Intertie Transactions Failure Working Group Tuesday April 19, 2005.

Slides:



Advertisements
Similar presentations
2000, Independent Electricity Market Operator All Rights Reserved 1.
Advertisements

IJT Transaction Timelines and Scheduling – NISL and CMSC.
Welcome to MAT 142 Self-paced Hybrid. Basic Course Information Instructor Office Office Hours Beth Jones PSA 725 Tuesday and Thursday 8 am – 8:30 am Tuesday.
After-the-Fact Workgroup Update Sheryl Welch ISAS Meeting 01/28/2015 Salt Lake City, UT.
Utah Cost of Service and Rate Design Task Force Seasonality in Costs and Loads Maurice Brubaker June 15, 2005 Salt Lake City, Utah.
Discussion of Inter-RTO Seams Issues Presented by: Midwest ISO and NYISO Independent Market Monitor David B. Patton, Ph.D. Potomac Economics October 7,
Highlights of the 2004 State of the Market Report New York Electricity Markets David B. Patton, Ph.D. Potomac Economics Independent Market Advisor May.
Ramping and CMSC (Congestion Management Settlement Credit) payments.
Sheryl Welch, ATFWG Chair August 20, 2014 Portland, OR.
Luis A. Camargo S. Wholesale Electricity Market Manager Colombia The Andean Electricity Market -TIE- Cartagena de Indias, October 14&15th
May 2014 PWG Meeting 2013 UFE Analysis Prepared by Data Aggregation.
©2012 | Commercial in Confidence | Proprietary to Ventyx, An ABB Company NYISO Real-time Market Presentation to ERCOT METF – April 26, 2012 Confidential.
NV Energy Energy Imbalance Market (EIM) Presentation to ISAS
Andy Meyers Interchange Scheduling and Accounting Subcommittee Chair
EAEI Department  Electricity Markets and Policy Group Congestion Measures for Organized Electricity Markets in the U.S. Emily Fisher Lawrence Berkeley.
Chapter 14 Prices and Exchange Rates: Purchasing Power Parity.
The Housing Industry Commercial real-estate fell 7.6% in May 2009 Both dollar volume and transaction count reached record lows The indexes are down 29%
Welcome New York Independent System Operator. (Pre-NYISO) Regulated Market Physical contracts Regulated industry Cost Based System Two Party Deals Bundled.
Seams Issues Raymond DePillo Vice-President – Power Operations and Asset Management PSEG Energy Resources & Trade LLC October 7, OPSI Annual.
1 Adjusting the “Dispatch Instructions” to the Defined Metering Point (DMP). “Functional Deferral 6 (FD-06)” Market Operations Standing Committee (MOSC)
Day Ahead Market Working Group March 31, Agenda Review minutes - March 24 Coral Proposal - Working Group Discussion Loads/LDCs and DAM.
CMSC Rules Changes under Consideration Market Operations Standing Committee December 3, 2003 PUBLIC.
1 CPUC Avoided Cost Workshop Introduction and Overview.
Insight Information Company ONTARIO POWER SUMMIT Policing the Market: Upholding Conduct & Performance Harry Chandler Director, Market Assessment & Compliance.
Proposed CMSC Amendments - Imports & Exports Intertie Trading Sub-committee November 24, 2003 PUBLIC.
EvergreenEcon.com ESA 2011 Impact Evaluation Draft Report Public Workshop #2 August 7, 2013 Presented By: Steve Grover, President.
 decimals/cc-7th-fracs-to-decimals/v/converting-fractions-to-decimals-example.
CRR Auction Scope John Moseley. To outline aspects of the CRR market process to assure that these proposed CRR market protocols (as interpreted by ERCOT.
Tuesday, April 22, 2014MAT 312. Tuesday, April 22, 2014MAT 312.
The Ontario Electricity Market 1 Year in Richard Penn Mgr - Market Assessment The IMO Richard Penn Mgr - Market Assessment The IMO.
Day Ahead Market Working Group April 14, Agenda Discussion of SMD-style DAM review questions posed by the DAM WG and Coral regarding the SMD-
SEM – One Year On Liam Ryan, Market Operations Manager.
Economic Performance. Tuesday 5.17, Economic Performance SWBAT describe how and why the GDP changes over time. Agenda 1.Announce new students of the month.
