABILITY BASED TARIFF (ABT)
Illinois Wholesale Market Update December 10, 2003.
Grid Reliability Metrics by Jim Dyer Electric Power Group, LLC January 29, 2004 Washington, DC Transmission Reliability Research Review.
POWER SECTOR REFORMS Grid Operation and Control in the changed Scenerio.
Power Trading Financial Markets Electricity. Triple Point Technology2 Current Situation… GenerationTransmissionDistributionConsumers.
SRLDC 1 COMPETITION IN GENERATION Power Grid Corporation of India Limited New Delhi, India.
Smart Grid Schneider Electric Javier Orellana
Wholesale Electricity Spot Market (WESM)
OECD Innovation Strategy Deliverables, policy implications and next steps Miriam Koreen OECD-France workshop 7 December 2009.
Transmission Tariff V.Balaji Chief Manager SRLDC.
Wednesday, March 31, 2004 MANAGEMENTOF LOAD DISPATCH CENTERS.
NORTHERN REGIONAL LOAD DISPATCH CENTER 1.Revision Of Ceiling Of UI Rates and slope. 2.Revision Of Schedule after a Transmission Constraint is over. 4.RLDC’s.
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
MERIT ORDER SCHEDULING AND DESPATCH V. K. AGRAWAL NRLDC.
UI – ITS MANY AVATARS!. UNSCHEDULE INTERCHANGE It's more than what meets the eye!!!!
Value 4 Golf is formed by a group of professionals who have been all their life linked to the world of golf, and actively participating.
W E L C O M E Power Grid Corporation of India Limited.
IN ADDITION OF UI RATE CORROSPONDING TO FREQUENCY OF 49
Electricity Wholesale Markets: Designs for a low-carbon future
ERERA AND ECOWAS ELECTRICITY MARKET DEVELOPMENT AND REGULATION
Strategies of Reliable Transmission of Energy In A Competitive Market
Impact of Wind Farms Aggregation on Large System Scheduling Cost Under Frequency Linked Deviation Settlement Mechanism Presented by Anoop Singh Authored.
TF 2 meeting in Milano (11-12 October)
Presentation transcript:

SRLDC 1 POWER SYSTEM OPERATION A FRESH PERSPECTIVE Power Grid Corporation of India Limited New Delhi, India

SRLDC 2 SYSTEM EVOLUTION LIKE ALL MAJOR POWER SYSTEMS, THE INDIAN POWER SYSTEM EVOLVED BY INTEGRATING SMALL ISOLATED SYSTEMS LIKE ALL MAJOR POWER SYSTEMS, THE INDIAN POWER SYSTEM EVOLVED BY INTEGRATING SMALL ISOLATED SYSTEMS PRESENTLY, THREE MAJOR GRIDS ARE IN OPERATION – CONNECTED ASYNCHRONOUSLY – MEETING A DEMAND OF OVER MW PRESENTLY, THREE MAJOR GRIDS ARE IN OPERATION – CONNECTED ASYNCHRONOUSLY – MEETING A DEMAND OF OVER MW OUR TARGET – A NATIONAL GRID BY 2010 OUR TARGET – A NATIONAL GRID BY 2010

SRLDC 3 LOOKING BACK WHAT WAS WRONG FREQUENT GRID DISTURBANCES / BLACKOUTS FREQUENT GRID DISTURBANCES / BLACKOUTS WIDE FREQUENCY/VOLTAGE EXCURSIONS WIDE FREQUENCY/VOLTAGE EXCURSIONS TRANSMISSION BOTTLENECKS TRANSMISSION BOTTLENECKS SUB-OPTIMAL OPERATION SUB-OPTIMAL OPERATION STRESSED EQUIPMENTS AND OPERATORS STRESSED EQUIPMENTS AND OPERATORS

SRLDC 4 LOOKING BACK WHAT WENT RIGHT POWERGRID DECLARED CTU (CENTRAL TRANSMISSION UTILITY). POWERGRID DECLARED CTU (CENTRAL TRANSMISSION UTILITY). VESTED WITH TASK OF SYSTEM OPERATION. VESTED WITH TASK OF SYSTEM OPERATION. LOAD DISPATCH CENTRES GIVEN ‘APEX’ STATUS. LOAD DISPATCH CENTRES GIVEN ‘APEX’ STATUS. SYSTEM AUGMENTATION WORKS STARTED WITH RIGHT EARNEST SYSTEM AUGMENTATION WORKS STARTED WITH RIGHT EARNEST A SCIENTIFIC BULK POWER TARIFF AND SETTLEMENT MECHANISM PUT IN PLACE A SCIENTIFIC BULK POWER TARIFF AND SETTLEMENT MECHANISM PUT IN PLACE A GRID CODE WAS ENFORCED A GRID CODE WAS ENFORCED

