National Aeronautics and Space Administration John F. Kennedy Space Center SPACEPORT ENGINEERING AND TECHNOLOGY 1 NASA TECHNICAL STANDARDS WORKING GROUP.

Slides:



Advertisements
Similar presentations
1 Accredited Standards Committee C63 ® - EMC Subcommittee 8 Bob DeLisi / Stephen Berger Chair / Vice-Chair
Advertisements

Rider 8 Technical Workgroup Development. Introduction - Rider 8 Program for Ozone 74 th State Legislative Session authorized and budgeted to assist areas.
Launch Vehicle International Standards and Best Practices A Report on ISO Standards Proposals offered by China Frederick A. Slane ISO TC20/SC14 US Head.
USING NASA QUALITY STANDARDS NASA Academy of Aerospace (AAQ) Quality Mini-Workshop Ken Crane Quality Engineering Technical Discipline Team Lead NASA SAFETY.
Division of Local Assistance Office of Special & Discretionary Programs December 2, 2010.
1 CFR CHAPTER I AND 1 CFR PART 51 REGULATORY UPDATE.
ISO Current status of development
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Scott Williams 1 GLAST Large Area Telescope: Instrument Operations Center Scott.
National Aeronautics and Space Administration Commercial Crew Initiative Overview and Status to the COMSTAC Philip McAlister NASA Exploration Systems Mission.
THE HYDROGEN SAFETY PROGRAM OF THE U.S. DEPARTMENT OF ENERGY Patrick Davis, U.S. Department of Energy Bruce Kinzey, Pacific Northwest National Laboratory.
PMSS Final SOW May 22 nd, Statement of Work 2 GLENN RESEARCH CENTER PROJECT MANAGEMENT SUPPORT SERVICES (PMSS) The Contractor shall provide expert.
Federal Aviation Administration CLEEN (Continuous Lower Energy, Emissions and Noise) Program Technologies Development AIAA Aerospace Sciences Meeting Jim.
Tribal Benefits from State Implementation Plan (SIP) Process Involvement Rosanne Sanchez New Mexico Environment Department Air Quality Bureau.
NASA Technical Standards Program 5/7/20030 May 7, 2003 Paul S. Gill, Manager NASA Technical Standards Program Office NASA Technical.
NASA-KSC Safety and Health Presentation March 18,
HARC Meeting March 4, 2010 Status of EPA Activities Presentation to AIG Environmental, May 19, 2005.
Presented to: Aerospace Control and Guidance Systems Committee By: Stan Pszczolkowski, Manager, System Analysis Team Date: October 11, 2006 Federal Aviation.
Program Goals And Authority
NASA Technical Standards Working Group Presentation to White Sands Test Facility Dr. George Alcorn Goddard Space Flight Center GSFC.
EARTO – working group on quality issues – 2 nd session Anneli Karttunen, Quality Manager VTT Technical Research Centre of Finland This presentation.
NASA PREFERRED TECHNICAL STANDARDS PUBLISHED
Review Work Plan for 2008 Karin Kindbom (IVL) and Martin Adams (EEA) Co-chairs of the Expert Panel on Review 8 th Joint TFEIP/EIONET meeting October.
1 Planning of the Stage 3 In-depth Review 2008 Joint TFEIP/EIONET air emissions meeting Tallinn, May 2008 Martin Adams Expert Panel on Review European.
Mandatory Technical Standards Engineering Management Board Goddard Space Flight Center July 10, 2003 Updated October 7, 2003 HQ/Code AE R. Weinstein.
NASA TECHNICAL STANDARDS PROGRAM NASA TECHNICAL STANDARDS PROGRAM 1 Dryden Flight Research Center Presentation to NASA Technical.
Commitment Process Presented by Edward B. Luers October 2008 Interplanetary Network Directorate Deep Space Network.
National Aeronautics and Space Administration John F. Kennedy Space Center SPACEPORT ENGINEERING AND TECHNOLOGY 1 NASA TECHNICAL STANDARDS WORKING GROUP.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
Federal Aviation Administration Commercial Space Transportation Human Space Flight Occupant Safety Telecon Telecon 8 – Communications and Commanding Best.
Surveillance Planning Team Initial Team Meeting January 9-10 NASA Headquarters Team Introduction Revision A Tom Whitmeyer - OSMA Jeff Cullen - Procurement.
1 NUOPC National Unified Operational Prediction Capability 1 Review Committee for Operational Processing Centers National Unified Operational Prediction.
