PPGS N3/1: Durban - Pinetown. PPGS N2/25,26 DURBAN OUTER RING ROAD.

Slides:



Advertisements
Similar presentations
Field Orders on Construction Contracts Guidance Document CLC-8 May 13, 2013.
Advertisements

Monitoring and tender procedures for infrastructure projects Baltic Retreat 2013 Federal Department of Foreign Affairs FDFA Swiss Agency for Development.
By: MSMZ. Objective After completing this chapter, you will be able to: Explain 2 contract review stage List the objective of each stage of the contract.
NEC - Engineering and Construction Contract (ECC)
Construction Industry Development Board development through partnership Activating the Registers within Construction Procurement 1b.
FAR Part 44: Subcontracting Policies & Procedures February 5, 2012.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
GIS Cloud Computing A Multi-States’ Perspective Dick Clark NGAC Meeting March 18, 2011.
Marcy Mealy Procurement Specialist CDBG Program
Construction Industry Development Board development through partnership “Towards Uniform Conditions of Contract and Specifications in South Africa” South.
NBA Survey of the Australian Blood Sector Suppliers Summary of Responses and Feedback.
Customer Service & Customer Protection in MANSELL
ATMES Spring Meeting April 26-27, 2012 Myrtle Beach, South Carolina International Projects.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
The HA will reinforce the commitment of stakeholders to delivering quality housing at two levels - (a) At the strategic level, we will draw up a Quality.
© The McGraw-Hill Companies, Software Project Management 4th Edition Managing contracts Chapter 10.
Construction Industry Development Board development through partnership Construction Procurement documents 2c.
Spring 2008, King Saud University Engineering Administration Dr. Khalid Al-Gahtani 1 What is a Project? “A Project is a one-shot, time-limited, goal- directed,
1 Collaborating for competitive advantage: SMEs and the Supply Chain Achieving better SME involvement in Partnering Michael Thompson The TEAM FOCUS Group.
Construction Engineering 380 Professional Design Services Chapter 12 Appendix G.
Role of Procurement Audit in Improving Procurement Performance
1 – FILENAME South African Port Operations BEE SUPPLIER POLICY AND STRATEGY SOUTH AFRICAN PORT OPERATIONS.
> taking best practice to the world International Experience with Performance Based Maintenance Contracts.
INNOVATIVE PROCUREMENT The Next Steps Anthony Cachia Director (Operations) Department of Contracts.
ACE, ECCE & EFCA SEMINAR 21 October 2004 New EU Public Procurement Directive: EUROPEAN HARMONISATION OF PROCUREMENT PRACTICES IN THE SECTOR OF THE ENGINEERING.
SE513 Software Quality Assurance Lecture04: Contract Review Galin, SQA from Theory to Education Limited 2004.
New Procurement & Delivery Arrangements for the Schools’ Estate Presentation to Strategic Advisory Group 18 April 2005.
PROCUREMENT POST REVIEW OF WORLD BANK FINANCED PROJECTS IN INDIA October 11, 2007.
Ministry of Transport and Road Safety. Introduction Historical Approach to Contracting with Foreign Companies Current Policy and Requirements for Foreign.
Working together to deliver results Tony Wilson Policy Director Centre for Economic and Social Inclusion.
EQARF Applying EQARF Framework and Guidelines to the Development and Testing of Eduplan.
Chapter 5 Contract review Contract review process and stages
ROAD PAVEMENT FORUM RECENT EXPERIENCES ON PPGS PROJECTS HISTORY 1993 RPF (BMLC) PPGS Task Group Formed 1994CAPSA Resolution to promote concept 1996Initial.
Michalis Adamantiadis Transport Policy Adviser, SSATP SSATP Capacity Development Strategy Annual Meeting, December 2012.
CHAPTER 3 Pre-Project Components. 2 ESGD5125 SEM II 2009/2010 Dr. Samy Abu Naser Learning Objectives: To discuss: Contract Review Development and Quality.
EU-TURKEY CHAMBER FORUM PROJECT (ETCF) ETCF is funded by the European Union. 1 EU-TURKEY CHAMBER FORUM EU TURKEY CHAMBERS PARTNERSHİP GRANT SCHEME PROCUREMENT.
Specification & Quantities Estimating
CONSTRUCTION CONTRACTS PRIME CONTRACTS Format and Major Components CHAPTER - 4.
Object-oriented Analysis and Design Stages in a Software Project Requirements Writing Analysis Design Implementation System Integration and Testing Maintenance.
Public Procurement Seminar 16 th and 17 th June 2010 Savannah Hotel Fair Trading Commission Designing Tenders to Reduce Risk of Bid Rigging.
Report on the Challenges in the Planning and Procurement of Services for the Ceres and van Rhynsdorp Correctional Facilities Portfolio Committee on Correctional.
Principles for the regulation of e-assessment An update on developments Andrew Boyle Regulations and Standards division QCA.
Getting your specifications Right! Florence Gregg figpc ltd E:
Project Procurement Management
Contractor Alternate Design Serving the Public’s Best Interest.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
12.1 Plan Procurement: Introduction
1 © 2013 Protiviti Inc. All Rights Reserved. This document has been prepared for use by OOCEA’s management, audit committee, and board of directors. This.
A review after 5 years. Cease dependence on inspection to achieve quality... by building it into the product in the first instance.
1 SHE Requirements Presented by : Diane Maunatlala SS: COHS.
Factors affecting the development of Black and Minority Ethnic construction contractors and consultants within the social housing sector in Wales.
2016/06/211 Provision of Civil Works at Simmerpan Substation PS(PDP)2015/FM/15 Date : 10 July 2015.
Marketing to Main Contractors Winning Work from a Main Contractor Paul Clarkson Iain Flatters Construction Director Group Procurment Manager.
Building Capacity of SMEs for Participation in Public Procurement Draft Presentation for Training of Trainers June 2014.
S TANDARDS, CERTIFICATION AND ASSESSMENT C HAPTER 23 Dr. Ahmad F. Shubita.
Solicitation VA69D-16-R-0583 Rehab Renovation Pre-Proposal Conference June 22, :00am CDT NCO 12 Great Lakes Acquisition Center.
Framework for Introducing OPRC Christopher R. Bennett Sr. Transport Specialist EASTE.
Primary Steps for Achieving ISO Certification.
Construction Tender Process Tender steps between Client, Contractor and Subcontractor Dr A Kimmance.
ISO 37001: Anti-Bribery Management Systems Standard
Project Management – PTM712S
Software Quality Assurance
Module 4 Green Materials Procurement: Finding what you need and getting what you asked for.
Particular Conditions of Contract & Appendix to Tender
Drawings Introduction to FIDIC - Drawings -.
Evaluation Grids Evaluation Grids.
(Additional materials)
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
Particular Conditions of Contract & Appendix to Tender
Document Development for Metro Project: Performance-based Procurement Asphalt Overlay for Programmed Maintenance 17/01/2019.
Presentation transcript:

