SCHEDULING METHODOLOGY The station-wise (Ex-bus) capability would be submitted by the ISGSs in the specified format. ISGSs would declare the capability.

Slides:



Advertisements
Similar presentations
Definition of Firm Energy and Interruptible Transmission Two Issues Causing Problems for Business in the Western Interconnection.
Advertisements

ISTISNA’.
ENQUIRY BY SRLDC TO VERIFY THE DETAILS OF DC & AG BY NTPC AND NLC STATIONS PETITION NO:- 67/2003 (suo motto) & PETITION NO:- 90/2005 (TNEB) CERC HEARING.
OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
4/28/20151 PRESENTED BY NAKABAGO JOHN CONTRACT MANAGEMENT AND ADMINISTRATION IPPU PRESENTATION JOHN NAKABAGO.
AVAILABILITY BASED TARIFF SCHEDLING PROCEEDURE AND SETTLEMENT MECHANISM UNDER ABT REGIME T. SRINIVAS MANAGER,SRLDCBANGALORE.
A NEW CORPORATE FIRM UNDER THE LIMITED LIABILITY PARTERNERSHIP ACT,2008 (Effective from7 th January 2009)
Post Award Workshop April 5, Fiscal Responsibilities 1. University Wide Responsibilities Every university employee has a responsibility to ensure.
INTRA STATE ABT Necessity Issues Implementation. Some of the features of New National Electricity Policy – Feb.’05 Appropriate Commissions to undertake.
PART IX: EMERGENCY EXPOSURE SITUATIONS Module IX.1: Generic requirements for emergency exposure situations Lesson IX.1-2: General Requirements Lecture.
1 THE INDIA ELECTRICITY MARKET TIME LINE REAL TIME 15 MT BLOCKS LONG TERM LOAD FORECAST FUND MOBILISATION 10-5 YEARS POWER PURCHASE AGREEMENTS CAPACITY.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 3rd SRPC MEETING 19 th February 2007 Bangalore GRID EVENTS AND ISSUES.
Module on Computation of PoC Transmission Charges
IEGC PROVOSIONS FOR RENEWABLE GENERATION SCHEDULING & UI SETTLEMENT 1.
1. 2 ENERGY MANAGEMENT SYSTEM AN OVERVIEW AN OVERVIEW.
Billing, Collection and Disbursement Procedures
SCHEDLING MECHANISM AND RELATED ISSUES T. SRINIVAS MANAGER,SRLDC BANGALORE.
Copyright© JSE Limited ROLLING OF SETTLEMENT AND FAILED TRADE PROCEDURES Brett Kotze Clearing & Settlement Division 05 August 2008.
(C) NordPool1 The Nordic Power Market Zonal Pricing Jan Vidar Thoresen Managing Director Nord Pool Consulting AS.
REVISION OF SCHEDULES/REQUISITIONS A)OUTAGE OF GENERATING UNIT B) REVISED DECLARATION OF AVAILABILITY BY CGS C) OUTAGE OF A TRANSMISSION ELEMENT D)UNFORESEEN.
With amendments w.e.f  (1) In these regulations, unless the context otherwise requires,-  (a) ‘Act’ means the Electricity Act, 2003 (36.
Section 7.5 –4 – ii of Indian Electricity Grid code (IEGC): “The summation of station-wise ex-power plant drawal schedules for all ISGS after deducting.
THE RIGHT TO INFORMATION ACT, SECTION 3 Subject to the provisions of this Act, all citizens shall have the right to information.
Explanation of Latest Changes to Draft Reserves Schedule, Service Schedule D Contact: Arnie Podgorsky Mike Thompson Wright & Talisman PC
PETITION BY TNEB TO INVESTIGATE ANY GAMING BY THE GENERATORS PETITION NO:- 90/2005 CERC HEARING ON 06-OCT-05.
GRID OPERATION AND CONTROL. MAIN COMPONENTS OF THE GRID  GENERATION  LOAD  TRANSMISSION NETWORK.
Open Access for Renewables New initiatives. Scheduling and OA of RE Open Access through LTA/ MTOA/ STOA route envisaged Applicable to Wind and Solar without.
1 UNC Modification 429 Customer Settlement Error Claims Process – Guidance Document.
ABT / IEGC CLAUSES While making or revising their declaration of capability, the generator shall ensure that their declared capability during peak hours.
