From Concept to Reality. F & B Farms and Nursery Kaizen event June 2011 Potting Line Process Before conditions: Inconsistent work – particularly on machine.

Slides:



Advertisements
Similar presentations
The Five Ss.
Advertisements

Processing New Herbarium Collections Using EMu The last bits of paper Nicole Tarnowsky.
Bringing Sanity to Clinical Work Life Lean in Healthcare Michael Nelson, MD Blue Corn Professional Services, LLC.
Understanding 5S.
5S Workplace CI Department, Supply Cabinet March 2009.
5S BASIC TRAINING What is 5S and why do we want to do it?
 Sort the necessary from the unnecessary  Use the Red-Tag technique to highlight unneeded items  Manage all removed items Separate the essential from.
CONTINUAL IMPROVEMENT
Ch-3 5s1 5S Workplace Organization. Ch-3 5s2 5S 5S Contents: S1 --- Sort out. Get rid of the stuff you don’t needed. S2 --- Set in order. Place the stuff.
5. Phone Work … essential tips Avoid cradling the phone handset Avoid planting your elbow while holding the phone Position the phone for easy reach If.
A Practical Guide for Reducing Material Handling Loss Time Injuries © Risk Management Consultants, Ltd Lifting Training that Works!
An introduction to Lean tools and methodologies
5S Workplace Ancillary Testing Inventory storage BB120 April 2009.
Ergonomics and the UC Berkeley Campus Mallory Lynch, MA, CEA Ergonomics Specialist April 26, 2006.
Environmental conditions Maximum (ºC) Minimum (ºC) Rainfall (mm) 2014 June July August June
Mission Statement: The aim of this project is to improve the meat marinade tumbler transport in the Wegmans Culinary Innovation Center. Currently, meat.
1.Over Production: Producing more than is needed Over Production: Over Production: 2.Waiting: Idle Time (Down Time) Waiting: 3.Non-Utilized Talents: Under.
Introduction to 6S.
ARCHAEOLOGY - THE SYSTEMATIC STUDY OF PAST HUMAN LIFE AND CULTURE BY THE RECOVERY AND EXAMINATION OF REMAINING MATERIAL EVIDENCE, SUCH AS GRAVES, BUILDINGS,
CONTINUOUS IMPROVEMENT PROGRAM
Band Saw Safety Rules. Safety Rule #1 Keep all guards in place. Keep all guards in place.
Manufacturing Technology Safety: Band Saw. Safety Rule #1  Keep all guards in place.
Manufacturing Processes Copyright © Texas Education Agency, All rights reserved.
5S Improving safety & efficiency
WNS1.com Online Training How to use the Western Nevada Supply online store and tools.
Introduction: Throughout history and especially in today’s global economy, companies and agencies are constantly looking for ways to do more and more with.
A Workplace Organization Method
LEAN Roger Jones Joe Novello. Introductions Historical Background Baldridge Quality Framework.
Drill Press 09 Setup Reduction Kaizen Blitz September , 2002 Casey Backyard ProductsDrill Press 09 Setup Reduction Kaizen Blitz.
Visual Management Quick Review
LEAN TEAMS. Develop a Systematic process that consistently defines and solves problems utilizing Lean tools.
Quick Tour Through The 5 S’s of Visual Control Duke Rohe, FHIMSS.
© 2013 DST Systems, Inc. All rights reserved. The California Adventure.
Total Productive Maintenance (TPM)
5S Workplace Audit Category Item Level Sort Store Shine Standardize
5S REFRESHER What is 5S and why do we want to do it? Six Sigma Simplicity.
IENG 451 Stability. 4 Ms – Man or woman – Machine – Material – Method.
5-S Quick Learning Module Industrial Solutions, Inc.
Horticulture Science Lesson 44 Using Automated Systems in the Greenhouse.
HOME Copyright EASE Inc Tutorials© The “5S” Philosophy An EASEworks® Manufacturing Tutorial START Ver 6.
Chapter 16 Site Preparation. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify tasks required.
Ergonomic Considerations for Designing and Selecting Conveyor
Van Essen Nursery Kaizen event April 2011 Order pulling for shipping. Key try-storm: Combined plant prep (weeding, tagging and pot changing) with order.
Central Plant 5S Project Tool Storage Area
BRAZO ™ Smart design.. BRAZO designed by Pablo Pardo Best of Competition, NeoCon 2007 Gold - Best of NeoCon for Lighting, 2007 clean sustainable user.
Design of the Housekeeping Department
6 S System The Visual Workplace Directorate of Training and Education
Using 5S to Start Your Lean Journey Presented by: Brian D Krichbaum Process Coaching Incorporated.
5S Workplace Organization Northland Community & Technical College Presented by: Tim Bergerson, Robbi Brateng, Mitch Ostrom, Jesse Adkins, Bob Gooden,
Mums- the word. There are over 160 species of chrysanthemums. One of the most popular is Chrysanthemum morifolium, or florist chrysanthemum.
KAIZEN TEAM Dave Stelmachowski – Manager San Diego - 62 Robert Riggs – Manager San Francisco - 54 Adam Past – Lean Six Sigma Coordinator February 27 –
Focus on Value: Improving the Way We Work
5S for SAFETY program overview
5S WORKPLACE IMPROVEMENT Central Stores & Freight Room.
Band Saw Safety Rules.
Back Safety Plan Back disorders can develop gradually as a result of micro- trauma brought about by repetitive activity over time or can be the product.
Introduction to Lean Emily Varnado.
Theme Review Plants, Seeds and Soil
5S BASIC TRAINING What is 5S and why do we want to do it?
Band Saw Safety Rules.
5S TRAINING.
Back Safety Plan Back disorders can develop gradually as a result of micro- trauma brought about by repetitive activity over time or can be the product.
Band Saw Safety Rules.
5S BASIC TRAINING What is 5S and why do we want to do it?
Band Saw Safety Rules.
Exploring methods of planting ornamental plants 21.01
Band Saw Safety Rules.
5S BASIC TRAINING What is 5S and why do we want to do it?
5 functions of the 5S Methodology Example of the 5s Methodology
A door-to-door dry cleaning and laundry franchise
Presentation transcript:

From Concept to Reality

F & B Farms and Nursery Kaizen event June 2011 Potting Line Process Before conditions: Inconsistent work – particularly on machine set up. Area would get “cleaned up” only to fall back into disarray. Machine down time drastically reduced production (estimated time loss of 1 – 1.5 hours x 5 employees). Presented by Leigh Geschwill

 Management talks about improvement often amongst ourselves.  Many employees in production are non- native speakers.  Cultural differences can make it hard for employees to take initiative on their own.  Changes that had been made in the past don’t stick.

Step 1: 5S Kaizen event focused on 5S  Sort  Set in Order  Shine  Standardize  Sustain Clean Up Area (Sort) Remove unneeded items Red Tag Area Making The Area Work (Set in Order) What’s Left: A place for every thing and every thing in its place. Shine Be realistic about what “clean” needs to be for you

 Areas for Improvement (Opportunities):  Excess soil on the line  Machine adjustments awkward / not easily accessible  Pot filling not efficient  Access to plug tray for both sides of line  Line leveling  Room for Point of Use storage closer to machine

Opportunity: Remove Excess Soil Excess soil on the line: Makes a mess Clogs up filters on watering tunnel Tracks excess soil into greenhouse Detracts from plant value Try-storm Solutions: Add brushes at flat filler and before tunnel. Make sites to catch excess soil.

Opportunity: Machine Adjustments Initial Kaizen Improvements: Machine height setting guide Planting depth guide After Kaizen continued with: Daily, Shift and Job Posters for machine set up. More permanent planting depth guideline in larger (easier to see) format.

Opportunity: Pot Filling Before Kaizen: Pots and flats had no designated area. Flats being filled onto the ground. Prefilled flats led to excess inventory in line. After Kaizen: Designated spots for pots, flats and recycling cart. Kanban set up of only 5 flats in process at one time. No prefilled flats. Flats filled on conveyor (more ergonomic).

Opportunity: Access to Plug Tray Before Kaizen: Plug tray located on one side. Employees handed over plugs to other side – or employee reached. Plugs getting pulled and broken. During Kaizen: Bridge that had been made previously was put to use. Employee on line took initiative to reposition bridge to work better. Second bridge was added to stage next plug tray. Future Improvements: Will add sign post to put paperwork on where it will be easily accessible to planters.

 Employee buy-in critical to moving forward.  Not an overnight wonder fix-all. Requires small improvements daily and weekly.  Once basics established (5S standards) becomes easier to move ahead with more complicated tasks.  A good management tool for people who are not born managers.  Consistent results = consistent quality.