PPGS N3/1: Durban - Pinetown

PPGS N2/25,26 DURBAN OUTER RING ROAD

PPGS N2/25,26 DURBAN OUTER RING ROAD Pavement History Constructed: 1978 (northern last 3 km 1990) Pavement Structure:40 mmAS mmBS 150 mmC2/C3 150 mmC3/C4 150 mmC4 SG SubgradeG7 Overlay 1990/93: 40 mm AS

PPGS N2/25,26 DURBAN OUTER RING ROAD Traffic AADTTAADT± Area m 2 Section A (South) Section B (North)

PPGS N2/25,26 DURBAN OUTER RING ROAD

PPGS N2/25,26 DURBAN OUTER RING ROAD ROUND No 1

PPGS N2/25,26 DURBAN OUTER RING ROAD Tender Closure – October 2002 TendererPPGS*Non PPGS / Alternative AR26,5 m- BR28,3 m- CR74,3mR70,0 m* R71,8 m* R72,9 m R75,3 m D-R58,9 m* R60,8 m* R63,2 m*

PPGS SANRAL / SAFCEC WORKSHOP 5 FEBRUARY PARTICPANTS

PPGS Workshop Experiences with PPGS Risk sharing Quality Innovation and Product Certification Tender Procedures Procurement Partnering and subcontracting Performance guarantees Scope of PPGS Recommendations

