ACADs (08-006) Covered Keywords Turbine Auxiliaries, Mechanical Systems, Gates, Cranes and Hoists. Description Supporting Material 1.3.4.55.2.4.5.

Slides:



Advertisements
Similar presentations
Technical Committees – the Brains of ASHRAE Section 1.0 — Fundamentals and General.
Advertisements

Circulating Water System
Cessna Single Engine Aircraft Maintenance
Case of HPP Blanca, Slovenia Jernej Mazij, Litostroj Power d. o. o
Auxiliary Power Plant Fundamentals
Power Plant Construction and QA/QC Section 5.2 – Combustion Control and Burner Management Engineering Technology Division.
UL/FM Fire Pump Systems Lunch & Learn 04/18/05
HYDRO POWER PLANT BASIC TERMS, TYPES and COMPONENTS
Cairo University Faculty of Engineering Petrochemicals Engineering Plant Layout May 2010.
GNI0003H PP1 Loop Trainer. GNI0003H PP2 Reason for Study Because the Loop Trainer gives instructors the capability to control water flow, pressure and.
FGD-Limestone Grinding Plants General Technical Training MJ /
Power Plant Construction and QA/QC Section 2.4– Boiler Auxiliaries
Internal Combustion Engines. Engines External combustion engine Internal combustion engine Steam engine Gas turbine engine Steam engine Gas turbine engine.
Construction Materials MasterFormat Divisions.  A standard for organizing specifications  Used in the U.S. and Canada  Product of Construction Specifications.
HYDRO-ELECTRIC POWER PLANT Prepared by SREEJITH K. & NICE MENACHERY APME APME JEC JEC.
Micro-hydro Power Alvin Chan, Benjamin Garber, Lance Stratton, Philip Pulitzer Advisor: G Flo.
Marine Engine Systems Merchant Marine Training Centre.
ACADs (08-006) Covered Keywords Demineralization, reverse osmosis, evaporation, distillation, oil separation, condensate polishing, boiler protection.
POWER PLANT.
Cooling Towers and Air Cooled Condensers
TURBOCHARGERS & SUPERCHARGERS
ACADs (08-006) Covered Keywords Air compressors, aftercooler, afterfilter, moisture separator airflow. Description Supporting Material
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/2 Design Geoff Vaughan University of Central Lancashire,
Engineering Technology Division
First Considerations on CLIC Cooling System Ch. Martel, J. Inigo-Golfin TS/CV.
1 GENERATION TECHNOLOGIES -- Bhanu Bhushan -- (April, 2011)
CHAPTER 4 CPB 20004: Plant Utility n Maintenance
Power Plant Construction and QA/QC Section 3.5 & 3.6 – Hydraulic Turbines & Reciprocating Engines Engineering Technology Division.
Given a P&ID, the learner will be able to identify the purpose of that P&ID according to their student guide. – Given a P&ID, locate the title block and.
Power Plant Construction and QA/QC Section 7.4 – Hydroelectric Generators, Transformers and Controls Engineering Technology Division.
Hydro electric (Hydel) Power Plant
Power Plant Construction and QA/QC Section 7.2 – Dams, Spillways, Water Conductors and Power Houses Engineering Technology Division.
Hydro-Electric Power Station Lecture No: 4. “”A generating station which utilizes the potential energy of water at a high level for the generation of.
Auxiliary Power Supply System By CGS Gunasekara. Content Why auxiliary supply is needed ? Equipments supplied through auxillary. Modes of operation. Demonstration.
Power Plant Construction and QA/QC Section 1.3– Oil and Natural Gas Engineering Technology Division.
Power Plant Construction and QA/QC Section General Features of Hydro Electric Project Engineering Technology Division.
Power Plant Construction and QA/QC Section 1.5– Hydroelectric Energy
Head works.
1 GENERATION TECHNOLOGIES -- Bhanu Bhushan -- (April, 2011)
Power Plant Construction and QA/QC Section 4.4 – In-Plant Electrical Distribution Engineering Technology Division.
Power Plant Construction and QA/QC Section 4.3 – Electrical Interconnections Engineering Technology Division.
LESSON 16 ENGINE OPERATION
Power Plant Construction and QA/QC Section 9.1 – Environmental Legislation and Regulation Engineering Technology Division.
Power Plant Construction and QA/QC Section 8.3 – Wind Energy Technology Engineering Technology Division.
Power Plant Construction and QA/QC Section 5.3 – Turbine and Engine Governors Engineering Technology Division.
Hospitality Operations
Power Plant Construction and QA/QC Section 9.5 – Power Plant Noise and its Control Engineering Technology Division.
Power System Electric power systems are real-time energy delivery systems. Real time means that power is generated, transported, and supplied the moment.
PXIE Cryogenics Concept Arkadiy Klebaner Session 5 / WG1 (CW Linac and PXIE) October 26 th, 2011.
ESKOM - MWP NEW ENERGY CENTRE Mechanical Installation 16 April 2014.
ROLL NO.ENROLLMENT NO.NAME MAKVANA DISHA R. GUIDED BY : PROF. R. JADAV.
What is MasterFormat?. “MasterFormat is a master list of numbers and subject titles classified by work results or construction practices for organizing.
IN THE NAME OF ALLAH, THE BENEFICENT, THE MERCIFUL
UTILITIES MANAGEMENT.
HYDRO ELECTRIC POWER PLANT
Engineering Technology Division
Engineering Technology Division
Internal Combustion Engines – The Diesel
HASMUKH GOSWAMI COLLEGE OF ENGINEERING
Engineering Technology Division
HYDRO ELECTRIC POWER PLANTS BY Prabhakaran.T AP/MECH
Engineering Technology Division
Section 1.0 — Fundamentals and General
Back Next.
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
Ch. 10 Heat Transfer in Engines
Engineering Technology Division
Engineering Technology Division
Engineering Technology Division
Back Next.
Presentation transcript:

ACADs (08-006) Covered Keywords Turbine Auxiliaries, Mechanical Systems, Gates, Cranes and Hoists. Description Supporting Material

Power Plant Construction and QA/QC Section 7.3 – Auxiliary Mechanical Equipment Engineering Technology Division

3 Overview Section 7.3 – Auxiliary Mechanical Equipment Hydroelectric Plant Auxiliaries Turbine Auxiliaries Mechanical Systems Gates Cranes and Hoists

4 Turbine Auxiliaries Section 7.3 – Auxiliary Mechanical Equipment Most Turbines Operate at Constant Speed Speed Following Newer Units are Capable of Variable Speed Load or Speed Following Load Following when beneficial Governor controls the inlet gate – 10% change Turbine Inlet Valve Shut for Emergency or Maintenance Spherical > 500 ft head Butterfly < 500 ft head

5 Inlet Valves Section 7.3 – Auxiliary Mechanical Equipment

6 Mechanical Systems Section 7.3 – Auxiliary Mechanical Equipment Cooling Water - oil Lubricating - bearings Compressed Air - controls Fire Protection Dewatering and Filling - maintenance Drainage - protection HVAC (heating, ventilation and air conditioning) Oil Storage and Purification Potable Water - drinking Sanitary – bathrooms, sinks

7 Valves and Gates Section 7.3 – Auxiliary Mechanical Equipment Trash Racks Intake Gate Maintenance Bulkhead Draft Tube Gate Spillway Gate

8 Valves and Gates Section 7.3 – Auxiliary Mechanical Equipment

9 Cranes and Hoists Section 7.3 – Auxiliary Mechanical Equipment

10 Questions? Section 7.3 – Auxiliary Mechanical Equipment