ABT / IEGC CLAUSES While making or revising their declaration of capability, the generator shall ensure that their declared capability during peak hours.

Slides:



Advertisements
Similar presentations
Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
Advertisements

1 FREQUENCY CONTROL -- Bhanu Bhushan -- (April, 2011)
Sistan & Balouchestan Electric Power Distribution Company
ENQUIRY BY SRLDC TO VERIFY THE DETAILS OF DC & AG BY NTPC AND NLC STATIONS PETITION NO:- 67/2003 (suo motto) & PETITION NO:- 90/2005 (TNEB) CERC HEARING.
OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
Energy Storage Definitions/Definitions ETWG 18 Feb 2013.
Maharashtra State Load Despatch Centre Role of SLDC in RRF Implementation & Issues By MSLDC.
Congestion When transmission demand >capability When Voltage levels in a corridor beyond operable limits When Real time line flow exceeds the TTC Most.
PROCEDURE FOR:: REAL TIME CONGESTION MANAGEMENT. ASSESSMENT OF TTC TTC/ATC assessment is carried out after construction & solution of a base case power.
INTRA STATE ABT Necessity Issues Implementation. Some of the features of New National Electricity Policy – Feb.’05 Appropriate Commissions to undertake.
Miao Lu 1. Content Overview I. Load Models II. Economic Dispatch III. Disturbance and Recovery IV. Demand-Side Management V. Energy Storage Units VI.
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
1 THE INDIA ELECTRICITY MARKET TIME LINE REAL TIME 15 MT BLOCKS LONG TERM LOAD FORECAST FUND MOBILISATION 10-5 YEARS POWER PURCHASE AGREEMENTS CAPACITY.
IEGC PROVOSIONS FOR RENEWABLE GENERATION SCHEDULING & UI SETTLEMENT 1.
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
SCHEDLING MECHANISM AND RELATED ISSUES T. SRINIVAS MANAGER,SRLDC BANGALORE.
REVISION OF SCHEDULES/REQUISITIONS A)OUTAGE OF GENERATING UNIT B) REVISED DECLARATION OF AVAILABILITY BY CGS C) OUTAGE OF A TRANSMISSION ELEMENT D)UNFORESEEN.
Electric vehicle integration into transmission system
Effect of generation loss and Frequency Response Characteristics (FRC) on tie-line flow to Southern Region under various scenarios and Target setting for.
OSC Meeting April 27, Transmission Cost Allocation Overview.
With amendments w.e.f  (1) In these regulations, unless the context otherwise requires,-  (a) ‘Act’ means the Electricity Act, 2003 (36.
Section 7.5 –4 – ii of Indian Electricity Grid code (IEGC): “The summation of station-wise ex-power plant drawal schedules for all ISGS after deducting.
Sanjay Garg General Manager PGCIL/ Ministry of Power
March 11, 2011 RPG Meeting Lower Rio Grande Valley (LRGV) Import.
PETITION BY TNEB TO INVESTIGATE ANY GAMING BY THE GENERATORS PETITION NO:- 90/2005 CERC HEARING ON 06-OCT-05.
The Energy Policy Act of 2005 and Its Revisions to PURPA November 11, 2005 Grace D. Soderberg Assistant General Counsel National Association of Regulatory.
GRID OPERATION AND CONTROL. MAIN COMPONENTS OF THE GRID  GENERATION  LOAD  TRANSMISSION NETWORK.
Managing a Power System with 40% Wind Dr Alan Rogers EirGrid.
Renewables and System Services Ann Scully.
Open Access for Renewables New initiatives. Scheduling and OA of RE Open Access through LTA/ MTOA/ STOA route envisaged Applicable to Wind and Solar without.
SCHEDULING METHODOLOGY The station-wise (Ex-bus) capability would be submitted by the ISGSs in the specified format. ISGSs would declare the capability.
HYDRO TARIFF Commission Tariff Notification 26/03/01 Commission Tariff Notification 26/03/01 Applicable Period 01/04/01 to 31/03/04 Applicable Period 01/04/01.