Treatment of Intertie Failures Intertie Trading Subcommittee November 24, 2003.
Reliable Power Reliable Markets Reliable People Losses and Ancillary Services: Volume Analysis 2007 Budget Review Process August 28, 2007 Operations Planning.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
Explanation of Latest Changes to Draft Reserves Schedule, Service Schedule D Contact: Arnie Podgorsky Mike Thompson Wright & Talisman PC
Agenda 1Introduction and Meeting Goals1:00 – 1:10 PM 2Updates: Meeting Logistics Proposed Data Fields 1:10 – 1:40 PM 3Presentation: File Field and Quality.
Enhanced Interregional Transaction Coordination: implementation update Billing and Accounting Working Group January 19, 2011 David Edelson Senior Project.
Explanation of Changes to Draft “Firming” Schedule, Service Schedule E Contact: Arnie Podgorsky Mike Thompson Wright & Talisman PC
© ABB Group August 23,2010 | Slide 1 MBPC Study – 1 st Load Pocket Preliminary Results for Discussion only Entergy Regional State Committee (ERSC) Southwest.
1 Bridge Inspection Program Department of Transportation Legislative Audit Bureau September 2007.
Outstanding Issues & Action Items 1.Obligations to Honor Ancillary Services Commitments 2.Variable ERCOT Bias 3.Sign reversals of the Regulation Signal.
MINNESOTA’S HIV TREATMENT CASCADE April, Introduction.
Global Manufactoring and Foreign Trade Statistics Why FTS cannot be the (only) source. Simon Lohner, Deutsche Bundesbank.
Market Operations Standing Committee of the IMO Market Operations Standing Committee October 22, 2003.
Transmission Rights. The Markets EnergyForwardTransmissionRightsAncillaryServices Must Run Contracts Energy OperatingReserveCapacityReserve Procurement.
Revisions to the Information Confidentiality Catalogue Presentation to the Market Operations Standing Committee April 23, 2003.
ROS December 2007 Carlos Gonzalez-Perez ERCOT Operations Support CFE-ERCOT DC-Ties Commercial Operations 1 10/30-31/2007 CFE/ERCOT/AEP Meeting – Mexico.
1 Tracking Electricity Imports David J. Lawrence Manager, Auxiliary Market Products Prepared for: RGGI I&L Workshop June 15, 2006.
Class 9, October 1, 2015 Lessons 2.1 & 2.2.  By the end of this lesson, you should understand that: ◦ Population density is a ratio of the number of.
October, 2011 MCWG/CWG Review of Abacus Loss Allocation ERCOT Mandy Bauld.
INJECTING UTILITYSTATEEXPORT (MU) TNEBTAMILNADU673 KPTCLKARNATAKA205 KSEBKERALA1792 APPCCANDHRA PRADESH426 JINDALKARNATAKA274 KPCLKARNATAKA593 JSWELKARNATAKA1058.
MOSC Meeting Operations Market Manual updates October 22, 2003 Presented by:Ron Falsetti Steve Cooper.
Recommendation on DACP SE-22 Presentation to the SAC Darren Finkbeiner, Manager – Market Entry and Analysis November 1, 2006.
TDTWG UPDATE TO RMS 1 Tuesday April 1, Reviewed ERCOT System Outages and failures ERCOT presented the monthly Incident Report Planned/Unplanned.
ICE Futures ERCOT North Hub Liquidity Analysis Suresh Pabbisetty, FRM, ERP, CQF, CSQA. Lead Technical Analyst, Credit April 20, 2016.
ICE Futures ERCOT North Hub Liquidity Analysis Suresh Pabbisetty, FRM, ERP, CQF, CSQA. Lead Technical Analyst, Credit April 11, 2016.
What county clerks should know about Idaho public defense reform
CEGH GAS EXCHANGE.
Consolidated EIM Initiatives from 2017 Roadmap Issue Paper
Status of the Planning Working Group’s (PWG) Efforts
INTERNATIONAL BUSINESS ENVIRONMENT
عمل الطالبة : هايدى محمد عبد المنعم حسين
Math EOC Collaborative
February 10, 2015 University Libraries
Market Pricing Initiatives Update September 9th, 2003
Further Considerations
Audit of Reward Points Florida Tourist Development Tax Association
Internet of Things (IoT) Work Group
Presentation transcript:

