SC Project Review of NCSX, April 8-10, 2008 S. Ramakrishnan - 1 Electrical Power Systems (WBS 4) S. Ramakrishnan NCSX PWR System April 08 2008.

Slides:



Advertisements
Similar presentations
ECE Electric Drives Topic 6: Voltage-Fed Converters Spring 2004.
Advertisements

HYDRAULICS & PNEUMATICS
NERC Lessons Learned Summary December NERC lessons learned published in December 2014 Three NERC lessons learned (LL) were published in December.
Power Supply System John Joseph LBNL Spectrometer Solenoid Test Plan Review Feb 17 th 2012.
E951 POWER SUPPLY 5/13/02 IOANNIS MARNERIS Brookhaven National Labs.
AIMS TF Upgrade Update 6/18/14. Breaker & Contactor Control & Status 6 Pulse Dual Converter with Lockout Controls (and Shoot-through Protection) Auto-Crowbar.
Chapter 7 Input Modules.
Oct. 10th 2006NSLS II Accelerator System Advisory Meeting SR-PS 1 NSLS II Accelerator System Advisory Committee Meeting October 10 – NSLS II Storage.
E951 POWER SUPPLY SAFETY REVIEW 9/06/02 IOANNIS MARNERIS Brookhaven National Labs.
Submitted By Ravi Raj Rajeev Kumar Vipul Batra. FUNCTIONS PERFORMED BY THE RELAY MADE 1.OVER VOLTAGE PROTECTION 2.OVERCURRENT PROTECTION.
NCSX NCSX CDR May 21-23, 2002 G. E. Oliaro Slide 1 WBS5 Central Instrumentation/Data Acquisition and Controls G. E. Oliaro for the Computer I&C, Network.
NCSX NCSX DCT Project Meeting Raki Slide 1 Electrical Power Systems (WBS 4) S. Ramakrishnan NCSX PROJECT – D TO C Site DC Transmission PROJECT MANAGEMENT.
Electro-Pneumatics Module 1
7/11/01Steven Hays E/E Support Page 1 NuMI Beam line Power Supplies  The supplies in the line is detailed  Main Ring Style…………………..…1  PEI/Transrex.
NCSX NCSX PWR.System PROTECTION REVIEW 02/22/08 S. Ramakrishnan Slide 1 Electrical Power Systems (WBS 4) NCSX PWR System PROTECTION – REVIEW February 22.
EMMA Electrical Engineering July 06 EE & PS Group EE & PS Group – EMMA 06
REQD FUTURE POWER SYSTEM CHANGES  Following additional work is required to be performed to restore full capability of the machine: 1. Provide power feed.
1 RWM P OWER FEED TO EACH COIL S. Ramakrishnan. 01/29/20102 RWM COILS Existing Status The Six RWM coils are grouped in pairs Each Pair is fed from one.
SC Project Review of NCSX WBS5 - Central Controls and Computing August 15-17, 2007 WBS5 Manager: Paul Sichta.
SC Project Review of NCSX, April 8-10, 2008 NCSX Heater Control System P. L. Goranson Work package 1270.
Princeton University Cost & Schedule Review of NCSX May 1-4, 2007 WBS5 – Central Controls and Computing Paul Sichta.
1 Copper Stabilizer Continuity Measurement Project CSCM Mini Review Powering Implementation H. Thiesen 30 November 2011.
Group 8 Dennis Pimentel Dale Tikasingh Emilio Fernandez Florida International University 20 April 2006 TDL POWER TDL.
SC Project Review of NCSX, April 8-10, 2008 NSCX Poloidal Field Coils Michael Kalish.
NCSX NCSX Preliminary Design Review ‒ October 7-9, 2003 G. Oliaro 1 G. Oliaro - WBS 5 Central Instrumentation/Data Acquisition and Controls Princeton Plasma.
PLANNING AND SCHEDULING
Electrical Distribution Training
NCSX NCSX CDR May S. Ramakrishnan Slide 1 Electrical Power Systems (WBS 4) S. Ramakrishnan NCSX CDR May
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
NSTX Centerstack Upgrade: initial discussions of the Machine Protection System (MPS) Robert Woolley 4 November 2009.
