A framework for managing concurrent business and ICT development Frank Goethals - J. Vandenbulcke – W. Lemahieu – M. Snoeck K.U.Leuven – Belgium SAP-Research.

Slides:



Advertisements
Similar presentations
TI BISNIS ITG using COBIT &
Advertisements

4.1 Blended approaches: Information Engineering IMS Information Systems Development Practices.
Panel > Bled e-Commerce Conference > June 2004 Conceptual Business Models and Ontologies to improve the design and interoperability of the networked enterprise.
Info1409 De Montfort University1 Lecture 4 Analysing the Business Case (1) System Users and their needs Systems Analysis & Design Academic Year 2008/9.
7M822 Information Strategy 31 August 2010.
What is an Information System? Input of DataResourcesProcessing Data Data Control of System Performance Storage of Data Resources Output of InformationProducts.
Hosted by Achieving Best Business Performance Mark R. Willford, Partner Accenture.
Open System Architecture For CIM - CIMOSA Presented By: Vijay Ravichandran.
How to Manage Convergence ? DIGIT B2 - MIA – EA Team Dana Mateescu November 2010.
CPM -200: Principles of Schedule Management IPM 2002 Fall Conference PMI-College of Performance Management – Professional Education.
Introducing Time Horizons To Enterprise Networking Architecture Nuno Álvares Ribeiro 1 Ângelo Martins 2 João José Pinto Ferreira 3 1 FEUP-DEEC 2 DEI-ISEP.
Picture 1 model: ICT lifecycle in a company 1. business needs & business strategy 2. ICT strategy - ICT assessment - ICT strategic plan - ICT implementation/tactical.
Coordinating COTS Applications via a Business Event Layer Presented By: Maria Baron Written By: Lemahieu, Snoeck, Goethals, De Backer, Haesen, Vandenbulcke.
Integration Patterns: Matching Requirements to Solutions
Engineering, Operations & Technology | Information TechnologyAPEX | 1 Copyright © 2009 Boeing. All rights reserved. Architecture Concept UG D- DOC UG D-
Introduction to information systems
The Challenge of IT-Business Alignment
Putting HR on Balanced Scorecard
Auditing services for assurance in evaluation of companies’ information systems (technologies) efficiency Kherson State University Samchynska Yaroslava.
© 2013 Visible Systems Corporation. All rights reserved. 1 (800) 6VISIBLE Achievement of an Integrated Applications Environment Enterprise.
PERA Methodology.
CMS 00_ Copyright 2002 Raytheon Company All Rights Reserved CMMI – What a Difference a Sponsor Makes! Ann Turner Raytheon Company
ERP IMPLEMENTATION LIFE CYCLE KASHIF SHAMIM. Enterprise resource planning ERP covers the technique and concepts employed for the integrated management.
© Farhan Mir 2007 IMS Latest Trends in IT/IS (Enterprise Resource Planning) Complementary Case Studies By: Farhan Mir.
Cliquez et modifiez le titre Philippe GAUTREAU Souheil KARAM October 26th 2012 MONTREAL 1 Key Success Factors and Strategic Planning.
Naeem Hashmi, Information Frameworks, October 30, Extraprise Information Factory Naeem Hashmi Chief Technology Officer Information Frameworks
Modernisation of ESS infrastructure: The ESS instruments - a review E. di Meglio – P. Jacques – J.M. Museux.
Identifying Web Service Integration Challenges Frank Goethals SAP-Research Chair on ‘Extended Enterprise Infrastructures’ K.U.Leuven – Belgium
Quality Concepts within CMM and PMI G.C.Reddy
Veronique Freeman (440)
Page 1 Road map for e-business implementation in Extended Enterprise Project funded by the European Community under the ‘Competitive and Sustainable Growth’
1 A Model-Driven Approach For Information System Migration Raymonde Le Delliou 1, Nicolas Ploquin 2, Mariano Belaunde 3, Reda Bendraou 4, Louis Féraud.
EI2N2008 © O. Noran, P. Bernus 2008 Service Oriented Architecture vs. Enterprise Architecture: Competition or Synergy? Ovidiu Noran, Peter Bernus EI2N.
Enterprise and Global Management of Information Technology
SPE-RFI-R : FEB.1999 : NUL-ITD-Iwata 2-01 Needs for Software Development Model Hiromichi Iwata Information Technologies.
Chapter 3 Strategic Information Systems Planning.
L. A. S. E. R Local Authority Security Enterprise Reporting System Architecture.
ISD2008 © Ovidiu Noran 2008 EM GERA Generalised Reference Architecture EEM Enterprise Engineering Methodology EML Enterprise Modelling Language EET Enterprise.
ISD2008 © O. Noran, P. Bernus 2008 EM GERA Generalised Reference Architecture EEM Enterprise Engineering Methodology EML Enterprise Modelling Language.
Defining the Extended Enterprise 1 st Doctoral Seminar Frank Goethals F.E.T.E.W. - K.U.Leuven SAP-Research Chair on ‘Extended Enterprise Infrastructures’
P.Bernus 1999 New Applications Of GERAM to Virtual Enterprises And Networks Peter Bernus Griffith University June, 1999.
Slide 1 Eurostat Unit B3 – Statistical Information Technologies XBRL pilot TF meeting – 19 April 2007 Agenda item 2 Status of X-DIS/XBRL pilot project.
Integrated Architecture Framework (IAF)
Unified Software Practices v 5.0 Copyright  1998 Rational Software, all rights reserved 1 R Rational Unified Process  “de facto standard”, framework.
Part Chapter © 2009 The McGraw-Hill Companies, Inc. All rights reserved. 1 McGraw-Hill Information Technology in Business 1 Chapter 11.
VA’s Continuing Transformation Greg Giddens, Executive Director Enterprise Program Management Office June 19, 2013.
Proprietary and Confidential NOTICE: Proprietary and Confidential This material is proprietary to ProSoft Technology Group Inc. It contains confidential.
SPECTO IT TRAINING Contact us: INDIA: , USA : ,
What is EA? Program Pembudayaan EA & ISP KKM 2014 Ministry of Health 18 December 2014 Consulting.
Overview of Enterprise Integration Efforts at Penn State by Ravi Ravindran Chair, EI Steering Committee Professor of Industrial Engineering.
ERP Yesika Kristina Dea Pradana Darmawan Sukianti Merianti Meshiya CaterLee
Presenter: Fred Cummins, OMG BA SIG Co-Chairman Prof. Mark von Rosing, Global University Alliance Chairman Business Architecture research & overview.
Microsoft Cloud Adoption Framework Foundation
Future of EUROnu + Do we want to continue? + How?
ITU Arab Regional Development Forum 28 October 2013, Manama, Bahrain
MGT601 SME MANAGEMENT.
Developing IT Strategy for Business Value
Enterprise Java Bean. Overview of EJB View of EJB Conversation Roles in EJB, Types of Enterprise Beans Lifecycle of Beans Developing Applications using.
Regulatory Compliance in Information Systems Research
Agenda Workforce Development Coaching Mentoring
The Strategic Information Technology Formulation
Discussion: Discuss the IT needs of each process..
Geospatial Service Architecture Viewpoints
Upside Software Development Process
ESS Validation Project State of Play and next steps
November 1, 2007 In cooperation with:
System architecture, Def.
LEARNING & DEVELOPMENT STRATEGY: PROCESS OVERVIEW
Organisation av Integrations- & Informationsarbete
Presentation transcript:

A framework for managing concurrent business and ICT development Frank Goethals - J. Vandenbulcke – W. Lemahieu – M. Snoeck K.U.Leuven – Belgium SAP-Research Chair on ‘Extended Enterprise Infrastructures’

2 Agenda 1.What should software organizations (such as SAP) be learning 2.Helping Software Organizations to learn: The FADEE-framework 1A: Which standard B2B functionalities can be built in? 1B: How can Extended Enterprises be created?

3 SAP B A C Coordinating the Extended Enterprise

5 Concerns vs. Roles Role1Role2Role3Role4Role5 conern1X conern2XX conern3XX conern4XX conern5XX conern6X Role1Role2Role3Role4Role5 conern1X conern2XX conern3X conern4XX conern5XXX conern6X Company 1 Company 2

6 Individual Enterprise Extended Enterprise Identification phase Decommissioning phase Operational phase Implementation phase Design phase Requirements phase Concept phase Identification phase Business side ICT side Decommissioning phase Operational phase Implementation phase Design phase Requirements phase Concept phase Identification phase Decommissioning phase Operational phase Implementation phase Design phase Requirements phase Concept phase Identification phase Execution of operations Decommissioning phase Operational phase Implementation phase Design phase Requirements phase Concept phase Identification phase Decommissioning phase Operational phase Implementation phase Design phase Requirements phase Concept phase Identification phase Execution of operations Strategic Level Tactical Level Operational Level Decommissioning phase Implementation phase Design phase Requirements phase Concept phase FADEE : Framework f/t Architectural Development o/t EE Operational phase