SRLDC 5 RELIABILITY FOCUS RELIABLE POWER SYSTEM IS THE BACKBONE OF A DEVELOPING ECONOMY RELIABLE POWER SYSTEM IS THE BACKBONE OF A DEVELOPING ECONOMY SYNERGISE POLICIES AND DECISIONS TO PROMOTE RELIABILITY SYNERGISE POLICIES AND DECISIONS TO PROMOTE RELIABILITY

SRLDC 6 STRATEGIES FOR RELIABILITY ROBUST TRANSMISSION PLANNING AND INVESTMENT FRAMEWORK ROBUST TRANSMISSION PLANNING AND INVESTMENT FRAMEWORK SYSTEM AUGMENTED EXCLUSIVELY FOR RELIABILITY AND STABILITY SYSTEM AUGMENTED EXCLUSIVELY FOR RELIABILITY AND STABILITY AGGRESSIVE CONSTRUCTION SCHEDULES AGGRESSIVE CONSTRUCTION SCHEDULES SCHEDULING AND SETTLEMENT MECHANISM COMPLEMENTS GRID SECURITY. SCHEDULING AND SETTLEMENT MECHANISM COMPLEMENTS GRID SECURITY.

SRLDC 7 STRATEGIES FOR RELIABILITY GRID CONTROL CENTERS MANNED BY SPECIALISED SENIOR PERSONNEL GRID CONTROL CENTERS MANNED BY SPECIALISED SENIOR PERSONNEL TRAINED IN ALL ASPECTS (TECHNICAL, MANAGEMENT AND COMMUNICATION SKILLS) TRAINED IN ALL ASPECTS (TECHNICAL, MANAGEMENT AND COMMUNICATION SKILLS) EMPOWERED FOR EXIGENCIES EMPOWERED FOR EXIGENCIES LOOSE POWER POOL PHILOSOPHY LOOSE POWER POOL PHILOSOPHY FLEXIBILITY IN OPERATION FLEXIBILITY IN OPERATION

SRLDC 8 OPERATING IN THE REAL TIME

SRLDC 9 REAL TIME OPERATION SIMPLE, BUT EFFECTIVE TOOLS SIMPLE, BUT EFFECTIVE TOOLS HOLISTIC APPROACH RATHER THAN RELYING ONLY ON ELABORATE CODIFIED PROCEDURES HOLISTIC APPROACH RATHER THAN RELYING ONLY ON ELABORATE CODIFIED PROCEDURES CO-OPERATIVE CULTURE CO-OPERATIVE CULTURE

SRLDC 10 REAL TIME OPERATION IEGCABT REAL TIME OPERATION REAL TIME OPERATION STANDS ON TWO FIRM FOOTINGS REAL TIME OPERATION STANDS ON TWO FIRM FOOTINGS IEGC – THE INDIAN ELECTRICITY GRID CODE IEGC – THE INDIAN ELECTRICITY GRID CODE ABT – AVAILABILITY BASED TARIFF ABT – AVAILABILITY BASED TARIFF

SRLDC 11 INDIAN ELECTRICITY GRID CODE (IEGC) SIMPLE, COMPREHENSIVE AND EFFECTIVE SIMPLE, COMPREHENSIVE AND EFFECTIVE JUST ABOUT 50 PAGES JUST ABOUT 50 PAGES DYNAMIC DOCUMENT DYNAMIC DOCUMENT ADAPTIVE TO GRID REQUIREMENTS ADAPTIVE TO GRID REQUIREMENTS CLARITY IN ROLES OF STAKE HOLDERS CLARITY IN ROLES OF STAKE HOLDERS

SRLDC 12 IEGC ENCOMPASSES….. Role of Stakeholders, statutory bodies and their Organisational linkages Role of Stakeholders, statutory bodies and their Organisational linkages Planning Code for Inter State Transmission Planning Code for Inter State Transmission Connection Conditions Connection Conditions Operating Code for Regional Grids Operating Code for Regional Grids Scheduling and Despatch Code Scheduling and Despatch Code Management of Indian Electricity Grid Code Management of Indian Electricity Grid Code

SRLDC 13 AVAILABILITY BASED TARIFF

SRLDC 14 AVAILABILITY BASED TARIFF A RATIONAL TARIFF STRUCTURE A RATIONAL TARIFF STRUCTURE SCIENTIFIC SETTLEMENT SYSTEM SCIENTIFIC SETTLEMENT SYSTEM COMPLEMENTS GRID RELIABILITY COMPLEMENTS GRID RELIABILITY ENCOURAGE THOSE WHO HELP THE GRID AND DISCOURAGE THOSE WHO UNDERMINE RELIABILITY ENCOURAGE THOSE WHO HELP THE GRID AND DISCOURAGE THOSE WHO UNDERMINE RELIABILITY SIMPLE AND EFFECTIVE SIMPLE AND EFFECTIVE IMPLEMENTED SUCCESSFULLY IN INDIA

