CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, 2001 1 US CMS Tracker Outer Barrel (TOB) Silicon Project Tim Bolton (for Regina Demina)

Slides:



Advertisements
Similar presentations
M. Gilchriese US ATLAS Pixel Meeting July 18-19, 2002 UC Santa Cruz.
Advertisements

US CMS DOE/NSF Review: May 8-10, US CMS Cost & Schedule Mark Reichanadter US CMS Project Engineer DOE/NSF Review 8 May 2001.
Fermilab E906 Schedule Paul E. Reimer 20 June 2008.
US CMS Silicon Tracker Project – Breakout session Overview - DOE/NSF Review Brookhaven - May 20, Incandela 1 CMS Si Tracker: Breakout Session Dept.
Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
L2 L3 CMS tracker manager meeting June W. Beaumont Universiteit Antwerpen 6/10/01 l2l3UAjune2001b.sdd Module Long term test activities University.
MEG Review at Brookhaven, Feb 5, 2004 : CMS Si Tracker Project: J. Incandela 1 US CMS Silicon Tracker US LHC Detector Maintenance and Operations Evaluation.
US Tracker Production Meeting, March 8, 2005 J. Incandela 1 Slides for the US Si Tracker Weekly Production Meeting J. Incandela March 8, 2005.
US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 1 Slides for the US Si Tracker Institutional Group Leaders Meeting J. Incandela March.
TEC Production in the US J. Incandela Level 2 Manager US CMS Silicon Tracker Project October 8, 2003.
US CMS Silicon Tracker : Schedule J. Incandela University of California Santa Barbara US CMS Silicon Tracker Project Manager Fermilab PMG April 9, 2004.
DOE/NSF Review, BNL, May 20, Incandela1 CMS Tracker: Cost, Schedule, Planning and M&O Joe Incandela, University of California Santa Barbara US CMS.
US CMS Silicon Tracker – PAC Meeting – FNAL - Nov 3, Incandela 1 US CMS Tracker Outer Barrel (TOB) Silicon Project Joe Incandela Fermilab Level.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
Schedule & Plans Prof. J. Incandela US CMS Tracker Project Leader DOE Visit January 20, 2004.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
Slide 1Rod Production presented by Jim Lamb (UCSB)April 9, 2004 Rod Production Rod Production, April , presented by Jim Lamb (UCSB)
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
WBS 1.7: AFE II Project Cost and Schedule Alan Bross DZero Run IIb AFE II Director’s Review April 13, 2005.
RF Cavity / Coupling Coil Module
U.S. ATLAS Physics and Computing Budget and Schedule Review John Huth Harvard University DOE/NSF Review of U.S. ATLAS and CMS Computing Projects Brookhaven.
W. Freeman, D0 PMG 25-Feb-03 1 Run IIb Schedule Status u Schedule Status u Update on near-term equipment expenditures u Budgeting Update u Summary.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
August 2 and 3, 2010 Project Cost, Schedule, Risk and Contingency Jay Elias.
ATLAS Endcap Muon System WBS 3.5 Frank Taylor MIT M&O Request FY06 Toronto August 3, 2005 V1.1.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese U.S. ATLAS Review Revised Version November 29, 2000.
DOE/NSF Review May 8-10, US CMS US CMS M&O Planning Dan Green US CMS Project Manager DOE/NSF Lehman Review, May 8-10, 2001.
US CMS Silicon Tracker Project Regina Demina KSU Florida State University May 11, 2002.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
3.1.1 Optics, Optical Corrector, Mechanical Systems M. Johns, C. Claver.
1 W-band Module Production and Other Fermilab Contributions Proposed Significant Partnership in QUIET-II to the Fermilab PAC in November 2009 Modest Fermilab.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
Michel Della Negra/Karlsruhe May PbWO4 Crystals: Energy Resolution  m /m = 0.5 [  E1 /E 1   E2 /E 2  cot(  /2)  ] H   Simulation (100.
FVTX Wedge Assembly WBS , , , , , David Winter Columbia University FVTX Wedge Manager.
Rev of Run IIb, Nov 4-8, 2002, A. Bean 1 Silicon Management  Organization and Management  Schedule  Resources  Conclusions Alice Bean Univ. of Kansas.
P. Shanahan Nov 15, 2003 Page 1 MINOS WBS 2.3: Electronics, DAQ and Database Status Accomplishments since May review Near Detector Electronics production.
Tevatron BPM Upgrade Stephen Wolbers CD Accelerator Coordination Meeting September 21, 2004.
Brenna Flaugher Sept. 24 th Lehman Review1 Run IIB Silicon Upgrade: Cost and Schedule Lehman Review Sept. 24, 2002 Brenna Flaugher Run IIB Silicon Project.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
1 FVTX Monthly/Quarterly Report January 2009 Cost Summary Schedule Summary Current technical status of each WBS item.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
CMS Upgrade Workshop, FNAL, Nov 19-21, O.Prokofiev CMS Upgrade Workshop Updated ME4/2 chamber construction costs and prototype Status and plans.
CMS 1.Goal of the experiment CMS is a general purpose apparatus for LHC designed to study the physics of p-p collisions at the center-of- mass energy of.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Executive Committee, Toronto August 3, 2005 TRT Barrel WBS 1.2/3.2 Harold Ogren Indiana University.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
Organization, Proposal and Funding We hope to finish the revised proposal this week Need some cleanup I added a section on simulation needs – should be.
Preparation for silicon sensor arrival sensor delivery schedule aggressive expect 130 L2-L5 sensors each in July and August sensor lot/batch will likely.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
HADES collaboration meeting XXX, Lisbon, 7-10 October, 2015,
Camera PDR/CD1 Planning 19 September 2008
7th Belle II VXD Workshop, Prague
MICE Project in the US: Completion of Efforts
10/month is the present production rate 2 FTE + sporadic contributions
Rod adaptors for module tests Module positioning studies
FNAL Production Experience
Results from module testing
Management Breakout: MREFC Budget Summary Victor L
Wirebonding UCSB FNAL Machines
Presentation transcript:

CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, US CMS Tracker Outer Barrel (TOB) Silicon Project Tim Bolton (for Regina Demina) Kansas State University US CMS Silicon Tracker Project

CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, The Plan Scope has increased: Build ~6000 modules (all of the TOB modules) Place them in ~700 Rods Fly them to CERN and install & test them Build the TIB cylinders and ship them to Pisa Help install and commission the tracker Beyond construction project: Help maintain and operate the tracker Analyze data R&D for future tracker upgrades/replacements

CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, CMS tracker layout Outer barrel

CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, Outer Barrel Space Frame

CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, Outer Barrel Rods

CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, Rod installation

CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, Outer barrel geometry

CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, September Review Project files Resource loaded schedule WBS dictionary Cost estimates Basis for estimate of each task Contingency analysis Institutional responsibilities Task managers PMG review Sep (M. Crisler/chair) Recommendations received Responses returned Nov. 1, 2000 PAC review Nov. 4, 2000 Approved by Director Nov. 13, 2000

CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, Organization in US CMS

CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, Physicist Manpower

CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, Schedule Issues Schedule slips Hybrids & Frames are delayed FEDs for testing of large quantities of FE hybrids and modules are expected to be ready in Summer of 2002 Optical hybrids for assembly of modules into Rods will be available starting Summer 2002 Other critical items are performing better Gantries PC based test stands Probe stations Sensors

CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, US Gantry Preparations 1 st Gantry at FNAL Delivery was delayed 2 months. Expect to have it operational this month or next.

CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, Other US Activities Probe station at KSU is ready to go Waiting for first silicon which will arrive here soon Mock-up frames for training gantries Last minute request to our group to make these We completed 80 frames in early March

CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, Tracker I&C Tracker Outer Barrel (TOB) ~3.5 Million channels  Run 2 CDF and D0 combined CERN and USA only USA has to contribute heavily Final testing and repair of Rods at CERN Installation of Rods in the TOB support frame Testing of Rods in place System Ops: Software development, determination operational settings, calibration methods, database management, data quality assurance… CDF and D0 Experience A direct scaling implies many tens of physicists required for I&C and M&O. E.g. Continuous monitoring and analysis of data to catch and correct operational problems will require a lot of manpower Mitigating considerations TOB has relatively few module types and only 2 hybrid types. We expect there to be a remote control room and ready access to data in the USA.

CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, Planning Components Schedules & Updated Milestones Now know the sensor deliveries from tender Other tenders will occur this year for hybrids and frames Update milestones when all vendor schedules are known Plan is to have updated milestones in October 2001

CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, US Plans Preparations First gantry Complete installation this spring Some Module assembly this summer Study wirebonding with mechanical prototypes Resolve fixturing and module handling issues Prototype working modules by this Fall Install second gantry this Autumn Test stands Obtain a pc-based test station this Summer for testing modules made here. Prepare a preliminary burn-in station Full production Will not start until we see steady parts flow Need to prepare final burn-in and test facility Probable start of ramp-up is Spring/Summer 2002

CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, Capacity fall-back plan Capacity Issues Run2b Large overlap at SiDet appears unavoidable Contingency production line at UCSB Planning a 3 rd gantry to do assembly, also wirebonding and testing of ~2000 modules at UCSB Additional needs: 1 gantry, 1 high-speed wirebonder Purchase via startup funds and exchanges with CMS Probably no use of contingency required Gain additional experienced manpower 2-3 Faculty 2-3 silicon and 1 electronics engineers Senior researcher

CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, Summary & Conclusions Scope has increased Some components are delayed New schedule and milestones this October Currently estimate 6-8 month delay for start-up of full production Expect significant overlap with Run 2b 3 rd US gantry production line at UCSB ~30% of modules, relieve strain at SiDet, help make up lost time if necessary No production until component deliveries reach a steady, sustainable rate.

CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, Back up slides

CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, Costs (FY00$) 520k$ of manpower at FNAL is covered by the original barter agreement between FNAL and Int’l CMS

CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, Schedule at Review Main Production Period: ~ 8 months of explicit float

CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, Scheduled & Performed Work, Actual Work Costs Track Record Not really meaningful yet Short lever arm and recently revised schedule Increased manpower allocated to I&C CR: +225,038 FY01$

CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, I&C Manpower Estimates TOB Assembly period: 1/03 – 7/04 Two shifts per day and several parallel efforts Final test/repair of rods Installation/test of rods System software development/test US Contribution at CERN 5 FTE Physicists 1 Technician (Rod repair - disassembly and reassembly) ** In all cases, resources scheduled for scientists correspond to the incremental cost of residence at CERN (dislocation and travel). TOB commissioning: 7/04 – 9/30/05 3 shifts per day and several parallel efforts Debugging/Optimization Online ops, calibration Software development for monitoring data quality and catching problems. Offline analysis of data US contribution at CERN 7 FTE physicists 1 FTE technician

CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, SOW 01 - SiTrkr

CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, Current Schedule* *This is not official. It is our current conservative best guess.