Professionalizing Mobility Management: Developing Standards and Competencies Julie Dupree, Easter Seals Association of Travel Instruction Conference August.
Configuration Control
1 NASA In Transition Presented to the Aerospace Control and Guidance Systems Committee Meeting No. 96 Harbour Town Resort Hilton Head, SC October 19, 2005.
API SC6 Valves and Wellhead Equipment TG3 – Wellhead Design in Standards and TRs Kenneth Young 14 June 2012 SC6 Summer Meeting - Westminster, CO1.
Protecting the Public, Astronauts and Pilots, the NASA Workforce, and High-Value Equipment and Property Mission Success Starts With Safety The NASA Safety.
NASA Technical Standards In Work WSTF Summary Quad Charts June, 2007 (Sponsored by NASA Chief Engineer)
1 WUSM RA Forum September 2007 Grants & Contracts.
Constellation Space Transportation Planning Office July 30, 2009.
Male’ Declaration Male’ Declaration Work Programme for 2010 by Secretariat UNEP.
Florida Space Transportation Infrastructure Planning Mark Bontrager Vice President, Spaceport Operations.
ISO Current status of development ​ ​ ISO development process ​1​1.
1 ISO/PC 283/N 197 ISO Current status of development November 2015.
TIA IPR Standing Committee Report to TIA Technical Committee “Normative References and IPR” October 21, 2005 Paul Vishny, Chair Dan Bart, TIA.
CISPR/TC77 Joint Task Force Activity Update ACEC meeting in Paris, June 2006 Prepared by Donald N. Heirman Chairman CISPR Subcommittee A.
COMSTAC Launch Operations Support Working Group May 17, 2007 Jim Ball Spaceport Development Manager NASA Kennedy Space Center Kennedy Space Center Spaceport.
Technology Services – National Institute of Standards and Technology Implementing the National Technology Transfer and Advancement Act in the Federal Government.
Art Nelson, Jr.AMS-02 Technical Interchange Meeting - JSC - January Ground Safety Status.
1 Special Information Session on USEPA’s Carbon Rules & Clean Air Act Section 111 North Carolina Division of Air Quality Special Information Session on.
Some Public Policy Committee (PPC) Discussion Notes Public Policy Committee Meeting 5 January 2010 Phil Hattis.
1 Review of Draft FY2009 Unified Planning Work Program (UPWP) Ronald F. Kirby Director, Department of Transportation Planning National Capital Region Transportation.
Federal Aviation Administration AST International Outreach Update and UN COPUOS Long Term Sustainability of Outer Space – Expert Group B (Debris) John.
LOG204 (DL) Configuration Management Bruce Hatlem Logistics Functional IPT June 26, 2007.
© National Fire Protection Association. All rights reserved. NFPA Consensus Standards at Work What is NFPA 59A and how does it apply April 12, 2016 Guy.
Planning Commission Study Session: Preferred Plan July 23, 2015.
Ted Biess NASA HQ Environmental Mgt Div Scott Motter Northrop Grumman NASA Risk Management Aligned Environmental Management System (RM-A-EMS)
PIP-II Environment, Safety, Health & Quality Assurance Strategy John Anderson Jr. DOE Independent Project Review of PIP-II 16 June 2015.
Welcome to Workforce 3 One U.S. Department of Labor Employment and Training Administration Webinar Date: August 3, 2015 Presented by: U.S. Department of.
Page © ASME 2016 Module B – Process B8a. US TAG to International Standards Organization (ISO) Standards Development Standards and Certification Training.
Kennedy Space Center Connecting Mid-Atlantic Space Grants with Spaceport and Range Technology and Science Thrust Areas Michael Freeman, PhD
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
Quarterly Meeting November 30, 2016
ISO TC 108 SC3 Liaison to CCAUV
Implementing the Transportation/Land Use Connection Program
Department of Environmental Quality
Progress in Replacing Halons in Civil Aviation
ApprenticeshipNC Regional Collaboration and Expansion Project
Aerospace Systems Integration Engineering Panel
DRG Implementation Overview
Step 3. Initiate Proposal
Presentation transcript:

National Aeronautics and Space Administration John F. Kennedy Space Center SPACEPORT ENGINEERING AND TECHNOLOGY 1 NASA TECHNICAL STANDARDS WORKING GROUP STATUS OF STANDARDS PROGRAM AND ACTIVITIES Larry L. Schultz Spaceport Engineering & Technology October 16, 2003

National Aeronautics and Space Administration John F. Kennedy Space Center SPACEPORT ENGINEERING AND TECHNOLOGY NASA Technical Standards Working Group 2 Status of Actions n Reviewed 27 proposed standards projects from the MSFC program office for the Center n NASA STD-6004 “Stress Corrosion Cracking” review Provided approval letter in June 2003 n NASA STD-7002A “Payload Test Requirements” review Provided Draft 1 approval letter in March 2003, Draft 2 in June 2003 n Effectiveness Assessment Action No. 79 Response provided in August and September 2003 n NASA-STD-5012 “Strength & Life Assessment of Engines” Provided approval letter in September 2003 n NASA-HDBK-5010, "Fracture Control Implementation Handbook For Payloads, Experiments, and Similar Hardware" Provided approval letter in September 2003

National Aeronautics and Space Administration John F. Kennedy Space Center SPACEPORT ENGINEERING AND TECHNOLOGY NASA Technical Standards Working Group 3 NASA Standards in Development n Coating Standard – Project Leader – Lou MacDowell Qualified Suppliers list needs updating n GSE Design Standard – Project Leader – Larry Schultz OSP requested an updated standard Draft revision given to OSP for review prior to official update n GSE Welding Standard – Project Leader - Scott Murray Standard will be up for revalidation in 2004 Draft revision sent to the program office n Vibro-acoustic handbook – Project Leader Ravi Margasahayam Comments incorporated by contractor personnel Updated draft sent to MSFC in June 6, 2003 Updated draft under review by the Agency n AP2 Handbook – Project Leader Chris Brown, AP2 Program Office Project Leader to incorporate portions of the handbook into a new AP2 NPG Completion will be delayed until after the NPG is complete

National Aeronautics and Space Administration John F. Kennedy Space Center SPACEPORT ENGINEERING AND TECHNOLOGY NASA Technical Standards Working Group 4 VCS Standards in Development n ISO standards published ISO 14625, GSE ISO 14951, Parts 1 thru 13 - Fluid characteristics ISO 15389, Flight to ground umbilical ISO 14302, Space systems -- EMC ISO 17399, Space systems -- Man Systems Integration n ISO standards in Draft International stage ISO 14952, Parts 1 thru 6 – Surface Cleanliness of fluid systems ISO 15859, Space systems -- Fluid Characteristics, sampling and test methods, 13 Parts ISO 16458, Unmanned Spacecraft Transportation n ISO standards in working or committee draft stage ISO , -6, -7, Space systems – Material Flammability ISO thru –4, Space systems - Oxygen safety Amendment to ISO Flight to ground umbilicals

National Aeronautics and Space Administration John F. Kennedy Space Center SPACEPORT ENGINEERING AND TECHNOLOGY NASA Technical Standards Working Group 5 VCS Standards in Development n ISO CD , Safety Requirements - Flight Safety Systems n ISO WD 23041, Unmanned SC Operational Procedures n ISO CD & -2, Stress Corrosion Cracking n ISO 15860, Gas Contamination, Field Measuring Methods n ISO 22108, Non Flight Items - Identification & Control n AWS D17.1, Aerospace welding n ANSI/NCSL Z540.1, General Requirements for Competence of Calibration Laboratories n NFPA Standard on Clean Agent Fire Extinguishing Systems n AP-42, Compilation of Air Pollutant Emission Factors, Fifth Edition, Volume I: Stationary Point and Area Sources United Nations Environment Program Halon Technical Options Committee (UNEP HTOC) Under directions from the Parties to the Montreal Protocol (MP), the HTOC developed and released the Halons Technical Options Committee Assessment Report.

National Aeronautics and Space Administration John F. Kennedy Space Center SPACEPORT ENGINEERING AND TECHNOLOGY NASA Technical Standards Working Group 6 VCS Standards in Development n ANSI/ASAE EP411.4, Guidelines for Measuring and Reporting Environmental Parameters for Plant Experiments in Growth Chambers n ASTM D , Compatibility of Materials With Liquid Oxygen (Impact Sensitivity Threshold and Pass) n AIAA XXXX, Architecture of Small, Self-Propelled, Autonomous Robots n ISO New Work Items Update of ISO – GSE Orbital Debris Aerospace Welding

National Aeronautics and Space Administration John F. Kennedy Space Center SPACEPORT ENGINEERING AND TECHNOLOGY NASA Technical Standards Working Group 7 SDO and VCS Development Participation n Personnel participation 13 KSC personnel participating in SDOs Standard Development Organizations – 12 F ISO F ASTM F SAE F ASME F AIAA F NCSL F NACE F AWS F NFPA F ASM F ASAE F ASH

National Aeronautics and Space Administration John F. Kennedy Space Center SPACEPORT ENGINEERING AND TECHNOLOGY NASA Technical Standards Working Group 8 Program Awareness/Issues/Initiatives n Hosted a NASA Technical Standards Program Awareness session at KSC – Attendance 50 personnel

National Aeronautics and Space Administration John F. Kennedy Space Center SPACEPORT ENGINEERING AND TECHNOLOGY NASA Technical Standards Working Group 9 Center Review Processes  Standard Proposal Review  Each proposed standard is reviewed by the Center Technical Standards POC for Center expertise.  If expertise is at the Center, the proposal is assigned to a Center subject matter expert for review and comment using the Technical Standards webpage forwarding capability.  Draft Standard Review  Each draft standard is reviewed by the Center standards POC for Center expertise.  If expertise is at the Center, the draft standard is assigned to a Center organization or expert for review and comment using the KAITS system.  A Center concurrence or approval letter with or without comments is prepared and signed by the KSC SMO.

National Aeronautics and Space Administration John F. Kennedy Space Center SPACEPORT ENGINEERING AND TECHNOLOGY NASA Technical Standards Working Group 10 Program Resources n Technical Standards Program participation – XX FY 03 – LH, 0.90 FTE FY 03 – 24 KSC C.S. personnel participating in the program FY CS labor cost - $ 81, FY 04 – POP input 1 FTE for UPN n Program funding FY 03 Travel Budget $55K FY 03 NOA $60K FY 03 Obligations $ 96.3K FY 03 4 th Quarter Cum Cost $ 68,252 FY 04 Travel Budget $55K FY 04 NOA $60K