LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Overview LAT Environmental Test.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
Advertisements

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Safety Overview.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems Radiator and X-LAT Assy1 GLAST Large Area Telescope:
GLAST LAT Project I&T Meeting – Jan 29,2004 E. Gawehn 1 GLAST Large Area Telescope: MGSE Status Report Eric Gawehn SU-SLAC I&T MGSE Engineer
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 1 Presentation 8 of 12 Integration and Test GLAST Large Area Telescope: Pre-Shipment Review Integration.
Where to put Towers A and B in the Grid – technical issues 18-Jan-2005 L. Wai (SLAC/Group K) for LAT I&T.
GLAST LAT Instrument LAT Monthly Status Review Aug 1, 2007 W N Johnson, NRL 1 GLAST Observatory TVAC at NRL Aug 1, 2007 Neil Johnson NRL
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May Dynamics Tests LAT Environmental.
GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review LAT Test Verification Process Presentation 4 of 12 GLAST Large Area Telescope Gamma-ray Large.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
ISOC/SVACInstrument Analysis Meeting, Quatorze Juillet, 2006 Anders W. Borgland 1 Announcements Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
1 GLAST LAT Arrival at Spectrum Assuming That the LAT Transport Container Arrives on Flatbed Truck Question: Can Transport Cover Support Crane Lift With.
GLAST LAT ProjectEnv Test Planning, 3-4 May 2005 LAT Environmental Test PDR 1 LAT Environmental Test Planning and Design Review 3-4 May 2005 LAT EGSE and.
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 14 March March 2005 LAT High Bay Operations Supporting Test Events LAT.
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
GLAST LAT Project ACD CDR Jan 7-8, Section 7 Mechanical Ground Support Equipment GLAST Large Area Telescope: AntiCoincidence Detector (ACD) Mechanical.
GLAST Large Area Telescope:
GLAST LAT I&T GLAST Monthly Mission Review Nov 3, 2005 wnjohnson 1 Monthly Mission Review LAT Environmental Test Planning November 3, 2005 W Neil Johnson.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: Pre-Environmental Test.
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 16 March 2005 LAT High Bay Operations Supporting Non-Test Events LAT Engineering.
LAT Design Integration and Analysis1 GLAST LAT Project1 Sep 2005 LAT Monthly Status Review 1 Sep 2005 Design Integration and Analysis LAT Monthly Status.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June RBSP EFW Spin Plane Booms Greg Dalton Space Sciences.
LAT-PR Section 55-1 GLAST LAT ProjectMechanical Design Integration Peer Review, March 2003 Mechanical Design Integration Peer Review, March 2003.
Systems Integration1 GLAST LAT ProjectMarch 2005 LAT Environmental Test Planning Meeting March 2005 Thermal-Vacuum Testing LAT Environmental Test.
NRL Pathfinder Planning Meeting1 GLAST LAT Project07 September 2005 NRL Pathfinder Planning Meeting Dynamics Testing Update NRL Pathfinder Planning Meeting.
LAT TVAC Test Delta-PDR1 GLAST LAT Project25 May 2005 LAT Environmental Test Planning and Design Delta-Preliminary Design Review 25 May 2005 LAT T-Vac.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware December 2004 Status Marc Campell, Subsystem Manager.
LAT Environmental Test PDR1 GLAST LAT Project 3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 EMI/EMC LAT Environmental Test.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
Systems Integration1 GLAST LAT ProjectMarch 2005 LAT Environmental Test Planning Meeting March 2005 Environmental Test MGSE Design Concepts Rev 1.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 10 of 12 Mechanical Test 1 GLAST Large Area Telescope Pre-Environmental Test.
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Thermal-Vacuum Test Configuration.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Operations and Logistics LAT Environmental.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT I&T MGSE Page 1 of 11 GLAST Large Area Telescope: I&T Integration Kickoff Meeting MGSE March.
GLAST LAT Project April 27, 2006: LAT Pre-Ship Review Presentation 10 of 12 Mechanical Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review Mechanical.
GLAST LAT Project13 June 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review Project Overview 1 Presentation 1 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review W.
LAT-TD Page 1 GLAST LAT ProjectEnvironmental Test TIM, Day 1: Structural Tests, March 14, 2005 Agenda: LAT Environmental Test TIM, Day 1: Structural.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
GLAST Large Area Telescope:
Mechanical Integration
Environmental Test Planning
LAT Requirements Verification in TVAC
Integration and Test GLAST Large Area Telescope:
Baseline Environmental Test Flow at NRL
2K CB FDR Overview:  Agenda, Charge, Review Process
GLAST LAT System Engineering
GLAST Large Area Telescope
GLAST LAT System Engineering
LAT Pre-Environmental Test Plan
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
Thermal Vacuum Test: Plans and Procedures
GLAST Large Area Telescope:
Integration and Test Organization Chart
Mechanical/Thermal Systems
Environmental Test Planning Meeting
GLAST Large Area Telescope: I&T Test Readiness Review
LAT Environmental Test Planning and Design Review
Introduction and Overview
Design Integration and Analysis
Presentation transcript:

LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Overview LAT Environmental Test Planning and Design Review 3-4 May 2005 Overview Martin Nordby