SC Project Review of NCSX, April 8-10, 2008 Central Controls and Computing WBS51 & 52 P. Sichta WBS5 Work Package Manager.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
Chapter 6 Voltage Regulators By En. Rosemizi Bin Abd Rahim EMT212 – Analog Electronic II.
SC Project Review of NCSX, April 8-10, 2008 NCSX Coil Services P.L. Goranson Work Package 161.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62)
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
SC Project Review of NCSX, April 8-10, 2008 NCSX Fueling and Vacuum Pumping Systems W. Blanchard WBS 21 and 22 Manager.
Work Control Center Overview. 2 Purpose of Work Control Center Allow engineering to concentrate on developing procedures and technologies Allow field.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
SmartMQn Motor Horner APG, LLC September 9, 2008.
NCSX CD-4/MIE block diagrams April 18, 2007 P. Sichta rev 0.
F. Dahlgren -SC Project Review of NCSX, April 8-10, 2008 PF, TF, & Trim Coil Supports (WBS-15) Core Base Support Structure (WBS-17) F. Dahlgren NCSX Coil.
EMT212 – Analog Electronic II
NCSX NCSX Trim Coil Peer Review 11/6/07 1 Tom Brown Art Brooks Raki Ramakrishnan Mike Kalish NCSX Trim Coil Peer Review.
1 BROOKHAVEN SCIENCE ASSOCIATES Power Supply Status George Ganetis Power Supply Status ASAC Review October 22-23, 2009.
SC Project Review of NCSX, April 8-10, 2008 Plant Design Integration, General Arrangement Drawings E. D. Perry.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
SC Project Review of NCSX, April 8-10, 2008 NCSX Machine Assembly E. D. Perry.
Princeton University Review of the NCSX Project, March 2008 WBS5 - Central Controls and Computing March 13,2008 WBS5 Manager: Paul Sichta.
Power Supply System Discussion Topics Steve Virostek / John Joseph LBNL Spectrometer Solenoid Workshop May 10, 2011.
Lianna Dicke MOTOR HARDWARE BREAKDOWN. Design Goals: Drive DC motor that draws 5 A maximum continuous current Voltage operation at 12 Volts (automotive)
TECHNICAL PAPER ON SIMULTANEOUS AC-DC POWER TRANSMISSION
Long Pulse Klystron Modulators SML (Stacked Multi-Level) topology
SC Project Review of NCSX, April 8-10, 2008 C. A. Gentile NCSX Startup (WBS 85) C.A.Gentile NCSX CD-4 Startup.
Chapter 6: Voltage Regulator
S A Griffiths CM42 June 2015 Electrical & Control.
Presented by Under the esteemed guidance of D.GANGADHAR REDDY, M. Tech. Asst. Prof., EEE Department UNIVERSAL COLLEGE OF ENGINEERING & TECHNOLOGY AUTO.
ARDUINO BASED UNDERGROUND CABLE FAULT DETECTION
Lecture 10: Programmable Logic Controllers
THREE PHASE FAULT ANALYSIS WITH AUTO RESET ON TEMPORARY FAULT AND PERMANENT TRIP OTHERWISE Submitted by:
Arduino Based Industrial appliances control system by decoding dual tone multi frequency signals on GSM / CDMA network. Submitted by:
Electrical & Control.
PC Mouse operated Electrical Load Control Using VB Application
Current Status of ITER I&C System as Integration Begins
INDUCTION MOTOR PROTECTION FOR SINGLE PHASING, OVERVOLTAGE AND OVER TEMPERATURE Submitted by:
the CERN Electrical network protection system
PLC’s Are ... Similar to a Microcontroller: Microprocessor Based
ESS Main Control Room & ICS Infrastructure
EUT 1040 Lecture 10: Programmable Logic Controllers Unrestricted.
Presentation transcript:

SC Project Review of NCSX, April 8-10, 2008 S. Ramakrishnan - 1 Electrical Power Systems (WBS 4) S. Ramakrishnan NCSX PWR System April

SC Project Review of NCSX, April 8-10, 2008 S. Ramakrishnan - 2 Content of Presentation Requirements Interfaces Design status or plans Procurement status or plans Cost and schedule estimates Staffing Risks and mitigation Responses to past review recommendations

SC Project Review of NCSX, April 8-10, 2008 S. Ramakrishnan - 3 ELECTRICAL POWER SYSTEM REQUIREMENTS Provide Source of all Electric Power for NCSX –All AC Power At all Distribution Voltage levels »4.16kV,480V, 208/120V »Includes Experimental AC Power »Includes AC Power to NB »Includes all Auxiliary AC Power up to Power Panels –All DC Experimental Power Provide DC power for stellarator coil systems –2 Modular, and 3 PF coil circuits »PS requirements based on Initial Ohmic Scenario »Clear path for future upgrades (other scenarios, flexibility) Provide Diagnostics support for Sensor cabling Grounding

SC Project Review of NCSX, April 8-10, 2008 S. Ramakrishnan - 4 AC SYSTEM- USE EXISTING C- SITE SYSTEM WITH NEW 480/120 SYSTEM FOR TEST CELL ESAT RECTIFIERS - USE EXISTING – 6 ROBICONS/ 1 PEI - RECONFIGURE - ASSIGN FOR NCSX LOADS AS NEEDED SDS- USE EXISTING UNITS IN TEST CELL BASEMENT WITH CHANGES REQUIRED - NEW PWR CABLING FROM SDS TO COILS HCS- PURCHASE AND INSTALL PLC. - NEW CABLING AS NEEDED MEASUREMENTS- USE SHUNTS/DCCTs IN PWR SUPPLIES - USE NEW FIBER OPTIC TRANSMITTERS CONTROLS - PLC, CABLING AS IS & MODIFIED PROTECTION - USE EXISTING WITH CHANGES & ADDITIONS - NEW CABLING AS NEEDED KIRKEYS- USE EXISTING WITH CHANGES REQUIREMENTS CONTD.

SC Project Review of NCSX, April 8-10, 2008 S. Ramakrishnan - 5 PPPL Site Plan NCSX C-Site Location NCSX Control Room Location C- Site Power Supplies

SC Project Review of NCSX, April 8-10, 2008 S. Ramakrishnan - 6 INTERFACES – SALIENT DETAILS ALL WBS –LIST OF LOADS TO BE FED WITH LOAD DETAILS –PHYSICAL LOCATION OF LOADS IN GENERAL ARRANGEMENT WBS1 (Stellarator Core) –CURRENT CAPABILITY & i^2*t CAPABILITY –OVERCURRENT & i^2*t SETTINGS TO TRIP –PERMISSIVE - PERMIT TO PS –TRIP COMMAND TO PS –PHYSICAL LOCATION OF COIL LEADS TERMINAL BOXES –GROUNDING PADS ON EACH CONTIGUOUS METALLIC STRUCTURE OF MACHINE TO ACCEEPT GROUNDING CABLES (NEMA LUGS) WBS 5 (Control I&C) –HARDWIRED INTERLOCK SYSTEM INTERFACE INCLUDES, PERMISSIVE, ARM/DISARM, ENABLE/DISABLE, E-STOP COMMAND TO WBS5 PLC TO OPEN AND CLOSE DISCONNECTS PRE-PROGRAMMED CURRENT PROFILE WBS 8 (TC Prep & Machine Assembly) PENETRATIONS AND FIRESEALS WILL BE REQUESTED BY WBS4.

SC Project Review of NCSX, April 8-10, 2008 S. Ramakrishnan - 7 DESIGN STATUS/PLANS  C-site Rectifier power supplies used for Coil circuits Six (6) Robicon Rectifier Supplies. Each of (2) 6- pulse, 2-quadrant converters in parallel - 12-pulse rectified DC output. One (1) PEI Rectifier Supply. Two 6-pulse rectifier bridges in parallel - 12-pulse DC output Sufficient power available for First Phase Future upgrades with D-Site Supplies Completed testing (Dummy Load) on six out of seven C-Site supplies

SC Project Review of NCSX, April 8-10, 2008 S. Ramakrishnan - 8 DESIGN STATUS/PLANS – Contd. Disconnect and grounding switches provided for each circuit Some of Existing cables used from Rectifier Supplies to Disconnects in Test Cell Basement New Cables (4/c- 500mcm, 600V) from “Disconnects” TO “Box of Coil Terminals” Current/ Voltage transducers will be provided Changeover to LTX possible by disconnecting Jumpers at top of Disconnects. Typical Circuit Arrangement

SC Project Review of NCSX, April 8-10, 2008 S. Ramakrishnan - 9 DESIGN STATUS/PLANS – Contd. 1st plasma & Magnetic Configuration CircuitPower Supply Current 1.5s / 180s VoltsPeak MW M1P1010kA200V2 M2 + M3P5-1 & 4 (parallel)10kA300V3 PF4 P5-2 in series with PEI5kA800V4 PF6 P5-35kA300V1.5 PF1aP2020kA500V10 Power Supplies Assignment

SC Project Review of NCSX, April 8-10, 2008 S. Ramakrishnan - 10 DESIGN STATUS/PLANS – Contd.  PS Control  PLC will be provided for Controls  Modern PLC based system –Additional interlocks as needed –Some protective features included  Current profile will be received from WBS4  PROTECTION  Coil / Pwr. Loop protection provided Overcurrent (Built-in the Pwr. Supplies) Ground fault Pulse duration & period (PDP) limit PS Control and Coil Protection