HYDRO TARIFF Commission Tariff Notification 26/03/01 Commission Tariff Notification 26/03/01 Applicable Period 01/04/01 to 31/03/04 Applicable Period 01/04/01.
Mod 166 Review Group Incremental Exit Capacity at New and Existing Exit Points.
Explanation of Changes to Draft “Firming” Schedule, Service Schedule E Contact: Arnie Podgorsky Mike Thompson Wright & Talisman PC
Congestion regulations. Definitions and Interpretation “Available Transfer Capability (ATC)” means the transfer capability of the inter- control area.
Service Quality Innovation Trust Safety The Samet Way “Managing the Company Cash Position” Accounts Payable (AP) should always be less than Accounts Receivable.
G1 G2 SERC SLDC SEB/STU State Govt. RLDC REB CTU CERC Central Govt. CEA ISTS ISGS Load L1L2 Intra State System IEGC to Operate on the periphery X=- GLG.
Outage Planning Subcommittee Mark Wilson. Outage Planning Subcommittee Created to address Market Participant concerns with existing rules and procedures.
Science & Engineering Research Support soCiety Guest Editor Guidelines for Special Issue 1. Quality  Papers must be double -blind.
POWER SECTOR REFORMS Grid Operation and Control in the changed Scenerio.
T&SC Modification Proposal: Clarification of Outturn Availability
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 2 nd SRPC MEETING 30 TH OCTOBER 2006 HYDERABAD GRID EVENTS AND ISSUES.
Philippine Feed-In Tariff System Implementation 1.
Availability Based Tariff (ABT) in Northern Region.
Renewable Energy Act of 2008
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
AVAILABILITY BASED TARIFF AND SCHEDULING MECHANISM.
NORTHERN REGIONAL LOAD DISPATCH CENTER 1.Revision Of Ceiling Of UI Rates and slope. 2.Revision Of Schedule after a Transmission Constraint is over. 4.RLDC’s.
SOUTHERN REGIONAL GRID ▀ Centre Generating Stations in the Region are Ramagundam Super Thermal Power Stn. : 2,600 MW (200x x4) Neyveli Lignite Corporation.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
Issue of Declared Capacity (DC), and Actual Generation (AG) by Generating Stations Hon’ble Commission has issued Interim order dated 19/ directing.
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
INJECTING UTILITYSTATEEXPORT (MU) TNEBTAMILNADU673 KPTCLKARNATAKA205 KSEBKERALA1792 APPCCANDHRA PRADESH426 JINDALKARNATAKA274 KPCLKARNATAKA593 JSWELKARNATAKA1058.
Southern Regional Power Committee Central Electricity Authority.
MERIT ORDER SCHEDULING AND DESPATCH V. K. AGRAWAL NRLDC.
Concept Note Preparation CYPRIOT CIVIL SOCIETY IN ACTION IV.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
A Jurisprudential Model for Sustainable Water Resources Governance By Professor D. E. Fisher.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 2 nd SRPC MEETING 30 TH OCTOBER 2006 HYDERABAD GRID EVENTS AND ISSUES.
- Special Education Needs (SEN) Network Administrative and Financial Aspects.
1 Details of the Sword Contract Kick-off meeting Autonomous Province of Trento Trento, December 18-19, 2014 SWORD (School and WOrk-Related Dual learning)
Grid Operation --- Role of RLDC. Contents Load Generation Balance Electricity Accounting Real Time Trends ABT Feedback Inter Regional Exchanges Loading.
Open Access.
Open Access.
INTERCONNECTION GUIDELINES
Scheduling of Collective Transactions Through Power Exchange
Congestion regulations
Flexibility in Utilization of Domestic Coal
GRID STATUS – PRE - ABT Very wide Frequency fluctuations
“ MERIT ORDER SCHEDULING AND
ExhibitorLive 2018 IFES Global Village
Presentation transcript:

SCHEDULING METHODOLOGY The station-wise (Ex-bus) capability would be submitted by the ISGSs in the specified format. ISGSs would declare the capability i.e. the MW and MWH quantum in the absolute values and not in the form of some relative percentages or in any other manner.

SCHEDULING METHODOLOGY Based on the declared capability & the allocations of different States / Beneficiaries in different ISGSs, the station wise entitlements would be worked out and intimated to all the States/Beneficiaries by NRLDC.

SCHEDULING METHODOLOGY The requisitions would be submitted by the States in the specified format. The States would submit the requisitions in absolute values indicating the quantum desired against the given entitlement, and not the quantum surrendered. The requisitions in case of nuclear and run of the river hydro stations would be equal to the entitlements.

SCHEDULING METHODOLOGY The details of the despatch and drawal schedules and Unrequisitioned, surpluses shall be available on NRLDC website. In addition to that NRLDC shall also flash the ‘Current Status Report’ on the web-site, which would indicate the details of the revisions in schedule, information about any units kept closed / desynchronized due to low demand, GTs operating in open cycle, transmission constraints and any other important information related to scheduling/grid.

SCHEDULING METHODOLOGY As a general practice the information for preparing the day ahead schedule would be exchanged using INTERNET / . However, in the event of any difficulty in INTERNET connectivity or some other unforeseen situation, as a back-up arrangement, the information would be exchanged through fax.

SCHEDULING METHODOLOGY All the constituents have to continuously augment and strengthen the INTERNET connectivity in their Control Rooms so that the ultimate objective of exchanging all the information using electronic media be achieved at the earliest.

SCHEDULING METHODOLOGY In the event of any unrequisitioned surpluses, the Owner State ( the State to which the share actually belongs and pays the capacity charges) may find out a suitable Buyer/ Willing State to take such unrequisitioned surplus and/or the Buyer/Willing State may contact the Owner State for such exchange. The agreed bilateral exchanges be intimated / consented to NRLDC by both the States for incorporating in the final schedules.

SCHEDULING METHODOLOGY Any unrequisitioned surpluses still available, can be agreed for bilateral exchanges between the concerned ISGS and one or more desiring States. The agreed bilateral exchanges from ISGS to a State be intimated to NRLDC by both the agencies (ISGS as well as States) for incorporation in the final schedule.

SCHEDULING METHODOLOGY During the current day in case the Owner State requisitions back its surrendered share, then the same is withdrawn from the other State/ States to which it was allocated as surplus energy and the schedules are revised in line with the Grid Code. While making or revising their declaration of capability the generators shall ensure that the declared capability during peak hours is not less than during other hours.

SCHEDULING METHODOLOGY While communicating the requisitions, the States shall ensure that:  maximum economy and efficiency in the operation of the power system in the State is achieved while requisitioning and /or surrendering power from different ISGSs vis-à-vis from their own stations.  the requisitions are operationally reasonable, particularly in terms of ramping-up / ramping-down rates and ratio between minimum and maximum generation levels, and are in line with the agreed philosophy in the region amongst different agencies.

SCHEDULING METHODOLOGY In the event of despatch schedule in respect of a particular ISGS having ratio of off-peak to peak below a certain percentage (as agreed between NTPC and the State constituents in the 334 th OCC meeting of NREB held on 11 th November, 2002, in case of the units operated on gas it would be taken as 60 % under normal conditions and as 50 % under exceptional conditions and in respect of thermal units it would be taken as 70%) and /or the changes in requisition between two successive blocks is higher than a certain quantum (the exact details to be submitted by NTPC), then the State/States due to which such anomaly is being experienced would be requested by NRLDC to change its/their requisition in that particular ISGS, to make the schedule operationally reasonable.

SCHEDULING METHODOLOGY While issuing the final schedules, NRLDC shall check that the schedules do not give rise to any transmission constraints. In case any imperssible constraints/ anomalies are foreseen, the RLDC shall moderate the schedules to the required extent, under intimation to the concerned agencies.

SCHEDULING METHODOLOGY During the periods of low demand in the region, in spite of all efforts if the despatch schedule of an ISGS(s) during certain blocks in the off-peak period remains below the minimum agreed value, and the concerned ISGS (s) is not able to operate the units due to technical constraints, then the concerned ISGS(s) may close down some unit(s) in consultation with NRLDC and the despatch schedule of the ISGS(s) shall be revised accordingly. Under such a situation the net drawal schedule of the beneficiary (ies) having share in the ISGS(s), may get reduced during peak hours also.

SCHEDULING METHODOLOGY If at any point of time NRLDC observes that there is need for revision of schedules in the interest of better system operation, it may do so on its own and make it effective in line with the grid code provisions. While entering into a bilateral agreement, the concerned parties shall ensure that the agreements are clear and explicit and contains all the relevant details which may be necessary from scheduling and computation of energy flows.

SCHEDULING METHODOLOGY Before finalizing the agreement the concerned parties must obtain prior consent of NRLDC with respect to any foreseeable transmission constraints etc. The copy of the bilateral agreement between the parties, clearly indicating all the relevant details viz. date and time of commencement and duration of the agreement, quantum of exchange, delivery / take-off point for the purpose of accounting, and force-majeure conditions etc. shall be submitted to NRLDC well in advance.

SCHEDULING METHODOLOGY Since issuing the final despatch and drawal schedule is a critical activity and considerable time is involved in its preparation and carrying out requisite moderation, if any, the activity of sending any revisions etc. to NRLDC for incorporating in the final schedule would be completed by 2100 hrs. of each day instead of 2200 hrs.