PPGS Workshop Experiences with PPGS > 10 Projects to date. Generally successful BOT projects ( a form of PPGS?) tend to have lighter pavement structures than conventional. Money/risk? Whole life cost of PPGS = conventional projects. Could be less due to greater focus on quality and reduced cost during maintenance period? In general, little innovation observed on PPGS projects CAPSA 94 resolution: PPGS should be implemented incrementally

PPGS Workshop Risk Sharing Need to properly understand and quantify the risk profile. If known, more confidence to tender Industry perception that only high risk projects go PPGS SANRAL approach – generally low risk (existing pavement condition) Substantial number of variables may need to be controlled: difficult to quantify

PPGS Workshop Quality Contractor responsible for quality on conventional projects – more so on PPGS (incentive?) Contractor be left to decide how to do the work and not be directed by the employer. Professional partner to offer him guidance PPGS is all about building better quality into the works Control of sub-contractors and suppliers! ISO 9000 often a mere paper exercise? Contractors tendered quality plans must be enforced during project

PPGS Workshop Innovation and Product Certification Employers should not be too prescriptive and refrain from presenting benchmark designs, which could impede innovation Rather provide employers cost estimate Employers should refrain from specifying a product (e.g. single seal) as well as performance requirements? Product certification increases employers confidence? Although product certification is desirable, some problems at this stage (time /cost/market size)

PPGS Workshop Tender Procedures The purpose and objectives of any PPGS project must be made clear to tenderers To date, insufficient time for tendering on PPGS projects (6 weeks minimum) Need for a pre-site meeting to clarify technical issues? Volume 6 contract document should include all relevant information in Detailed Design Report Escalation and Rise and Fall on guarantee sum should either be part of risk (built in PPGS premium) or Contractor should specify and request in his tender

PPGS Workshop Procurement Concern that PPGS not fully aligned with current procurement policies? Does not necessarily fall outside procurement directives but may have a cost premium PPGS should be no exception to the promotion of capacity building, transformation and empowerment in the industry

PPGS Workshop Partnering and subcontracting Good working relationship and partnerships are considered essential Supplier to vet the application of his product? Sub contractor/Suppliers to participate in supply of guarantees?

PPGS Workshop Performance Guarantees Based on previous experience, premiums for PPGS range between 3-4% Size of premiums make PPGS a viable alternative to conventional? Insurance companies partake in risk assessment Reasonable performance criteria should be set over time. Employers do not expect a “new” road at end of guarantee period Obtaining guarantees is no longer a problem ! May however be difficult if period exceeds 8 years?

PPGS Workshop Scope of PPGS May need to redefine PPGS level 2 e.g. Level 2A – limited to surfacings Level 2B – includes reworking of support layers (may require longer guarantee periods) If risk profile is too high and cannot be adequately quantified, pricing of risk becomes impossible. Very long guarantee periods (20 years) not considered feasible

PPGS Workshop Scope of PPGS Consultants noted that pavement engineering is not an exact science and very little can be guaranteed (including traffic). Design engineers must however include design assumptions, which will be evaluated by employer

PPGS Workshop Recommendations PPGS requires a longer tender period All available info must be supplied to contractors All information should be supplied 2 weeks prior to site insp. Technical meeting desirable before or during tender period SANRAL to investigate accommodation of CPA & rise and fall SANRAL should look at wider spread (low/high risk) projects Further work needed to better understand and predict risks associated with PPGS projects

General feeling Contractors are generally supportive of PPGS (depending on risks). Favours alternative products and quality conscious contractors PPGS Workshop

PPGS N2/25,26 DURBAN OUTER RING ROAD ROUND No 2

PPGS N2/25,26 DURBAN OUTER RING ROAD Tender closure – March 2003 TendererPPGS*Non PPGS / Alternative AR17,6 m- BR77,9 m- CR124,9 mR79,6 m R82,6 m R67,0 m R66,7 m EstimateR69,5 m

PPGS Judges decision: Is it a slip? Is it a TKO? Is it a KO?