LAT Environmental Test PDR2 GLAST LAT Project3-4 May 2005 Goals of This Review Where we are now –This is likely the last time that we will review our overall test program for the LAT environmental testing until the Test Readiness Review –Much of what we will be presenting and reviewing has been gone over in one forum or another over the past 3-4 months, but not all in one place and time Goals of this review –1. Approve the environmental test sequence—both the general sequence of tests, as well as the specific sequencing of the segments of each test that are presented as part of the individual test plans –2. Approve the preliminary designs for the test MGSE and EGSE for all of the tests –3. Approve the goals and plans for each of the tests—Test Plans will be sent out for review soon, but this review is intended to finalize the structure and major segments of the tests Where we are going –After this review, we will be holding only detailed reviews to cover specific topics –In particular There will likely be individual table-top reviews of the Test Plans as they are sent out for release CDR’s will be held prior to sending the large pieces of MGSE Pathfinder review will be held before we start the pathfinder program for data systems or mechanical operations TRR will be held after the pathfinder program is complete and procedures updated—this may be part of the LAT pre-ship review, focusing on plans, procedures, and logistics, and demonstrating that we are ready to receive the LAT at NRL Individual TRR’s for each test—focusing on the specifics for each test, and a more technical discipline review of the test program

LAT Environmental Test PDR3 GLAST LAT Project3-4 May 2005 Environmental Test Sequence LAT-MD-00408, the “LAT Instrument Performance Verification Plan” delineates the basic content and order of all required LAT environmental tests –This responds to the requirements put forth in the MAR, GEVS, IRD, and other governing documents LAT-MD-02717, the “LAT Environmental Test Sequence” details the order of environmental tests, and the major operational steps –This is subservient to the LAT-MD-00408, but includes significantly more operational detail –This bridges the logistics gap between the MD and the Test Plans, much as LAT- MD , the “LAT Integration Sequence” provides direction for LAT integration LAT-MD needs to be updated to reflect the final sequence agreed on by all test directors and subject-matter leads. Below is the updated sequence that will be baselined Sine Vibe EMI/EMC L L Reconfig. LAT Acoustic L T-CycleT-Bal Remove Radiators Weight, CG Ship to Spectrum C C L Receive, Unpack C L L Limited Performance Comprehensive Performance SVAC Test C S L Pack LAT L Final CPT C Perform Reference CPT (at SLAC) S 4X Mount Radiators L SCS Updated LAT Environmental Test Sequence

LAT Environmental Test PDR4 GLAST LAT Project3-4 May 2005 Test Sequence Walk-Through Reference CPT –Perform Reference CPT at SLAC prior to shipping Receiving and Prep –Unpack LAT; leave on pallet base (A-59 high bay) –Run CPT: establish instrument health prior to start of env testing (LAT clean tent) Sine Vibe Test –Move to vibe test lab –Run LPT: on vibe table expander head, prior to start of test –Perform Z-axis vibe –Run LPT: on vibe table expander head, prior to Z-axis tear-down –Move LAT to slip table and perform X-axis vibe –Run LPT: on slip table, prior to X-axis tear-down –Re-orient LAT on slip table and perform Y-axis vibe –Run LPT: on slip table, prior to removing LAT –Move LAT back to A-59 high bay clean tent Re-configure LAT –Hoist LAT onto Test Stand (A-59 high bay) EMI/EMC Test –Move to anechoic chamber –Run LPT: in anechoic chamber, prior to test –Perform EMI/EMC testing –Run LPT: after test, before breaking config –Move LAT back to A-59 high bay

LAT Environmental Test PDR5 GLAST LAT Project3-4 May 2005 Test Sequence Walk-Through (cont. 1) Install Radiators –Integrate Radiators (A-59 high bay) –Run Radiator CPT after both Radiators are installed (LAT clean tent) –Run LAT LPT (LAT clean tent) Acoustic Test –Move to acoustic test cell –Run LPT: in acoustic test cell, prior to test –Perform Acoustic test –Run LPT: in acoustic chamber, prior to removing LAT –Move LAT back to A-59 high bay Re-orient LAT (A-59 high bay) –Mount extension beams to Test Stand –Rotate LAT 90 degrees using two-hook lift and spreader bars Prep for Thermal-Vacuum Test (A-59 high bay) –Pick up LAT and set on T-Vac cart –Move LAT to T-Vac chamber and prep for test –Roll LAT into chamber –Run CPT: in T-Vac chamber, prior to door closing –Run SVAC test: in T-Vac chamber, prior to door closing –Close chamber door

LAT Environmental Test PDR6 GLAST LAT Project3-4 May 2005 Test Sequence Walk-Through (cont. 2) Thermal-Vacuum Test (T-Vac chamber) –Pump down –Bake out –Hot survival: run Initialization, Aliveness, and CPT tests –Thermal-balance hot: run LPT, SVAC, TCS Perf tests –Thermal-balance cold: run LPT, SVAC, TCS Perf tests –Cold survival: run Initialization, Aliveness, and CPT tests –Thermal cycle hot (2): run LPT –Thermal cycle cold (2): run LPT –Thermal cycle hot (3): run LPT –Thermal cycle cold (3): run LPT –Thermal cycle hot (4): run CPT –Thermal cycle cold (4): run CPT –Return to ambient temperature –Vent chamber –Run final LAT CPT: in T-Vac chamber after venting and opening doors –Run SVAC: in T-Vac chamber after venting and opening door –Break configuration and return LAT to A-59 high bay

LAT Environmental Test PDR7 GLAST LAT Project3-4 May 2005 Test Sequence Walk-Through (cont. 3) Remove Radiators (A-59 high bay) –Mount extension beams to Test Stand –Rotate LAT 90 degrees back to vertical using two-hook lift and spreader bars –Remove and pack Radiators Weight and C.G. Measurement (A-59 high bay) –Hoist LAT off Test Stand onto CG Plate –Measure LAT weight and center of gravity –Hoist LAT off CG Plate and onto pallet base –Move into clean tent Pre-Ship Review Pack LAT and Ship –Prep and seal Transport Container –Ship to Spectrum