7 Identification phase Decommissioning phase Operational phase Implementation phase Design phase Requirements phase Concept phase Identification phase Business side ICT side Decommissioning phase Operational phase Implementation phase Design phase Requirements phase Concept phase Identification phase Decommissioning phase Operational phase Implementation phase Design phase Requirements phase Concept phase Identification phase Execution of operations Decommissioning phase Operational phase Implementation phase Design phase Requirements phase Concept phase Identification phase Decommissioning phase Operational phase Implementation phase Design phase Requirements phase Concept phase Identification phase Execution of operations Strategic Level Tactical Level Operational Level Decommissioning phase Operational phase Implementation phase Design phase Requirements phase Concept phase Future Structure Implement

8 Decommissioning phase Operational phase Implementation phase Design phase Requirements phase Concept phase Identification phase 7 life cycle phases (types of activities) Individual Enterprise

9 Individual Enterprise life history Id Co Re De Im Operational De Individual Enterprise time Individual Enterprise

10 Decommissioning phase Operational phase Implementation phase Design phase Requirements phase Concept phase Identification phase Individual Enterprise – Planning horizon (management levels)

11 Individual Enterprise – Planning horizon (management levels) Decommissioning phase Operational phase Implementation phase Design phase Requirements phase Concept phase Identification phase Decommissioning phase Operational phase Implementation phase Design phase Requirements phase Concept phase Identification phase Decommissioning phase Operational phase Implementation phase Design phase Requirements phase Concept phase Identification phase Strategic Future Tactical Structure Operational Implement

12 Individual Enterprise – Business vs. ICT Decommissioning phase Operational phase Implementation phase Design phase Requirements phase Concept phase Identification phase Decommissioning phase Operational phase Implementation phase Design phase Requirements phase Concept phase Identification phase Decommissioning phase Operational phase Implementation phase Design phase Requirements phase Concept phase Identification phase Strategic Future Tactical Structure Operational Implement Decommissioning phase Operational phase Implementation phase Design phase Requirements phase Concept phase Identification phase Decommissioning phase Operational phase Implementation phase Design phase Requirements phase Concept phase Identification phase Decommissioning phase Operational phase Implementation phase Design phase Requirements phase Concept phase Identification phase Business side ICT side

13 Individual Enterprise Extended Enterprise Identification phase Decommissioning phase Operational phase Implementation phase Design phase Requirements phase Concept phase Identification phase Business side ICT side Decommissioning phase Operational phase Implementation phase Design phase Requirements phase Concept phase Identification phase Decommissioning phase Operational phase Implementation phase Design phase Requirements phase Concept phase Identification phase Execution of operations Decommissioning phase Operational phase Implementation phase Design phase Requirements phase Concept phase Identification phase Decommissioning phase Operational phase Implementation phase Design phase Requirements phase Concept phase Identification phase Execution of operations Strategic Level Tactical Level Operational Level Decommissioning phase Implementation phase Design phase Requirements phase Concept phase Operational phase

14 Extended Enterprise life history Id Co Re De Im Operational De Id Co Re De Im Operat. Extended Enterprise Individual Enterprise time Decomission Extended Enterprise

15 Individual Enterprise Extended Enterprise Identification phase Decommissioning phase Operational phase Implementation phase Design phase Requirements phase Concept phase Identification phase Business side ICT side Decommissioning phase Operational phase Implementation phase Design phase Requirements phase Concept phase Identification phase Decommissioning phase Operational phase Implementation phase Design phase Requirements phase Concept phase Identification phase Execution of operations Decommissioning phase Operational phase Implementation phase Design phase Requirements phase Concept phase Identification phase Decommissioning phase Operational phase Implementation phase Design phase Requirements phase Concept phase Identification phase Execution of operations Strategic Level Tactical Level Operational Level Decommissioning phase Implementation phase Design phase Requirements phase Concept phase Operational phase

16 Conclusions Different viewpoints on Extended Enterprise integration are needed. The FADEE is a first attempt to identify such viewpoints.

17 Questions?