SRLDC 15 WHAT IS AVAILABILITY TARIFF? FIXED COST α PLANT AVAILABILITY. FIXED COST α PLANT AVAILABILITY. VARIABLE COST α SCHEDULED GENERATION VARIABLE COST α SCHEDULED GENERATION DEVIATIONS :- UNSCHEDULED INTERCHANGE(UI), ATTRACT A FREQUENCY LINKED CHARGE. DEVIATIONS :- UNSCHEDULED INTERCHANGE(UI), ATTRACT A FREQUENCY LINKED CHARGE.

SRLDC HZ 50.5 HZ 49.5 HZ 50 HZ 49.5 HZ CORRESPONDS TO RS.2.80 UI PRICE AND FREQUENCY UI PRICE AND FREQUENCY

SRLDC 17 THE POWER OF UI LINKED TO FREQUENCY – LINKED TO FREQUENCY – COLLECTIVELY CONTROLLED, DEMOCRATICALLY STABILISED COLLECTIVELY CONTROLLED, DEMOCRATICALLY STABILISED KNOWN ONLINE TO ALL – TRANSPARENCY KNOWN ONLINE TO ALL – TRANSPARENCY A ‘WIN-WIN’ PLATFORM A ‘WIN-WIN’ PLATFORM SELF-HEALING PROPERTY SELF-HEALING PROPERTY SIMPLE – NO ELABORATE CALCULATION REQUIRED SIMPLE – NO ELABORATE CALCULATION REQUIRED NO FEAR OF PRICE RIGGING NO FEAR OF PRICE RIGGING NO NEED FOR NEGOTIATING NO NEED FOR NEGOTIATING PROMOTES DISCIPLINE PROMOTES DISCIPLINE STRONG NASH EQUILIBRIUM STRONG NASH EQUILIBRIUM DOVETAILS WITH THE LOOSE POWER POOL PHILOSOPHY DOVETAILS WITH THE LOOSE POWER POOL PHILOSOPHY PLATFORM FOR A POWER MARKET PLATFORM FOR A POWER MARKET

SRLDC 18 THE POWER OF UI UI VECTOR SENDS THE SIGNALS FOR UI VECTOR SENDS THE SIGNALS FOR OPTIMISATION IN THE CONTROL AREA OPTIMISATION IN THE CONTROL AREA REALISTIC LOAD-GENERATION PLANNING REALISTIC LOAD-GENERATION PLANNING TRADE, BILATERALS AND CONTRACTS TRADE, BILATERALS AND CONTRACTS INDIAN EQUIVALENT OF THE SPOT AND BALANCING MARKET INDIAN EQUIVALENT OF THE SPOT AND BALANCING MARKET

SRLDC 19 POWER SYSTEM RESTORATION PHILOSOPHYANDSTRATEGIES

SRLDC 20 …IF SOMETHING CAN GO WRONG, IT WILL! MEN EQUIPMENT PROCEDURE PREPAREDNESS OF THE THREE VITAL ELEMENTS ARE THE KEY FOR SUCCESSFUL RESTORATION

SRLDC 21 RESTORATION PHILOSOPHY EMPOWEREMENT OF SYSTEM OPERATORS EMPOWEREMENT OF SYSTEM OPERATORS SYNERGISTIC CONFLUENCE OF PROCEDURES AND OPERATOR JUDGEMENT SYNERGISTIC CONFLUENCE OF PROCEDURES AND OPERATOR JUDGEMENT PERIODIC REVIEW PERIODIC REVIEW MOCK DRILLS MOCK DRILLS ‘COMMANDO’ FORCE ‘COMMANDO’ FORCE RIGHT PERSON AT THE RIGHT PLACE RIGHT PERSON AT THE RIGHT PLACE HOLISTIC APPROACH HOLISTIC APPROACH

SRLDC 22 PITFALLS TO AVOID FOCUS ON PROCESS RATHER THAN THE GOAL FOCUS ON PROCESS RATHER THAN THE GOAL PERVASIVE AUTOMATION PERVASIVE AUTOMATION COMMERCIAL TRANSACTIONS OVER- RIDING RELIABILITY ISSUES COMMERCIAL TRANSACTIONS OVER- RIDING RELIABILITY ISSUES TIGHT CONTROL OF PARAMETERS TIGHT CONTROL OF PARAMETERS COMPLEX CONTROL HIERARCHY COMPLEX CONTROL HIERARCHY EVERYONE IS CONNECTED – …………………..NO ONE IS IN CONTROL EVERYONE IS CONNECTED – …………………..NO ONE IS IN CONTROL

SRLDC 23