NLDC 1 Ancillary Services in Indian Context. NLDC 2 Outline Definition Drivers for Ancillary Services Ancillary Services in Indian Context.
Regulatory Framework in Indian Power Sector Module C5 V K Agrawal ED, NLDC POSOCO.
IMPACT OF ABT, NETWORK STRENGTHENING ON GRID OPERATION IN KARNATAKA SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED ADVANTAGE.
Congestion regulations. Definitions and Interpretation “Available Transfer Capability (ATC)” means the transfer capability of the inter- control area.
1 INTRA – STATE AVAILABILITY BASED TARIFF (ABT) A Presentation on INTRA – STATE AVAILABILITY BASED TARIFF (ABT)
G1 G2 SERC SLDC SEB/STU State Govt. RLDC REB CTU CERC Central Govt. CEA ISTS ISGS Load L1L2 Intra State System IEGC to Operate on the periphery X=- GLG.
-- Bhanu Bhushan -- < > (August, 2011)
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
POWER SECTOR REFORMS Grid Operation and Control in the changed Scenerio.
AN OVERVIEW IN RESPECT OF CPP’S IN SOUTHERN REGION STATES.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 2 nd SRPC MEETING 30 TH OCTOBER 2006 HYDERABAD GRID EVENTS AND ISSUES.
Availability Based Tariff (ABT) in Northern Region.
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
AVAILABILITY BASED TARIFF AND SCHEDULING MECHANISM.
Planning for Texas’ Energy Future Select Committee on Electric Generation Capacity and Environmental Effects Bob Kahn President & CEO February 6, 2008.
NORTHERN REGIONAL LOAD DISPATCH CENTER 1.Revision Of Ceiling Of UI Rates and slope. 2.Revision Of Schedule after a Transmission Constraint is over. 4.RLDC’s.
SOUTHERN REGIONAL GRID ▀ Centre Generating Stations in the Region are Ramagundam Super Thermal Power Stn. : 2,600 MW (200x x4) Neyveli Lignite Corporation.
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
Capacity, Demand and Reserves Report Bill Bojorquez Board of Directors Meeting May 16, 2007.
Issue of Declared Capacity (DC), and Actual Generation (AG) by Generating Stations Hon’ble Commission has issued Interim order dated 19/ directing.
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
INJECTING UTILITYSTATEEXPORT (MU) TNEBTAMILNADU673 KPTCLKARNATAKA205 KSEBKERALA1792 APPCCANDHRA PRADESH426 JINDALKARNATAKA274 KPCLKARNATAKA593 JSWELKARNATAKA1058.
Southern Regional Power Committee Central Electricity Authority.
AVAILABILITY BASED TARIFF. - Tariff structures - Two part tariff - Concept of ABT - ABT structure - Expectations from OEMs/Utilities Session outline.
MERIT ORDER SCHEDULING AND DESPATCH V. K. AGRAWAL NRLDC.
Main flexibility tools for the adoption of high emission standards for LCPs set in the new Industrial Emissions Directive Gerard Lipinski Coordinator of.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 2 nd SRPC MEETING 30 TH OCTOBER 2006 HYDERABAD GRID EVENTS AND ISSUES.
EE590 Transmission Planning Projects and Cost Allocation Ming NI Economic Studies, Midwest ISO.
Grid Operation --- Role of RLDC. Contents Load Generation Balance Electricity Accounting Real Time Trends ABT Feedback Inter Regional Exchanges Loading.
Economic Operation of Power Systems
Combined operation of different power plants PREPARED BY : Priyanka Grover Btech (EE) SBSSTC,FZR.
Congestion regulations
GRID STATUS – PRE - ABT Very wide Frequency fluctuations
“ MERIT ORDER SCHEDULING AND
Impact of Wind Farms Aggregation on Large System Scheduling Cost Under Frequency Linked Deviation Settlement Mechanism Presented by Anoop Singh Authored.
Solar Energy Commercialization
National Institute of Wind Energy(NIWE)
Presentation transcript:

ABT / IEGC CLAUSES While making or revising their declaration of capability, the generator shall ensure that their declared capability during peak hours is not less than that during other hours. ABT Schedule-I Para 3 (iii) (Page iii) Capability Declaration during Peak hours:

ABT / IEGC CLAUSES The generating units operating at about 100% of their MCR shall be capable of (and shall not be prevented from ) going at least up to 105% of their MCR when frequency falls suddenly. IEGC Chapter-6, Para 6.2(g) (Page 6.2) Generation beyond DC

ABT / IEGC CLAUSES ABT Schedule-I Para 4(ii) (Page v) SOC for Thermal Stations shall be the DC, with all before-the- fact revisions / updating. The declared capacity shall not exceed the installed capacity. Generation beyond DC

ABT / IEGC CLAUSES In case it is observed that the declaration of its capability by the generator is on lower side and the actual generation is more than DC, then UI charges due to the generator on account of such extra generation shall be reduced to zero and the amount shall be credited towards UI account of beneficiaries in the ratio of their capacity share in the station. ABT Schedule-1 Para-6 (Page vi) Generation beyond DC

ABT / IEGC CLAUSES In case of gas turbine / combined cycle stations, the generator shall give DC for units / modules on gas fuel and DC for units / modules on liquid fuel separately. ABT Schedule-I Para 4 (Note 1) (Page v) Separate Schedules for Gas/Liquid

ABT / IEGC CLAUSES RLDC may direct the SLDCs/ ISGS to increase/decrease their drawal / generation in case of contingencies e.g. overloading of lines / transformers, abnormal voltages, threat to system security. IEGC Chapter-7 Para (Page-7.3) Revision of Schedules initiated by RLDCs

ABT / IEGC CLAUSES RLDC may revise the schedule in the interest of better system operation w.e.f 4 th time block. ABT Schedule-1 Para-3(xv) Revision of Schedules initiated by RLDCs

ABT / IEGC CLAUSES Revision of declared capability by generator (s) and requisition by beneficiary(ies) for the remaining period of the day will also be permitted with advance notice. Revised schedules / declared capability in such cases shall become effective from the 6th time block, counting the time block in which the request for revision has been received in RLDC to be the first one. ABT Schedule-1 Para (xiv) (Page (iv) Revision of schedules at the request of Generators/States

ABT / IEGC CLAUSES While finalising the above daily generation schedules for the ISGS, RLDC shall ensure that the same are operationally reasonable, particularly in terms of ramping-up/ramping- down rates and the ratio between minimum and maximum generation levels. IEGC Chapter-7 Para (Page 7.5) Ramping-up/Ramping-down

ABT / IEGC CLAUSES The Regional Load Despatch Centre may give such directions and exercise such supervision and control as may be required for ensuring integrated grid operations and for achieving the maximum economy and efficiency in the operation of the power system in the region under its control IEGC Chapter-2 Para 2.2. (2) (Page 2-1) Integrated Grid Operations and Economey

ABT / IEGC CLAUSES The primary objective of integrated operation of the Regional grids is to enhance the overall operational economy and reliability of the entire electric power network spread over the geographical area of the interconnected States. Participant utilities shall co-operate with each other and adopt Good Utility Practice at all times for satisfactory and beneficial operation of the Regional grid. IEGC Chapter-6 Para 6.1 (a) (Page 6-1) Integrated Grid Operations and Economey

ABT / IEGC CLAUSES IEGC Chapter 2 Para2.6(1) (Page 2-4) Subject to the provisions of sub- section 55(3) of the Act, State Load Despatch Centre in a State may give such directions and exercise such supervision and control as may be required for ensuring the integrated grid operations and for achieving the maximum economy and efficiency in the operation of the power system in that State. Integrated Grid Operations and Economey

ABT / IEGC CLAUSES The system of each State shall be treated and operated as a notional (flexible) control area. The summation of scheduled drawal from ISGS and any bilateral inter-change shall provide the drawal schedule of each State, and this shall be determined in advance on daily basis. IEGC Chapter-7 Para 7.4 (2) (Page 7-2) Integrated Grid Operations and Economey

ABT / IEGC CLAUSES The Regional grids shall be operated as loose power pools in which the States shall have full operational autonomy, and SLDCs shall have the total responsibility for- i) scheduling / despatching their own generation (including the generation of their captive licensees), (ii) regulating the demand of their customers, (iii) scheduling their drawal from the ISGS (within their shares in the respective plant’s capability), (iv) arranging any bilateral interchanges, and (v) regulating their net drawal from the regional grid as per agreed guidelines. IEGC Chapter-7 Para 7.4 (1) (Page 7-1) Integrated Grid Operations and Economey

ABT / IEGC CLAUSES Based on the requisitions given by the beneficiaries and taking into account technical limitations on varying the generation and also taking into account transmission system constraints, if any, RLDC shall prepare the economically optimal generation schedules. ABT Schedule Para 3 (vi) (Page iii) Integrated Grid Operations and Economey