SC Project Review of NCSX, April 8-10, 2008 S. Ramakrishnan - 11 WBS BREAKDOWN & COST WBSSYSTEMM&SLABORTOTAL COST Design Maturity Design Complexity k$ 411 Auxiliary AC Power HighLow 431 C-site AC/DC Converters HighLow 441 Control & Interlocks MediumLow 442 Kirk Key Interlocks MediumLow 443 Real Time Control014 MediumLow 444 Instrumentation MediumLow 445 Coil Protection MediumLow 451 System Design0320 HighLow 452 Electrical Systems Support HighLow 453 System Testing HighLow

SC Project Review of NCSX, April 8-10, 2008 S. Ramakrishnan - 12 PROCUREMENT STATUS & PLANS MISC. SPARES FOR POWER SUPPLIES AS NEEDED POWER & CONTROL CABLES AS REQUIRED PER SCHEDULE POWER CABLE INSTALLATION CONTRACT WILL BE AWARDED PER SCHEDULE. PLC PER SCHEDULE KIRK KEY INTERLOCKS POWER PANELS, BUSBARS, DCCTS & SIGNAL LINKS WBS4 PROCUREMENT WILL START IN 2010.

SC Project Review of NCSX, April 8-10, 2008 S. Ramakrishnan - 13 SCHEDULE & COST/ STAFFING ALL TASKS WILL COMMENCE 10/01/08 AND FINISH BY 09/01/11 TOTAL IN-HOUSE LABOR (including overheads) –2255K$ TOTAL M&S (INCLUDES CONTRACT LABOR) –465K$ TOTAL ETC (May ) COST –2,720K$ SEE WAF FOR DETAILED BREAKDOWN  STAFFING  ALL PERSONNEL ARE PLANNED TO BE MULTI-TASKED BETWEEN PROJECTS  S.RAMAKRISHNAN, R. MARSALA, R. HATCHER, M. AWAD, E.BAKER, J. LAWSON, M. CROPPER, D. MCBRIDE, F.JONES, R. VAN KIRK, J. NELSON, TECH SHOP CREW, SUB- CONTRACTORS

SC Project Review of NCSX, April 8-10, 2008 S. Ramakrishnan - 14 RISK & MITIGATION Response to past Reviews Using existing C-site Rectifier supplies for First Plasma is cost-effective for powering NCSX coils –These supplies have been used for other machines earlier –Existing AC power distribution system at C-site will feed other loads & have been used for PBX/PLT/LTX Clear Upgrade path provided for final stage. Technical & cost risks ARE MINIMAL –Since this is standard electrical work –Cost is based on industry feedback & PPPL experience on past projects – Similar tasks in NSTX completed on time within budget –Is performed by experienced personnel who worked in similar tasks in NSTX/ LTX, TFTR & upgrades –Careful planning will mitigate schedule risk –Multitasking individuals have been properly planned. Other projects like NSTX also been successfully completed in this way. –Highest priority to Personnel Safety Response to past reviews: –The schedule has been advanced as recommended in the earlier review –A peer review on Protection has been completed. Twenty chits generated – being addressed

SC Project Review of NCSX, April 8-10, 2008 S. Ramakrishnan - 15 RESOURCE LOADED SCHEDULE

SC Project Review of NCSX, April 8-10, 2008 S. Ramakrishnan - 16 RESOURCE LOADED SCHEDULE –Contd.

SC Project Review of NCSX, April 8-10, 2008 S. Ramakrishnan - 17 RESOURCE LOADED SCHEDULE- Contd.

SC Project Review of NCSX, April 8-10, 2008 S. Ramakrishnan - 18 RESOURCE LOADED SCHEDULE – Contd.

SC Project Review of NCSX, April 8-10, 2008 S. Ramakrishnan - 19 RESOURCE LOADED SCHEDULE – Contd.

SC Project Review of NCSX, April 8-10, 2008 S. Ramakrishnan - 20 C- SITE SUPPLIES Back-up slides

SC Project Review of NCSX, April 8-10, 2008 S. Ramakrishnan - 21 C- SITE SUPPLIES Back-up slides

SC Project Review of NCSX, April 8-10, 2008 S. Ramakrishnan - 22 POWER SYSTEM BLOCK DIAGRAM Back-up slides

SC Project Review of NCSX, April 8-10, 2008 S. Ramakrishnan - 23 SIMPLIFIED SCHEMATIC Back-up slides

SC Project Review of NCSX, April 8-10, 2008 S. Ramakrishnan - 24 PROTECTION BLOCK DIAGRAM Back-up slides

SC Project Review of NCSX, April 8-10, 2008 S. Ramakrishnan - 25 UPGRADE PLAN Upgrade plan Logical Plan to proceed to Upgrade --D-Site supplies will be used –Will use D-Site supplies for SIX coil ckts –Two coil ckts will use C-Site supplies –ONE additional DC SUPPLY from C-Site, along with H-Bridges (SPA) to feed Trim Coils Back-up slides