NuMI/MINOS Status All Exp. Mtg. June 2, 2008 Jim Hylen/FNAL Page 1 FAR DETECTOR: 98.0% live time (wall clock) There was a power outage on the morning of.

Slides:



Advertisements
Similar presentations
ADX 150 – Engine Repair ADX 170 – Climate Controls
Advertisements

 NT-01: Developed internal water leak after a few weeks of operation (may have been related to a beam incident). Managed internal water leak using helium.
Special Report NuMI Target Updates Special Report NuMI Target Updates Ongoing Work - Four Parallel Activities, Now Three I.Target Hall NT-05 has been secured.
Neutrinos from Stored Muons STORM Target Station Conceptual Design 15-April-2013 Kris Anderson Fermilab/Accelerator Division/Mechanical Support Department.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
Andrew Moss Daresbury Laboratory August 2013 Latest results of MICE amplifier testing.
MOM Summary 11/01/10 Due to the Inclement Weather it has perhaps been quieter than usual Water - Tank has been holding water fine. Some ice has been forming.
Special Report NuMI Target Updates Special Report NuMI Target Updates Ongoing Work - Four Parallel Activities I.Target Hall We expect to move NT-05 to.
Beamline Takashi Kobayashi 1 Global Analysis Meeting Nov. 29, 2007.
NUMI NuMI Hot Handling Jim Hylen (FNAL) NBI02 March 13, 2002 Page 1 NuMI Target Hall Radioactive Component Handling NuMI Target Hall Utilizes Three Basic.
SpillServer and FD neutrino events As part of my CC analysis studies, I have been attempting to isolate beam neutrino candidates in the FD using both scanning.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 11 th May 2009.
MICE Target Status Chris Booth Sheffield 10 th May 2006.
MICO 8 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - Problems and Issues.
General improvements Upgrades Loose collection of items Changed – being changed – to be changed CTF3 working meeting10/02/121.
Pelletron Battle – Field Report All Experimenters’ Meeting August 15, 2011 L. Prost (for A. Shemyakin)
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
NuMI NBI2006 September 6, 2006 NuMI Horns Experience Jim Hylen / FNAL Page 1 NuMI Horns Experience Horns were put in target hall June st run with.
F All Experimenters' Mtg - 9 Jun 03 Week in Review: 06/02/03 –06/09/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
1 T2K Beam Operation Summary (earthquake recovery and beamline survey) NBI 2012 T. Ishii (KEK) for the T2K beam group.
NuMI NBI2006 September 9, 2006 NuMI Repairs for Hot Components Jim Hylen / FNAL Page 1 NuMI Repairs for Hot Components (1 sievert = 100 rem) Problem On.
Proton Source Vacuum Plan By David B. Augustine Ben Ogert Jr. August 30, 2011.
PHENIX Status, 2/22/11 VTX commissioning on beam Local polarimeter in service 9.6% in blue, -16.6% Residual transverse component for longitudinal beam.
All Exp Mtg April NuMI-MINOS Status Report – Bob Zwaska 78.7e17 protons for the week  Best week on record  Best day on Tuesday – 12.23e17 Decent.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 5, 2013.
NuMI NBI2006 September 6, 2006 NuMI Target Experience Jim Hylen / FNAL Page 1 Experience with the NuMI Target Max. Proton/spill Max. Beam Power Integrated.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 17, 2013.
All Experimenters’ Meeting November 03, 2014 Photo by Greg Vogel.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
NuMI NuMI Target Hall Air System Review Introduction July 30, 2003 Jim Hylen / FNAL Page 1 NuMI Target Hall Air System Review Introduction Air system for.
Accelerator and NuMI Upgrades Shutdown Update Cons Gattuso July 02, 2012 July 2, 2012 Cons Gattuso1.
Status of Moeller Polarimeter Peter Otte April 7, th Collaboration Meeting, Dubrovnik.
To do for the next K0 beam time Department of Physics, Tohoku University H. Kanda.
Current Status and Possible Items around ‘neutrino beam’ Horn Target Remote maintenance tools Decay volume window and collimator muon monitor Many items.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Mar
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
Overlap of Project X and Beamline to DUSEL June 2, 2008.
F NuMI Beamline Accelerator Advisory Committee Presentation May 10, 2006 Mike Martens Fermilab Beams Division.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
All Exp Mtg Apr 21, 2008 NuMI-MINOS Status Report – Alec Habig FAR DETECTOR: 99.7% live time (wall clock) 99.9% (pot weighted) Annual hoist inspection.
All Exp Mtg July 7, 2008 NuMI-MINOS Status Report – Laura Loiacono FAR DETECTOR: FD live time was 95.7% for cosmics last week (ROP7 problems reported at.
March 18, 2008 TJRMICE Beamline Status1 MICE Beamline Status (March 18, 2008) Tom Roberts Muons, Inc. Illinois Institute of Technology.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
N. Saoulidou, Fermilab, MINOS Collaboration Meeting N. Saoulidou, Fermilab, ND/CC Parallel Session, MINOS Collaboration Meeting R1.18.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
NuMI NBI2003 November 7-11, 2003 NuMI Target Jim Hylen / FNAL Page 1 NuMI Target Status, Testing, Support Module At NBI’02: Beam test results of Medium.
Medium baseline neutrino oscillation searches Andrew Bazarko, Princeton University Les Houches, 20 June 2001 LSND: MeVdecay at rest MeVdecay in flight.
T2K Status Report. The Accelerator Complex a Beamline Performance 3 First T2K run completed January to June x protons accumulated.
NUMI Flexible Joint/Floating Clamp WBS Power Supply System Level 3 Manager Nancy Grossman FNAL July 10, 2001.
08:30 Machines in stand-by 12:30 Access in LHC for QPS and PC:  QPS quench heater power supply RB.A12  EPC for RSF2.A67B2 and RQ9.R8B1.  RCBH27.L1B2.
All Experimenters’ Meeting September 23, Accelerator Operation Summary Calendar Week # 38 NuMI Weekly Integrated Intensity 4.57 E18 protons BNB.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICE Video Conference May 20, 2010.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
All Experimenters MeetingDmitri Denisov Week of July 22 to July 29 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.1pb -1 u Live:
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
All Exp Mtg May 5, 2008 NuMI-MINOS Status Report – Tingjun Yang FAR DETECTOR: 99.7% live time (wall clock) Everything was running pretty smooth NEAR DETECTOR:
Status Report Beam Working Group 31 January 2007 Presented by L.Gatignon  Revised beam design  Requests to AB department for 2007.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 24, 2014.
LBNE Remote Handling Layout Options Adam Carroll Van Graves Tom Burgess FNAL/ORNL Videoconference March 11, 2010.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 14, 2013.
Minerva Test Beam 2 Status Geoff Savage for the Test Beam 2 Team March 23, /23/2015AEM - Minerva Test Beam 2 Status1.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
Mike Andrews August 17, Week 16 NuMI Activities Leak testing of DI bottles & Casks Complete all bottles & casks RAW Impulse line upgrade Finished.
10/3/2014 Proton Source Update. RIL Update Source B is back in place and under vacuum It will be baked over the weekend It will be started early next.
Mike Andrews January 31, Weeks Activities Target Pile Fan Upgrades Install piping for new cooling coil units Install controls for new coil.
AD ops. - NUMI July 7, 2006 Jim Hylen/FNAL Page 1 Had been having problem with water collecting in tank under horn 1, instead of coming back to surge tank,
Raster Update Aug 9, 2016 R. Michaels
Presentation transcript:

NuMI/MINOS Status All Exp. Mtg. June 2, 2008 Jim Hylen/FNAL Page 1 FAR DETECTOR: 98.0% live time (wall clock) There was a power outage on the morning of May 22 at Soudan so the DNR can install a lightning arrestor on the headframe. The power outage coincided with a planned shutdown of the beam. Upon restarting the FD system, a timing system malfunction resulted in all FD time-stamps to be 1 second too early relative to the true GPS time. The problem was identified and fixed on the morning of May 29. During the period in question, neutrino events were still detected by the 4/5 and energy triggers. The software was updated to reclaim those events based on corrected timestamps. NEAR DETECTOR: Up 99.6% of the time (pot weighted) MINOS detector status

NuMI/MINOS Status All Exp. Mtg. June 2, 2008 Jim Hylen/FNAL Page 2 Protons / day for last two weeks Investigation of Horn 1 water system

NuMI/MINOS Status All Exp. Mtg. June 2, 2008 Jim Hylen/FNAL Page 3 Integrated POT

NuMI/MINOS Status All Exp. Mtg. June 2, 2008 Jim Hylen/FNAL Page 4 Protons per pulse, beam power

NuMI/MINOS Status All Exp. Mtg. June 2, 2008 Jim Hylen/FNAL Page 5 Ejection pump Check valve Remote swage-lock fitting Ceramic electrical insulation hole here in suction line drawing in air reducing water suction Flex-hose section of suction line Water collection tank Horn 1 suction line failing - similar to previous Horn 2 problem

NuMI/MINOS Status All Exp. Mtg. June 2, 2008 Jim Hylen/FNAL Page 6 Horn 1 suction line failing This is the 5 th ceramic failure. All 4 of the water line ceramics on Horn 2 have been changed to a new style that is not expected to fail. Horn 1 still has the old style. Horn 1 spare is being outfitted with all-new style; estimated completion June 6, then ready for installation.

NuMI/MINOS Status All Exp. Mtg. June 2, 2008 Jim Hylen/FNAL Page 7 Replace horn rather than repair – but save for offline repair in 2009/2010 Horn 1 residual radiation map as of Aug, 2006 – should be higher (x2 ?) now Previously replaced a ceramic on Horn 1, but that was a smaller supply line with compression fittings, -- this suction line requires cutting, installation of compression fittings

NuMI/MINOS Status All Exp. Mtg. June 2, 2008 Jim Hylen/FNAL Page 8 Repair estimate Have turned down spray rate somewhat keep horn running – but problem continues to get worse, expect to stop for repair tomorrow Time estimate for replacing horn with spare: two to five weeks Horn 1 removal requires retraction of target. Last time target was retracted, drive stuck and target had to be replaced. (couple weeks work) Want to use this opportunity to remove 1 st target from Morgue - autopsy to check for radiation damage – are in unexplored territory! - make room in Morgue for next dead component (extra day or two) Want to do low-power beam scan of horn with target removed, to confirm beam alignment (extra couple days) Probably will replace stripline-block/remote clamp as well

NuMI/MINOS Status All Exp. Mtg. June 2, 2008 Jim Hylen/FNAL Page 9 Spares status