Intertie Transactions Failure Working Group Tuesday April 19, 2005

2 Agenda Introduction Summary of data Review of definitions Review of data Discussion and Next Steps

3 Summary of Data Total Monthly Scheduling Deviation on all Interchanges –By Import/Export –By reason for scheduling deviation –By total monthly MWhs –As a percentage of Monthly Trade –By transaction count

4 Summary of Data (Cont’d) Monthly Scheduling Deviation by Interchange: Michigan, Manitoba, Minnesota, TransEnergie (HQ), NYISO. –By Import/Export –By reason for scheduling deviation –By total monthly MWh –As a percentage of Monthly trade –By transaction count –By On-Peak Exports or Imports and Off-Peak Exports or Imports

5 Summary of Data (Cont’d) Anonymous Participant Failure Rate from August 2003 to February 2005 for all interfaces –Expressed as a percentage of all scheduling deviations –Expresses as a percentage of the Participants total trade (similar calculation as guideline failure ratio)

6 Definitions Pre-Dispatch Constrained Schedule (PDC). The final PDC schedules issued prior to the delivery hour. Dispatch Constrained Schedule (DC). DC schedules contain all transactions which began at the start of the delivery hour. Scheduling Deviation in MWhs = PDC schedules in MWhs – DC schedules in MWhs Percentage of Monthly Scheduling Deviation = Monthly Scheduling Deviation in MWhs / Monthly PDC schedules in MWhs

7 Definitions - continued Percentage of Export Monthly Scheduling Deviation = Monthly Export Scheduling Deviation in MWhs / Monthly Export PDC schedules in MWhs Percentage of Import Monthly Scheduling Deviation = Monthly Imports Scheduling Deviation in MWhs / Monthly Import PDC schedules in MWhs By Interchange: Percentage of Total Monthly Scheduling Deviation = Monthly Scheduling Deviation in MWhs for Intertie / All Monthly PDC schedules in MWhs for the Intertie

8 Definitions - continued By Interchange: Percentage of Monthly Export Scheduling Deviation = Monthly Export Scheduling Deviation in MWhs for Intertie / All Monthly Exports in MWhs for the Intertie Percentage of Monthly Import Scheduling Deviation = Monthly Import Scheduling Deviation in MWhs for Intertie / All Monthly Imports in MWhs for the Intertie Percentage of Monthly Export On-peak Scheduling Deviations = Monthly Scheduling Deviation for On-peak Exports in MWhs / Monthly PDC schedules for On-peak Exports in MWhs

9 Definitions - continued Percentage of Monthly Export Off-peak Scheduling Deviations = Monthly Scheduling Deviation for Off-peak Exports in MWhs / Monthly PDC schedules for Off-peak Exports in MWhs Percentage of Monthly Import On-peak Scheduling Deviations = Monthly Scheduling Deviation for On-peak Imports in MWhs / Monthly PDC schedules for On-peak Imports in MWhs Percentage of Monthly Import Off-peak Scheduling Deviations = Monthly Scheduling Deviation for Off-peak Imports in MWhs / Monthly PDC schedules for Off-peak Imports in MWhs

10 Definitions - continued Ratio 1 = MP(A) failures due to Tag or Economics in MWhs/ All MP(A) Scheduling deviations in MWhs Ratio 2 = MP(A) failures due to Tag or Economics/ All MP(A) Trade in MWhs –similar to guideline failure ratio