GOS Economic Model (GEM) Overview Uses the same underlying simulation software (Stella) which was used in developing TNM Economic Model (NB-Sim) Provides.

Slides:



Advertisements
Similar presentations
Portfolio Management, according to Office of Management and Budget (OMB) Circular A-16 Supplemental Guidance, is the coordination of Federal geospatial.
Advertisements

Ninth Lecture Hour 8:30 – 9:20 pm, Thursday, September 13
NWS Support for a National Mesonet Network of Weather & Climate Observing Networks (NOWCON) Don Berchoff Director, Office of Science and Technology NOAA.
4. Project Investment Decision-Making
Action Logic Modelling Logic Models communicate a vision for an intervention as a solution to a public health nutrition (PHN) problem to:  funding agencies,
Information and Decision Support Systems
1 Rural Broadband Network Development Analytical Model Overview General Overview of Key Elements of an Analytical Model to support subsidized deployment.
1 Chapter 12: Decision-Support Systems for Supply Chain Management CASE: Supply Chain Management Smooths Production Flow Prepared by Hoon Lee Date on 14.
Benchmarking as a management tool for continuous improvement in public services u Presentation to Ministry of Culture of the Russian Federation u Peter.
Requirements Specification
Model Building and Simulation Chapter 43 Research Methodologies.
Needs Assessment April 5 th 2006 Geog 463: GIS Workshop.
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Information and Decision Support Systems
System Engineering Instructor: Dr. Jerry Gao. System Engineering Jerry Gao, Ph.D. Jan System Engineering Hierarchy - System Modeling - Information.
Certified Business Process Professional (CBPP®)
Certified Business Process Professional (CBPP®) Exam Overview
Future Directions Strategic Communications Plan FCDC/GOS/TNM FGDC Coordination Working Group January 11, 2005.
Enterprise Architecture
Privileged and Confidential Strategic Approach to Asset Management Presented to October Urban Water Council Regional Seminar.
Patrick DeCorla-Souza, P3 Program Manager, FHWA
Project Proposals Selecting the right project. Aggregate Project Plan Minor Process change Extensive Process change Minor Process change Extensive Process.
Microsoft ® Office Project Portfolio Server 2007.
Copyright 2001 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter 1 The Systems.
What is Business Analysis Planning & Monitoring?
2014 AmeriCorps External Reviewer Training
CENTRE FOR HEALTH ECONOMICS AND DEVELOPEMNT ESTIMATING ECONOMIC AND FISCAL IMPACT OF HEALTH AND NON HEALTH EXPENDITURE FROM THE NATIONAL HEALTH BILL Kenneth.
Database System Development Lifecycle © Pearson Education Limited 1995, 2005.
Performance Measurement and Analysis for Health Organizations
Chapter 8 Architecture Analysis. 8 – Architecture Analysis 8.1 Analysis Techniques 8.2 Quantitative Analysis  Performance Views  Performance.
Business Analysis and Essential Competencies
NSDI Future Directions Initiative Towards a National Geospatial Strategy and Implementation Plan Ivan B. DeLoatch FGDC Staff Director.
Enterprise GIS Planning and Framework Jennifer Reek GIS Coordinator City of Brookfield, WI.
December 14, 2011/Office of the NIH CIO Operational Analysis – What Does It Mean To The Project Manager? NIH Project Management Community of Excellence.
1 PROJECT EVALUATION IT’S ALL ABOUT STUDENTS. 2 In partnership, we help America’s students stay in school and graduate by: Reducing gaps in college access.
Needs Assessment Geog 469 GIS Workshop. Outline What is the rationale behind needs assessment? What are the benefits of GIS projects? What is a hierarchical.
Commissioning Self Analysis and Planning Exercise activity sheets.
United States Department of Agriculture Food Safety and Inspection Service 1 National Advisory Committee on Meat and Poultry Inspection August 8-9, 2007.
McGraw-Hill/Irwin Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 3 Identification and Selection of Development Projects.
Lecture 7: Requirements Engineering
Information Systems Engineering. Lecture Outline Information Systems Architecture Information System Architecture components Information Engineering Phases.
Chapter 10 Analysis and Design Discipline. 2 Purpose The purpose is to translate the requirements into a specification that describes how to implement.
+ Chapter 9: Management of Business Intelligence © Sabherwal & Becerra-Fernandez.
Principles of Information Systems, Sixth Edition Information and Decision Support Systems Chapter 10.
Chapter McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Risk and Capital Budgeting 13.
European Commission Joint Evaluation Unit common to EuropeAid, Relex and Development Methodology for Evaluation of Budget support operations at Country.
Vers national spatial data infrastructure training program NSDI Cooperative Agreements Program (CAP) Introduction to the Cooperative Agreements.
Information Technology Planning. Overview What is IT Planning Organized planning of IT infrastructure and applications portfolios done at various levels.
MODEL-BASED SOFTWARE ARCHITECTURES.  Models of software are used in an increasing number of projects to handle the complexity of application domains.
1 Voluntary and Community Sector Review Voluntary & Community Sector Review Grants Strategy Working Party Participative Session 28 September 2006 Appendix.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
UTA/ARRI. Enterprise Engineering for The Agile Enterprise Don Liles The University of Texas at Arlington.
Logical Framework Approach 1. Approaches to Activity Design Logical Framework Approach (LFA) – Originally developed in the 1970s, this planning process.
Info-Tech Research Group1 Manage the IT Portfolio World Class Operations - Impact Workshop.
U.S. Department of Agriculture eGovernment Program Smart Choice Pre-Select Phase Transition September 2002.
Draft Report Overview: March 20, 2003 Prepared for: Planning Team Meeting Western Regional Air Partnership Presented by: Doug Jeavons — BBC Research &
Creating an evaluation framework to optimise practice returns: Process & progress within a large community sector organisation Australasian Evaluation.
Performance Management and Evaluation 8. Performance Measurement OBJECTIVE 1: Define a performance management and evaluation system, and describe how.
Federal Land Manager Environmental Database (FED) Overview and Update June 6, 2011 Shawn McClure.
Eurostat I) Context & objectives of KIP INCA project Project owner is the Environment Knowledge Community (EKC) EKC is an EU inter-services group involving.
Cost Estimating Investment Planning and Project Management
Strategic Planning for Learning Organizations
IFMIS ROLE IN BUDGET PROCESS
Figure 1. Basic Logic Model Structure
Revolutionize USACE Civil Works
Chapter # 8 Quality Management Standards
Define Your IT Strategy
Presentation transcript:

GOS Economic Model (GEM) Overview Uses the same underlying simulation software (Stella) which was used in developing TNM Economic Model (NB-Sim) Provides a comprehensive tool for deriving estimates of GOS Net Benefits (Total Benefits - Total Costs) - for each Alternative Captures multiple Benefit Streams, as specified by the Value Proposition: Reduces Duplication of Data Increased Availability or Accessibility of Data Planned Data Buys (leveraging future data purchases) Increased Spatial Readiness (still needs some work) Provides the ability to control for uncertainty of certain input parameters and estimates

Net Benefit Calculation/Estimation Process GEM uses a variety of inputs (i.e., quantitative estimates) to determine the Total Annuals Benefits associated with GOS The design of the model’s benefit elements is based largely upon the type of GOS benefits documented in the GOS Value Proposition The Cost portion of the model is based upon input from the GOS LCC Analysis Major runs of the model will coincide with key FY 2004 GOS Milestones - Submission of the BY’06 Exhibit 300 (September 2004)

Measuring Spatial Readiness/Spatial Intelligence The Value Proposition defines certain key Premises: - GOS plays a major role in closing the GAP that exists in federal agencies in terms of Spatial Readiness - Spatial Readiness is the essential prerequisite for having Spatial Intelligence - Applying Spatial Intelligence leads to better (more informed) decision making and better use of agency resources GOS overall benefits cannot be fully realized until the overall Federal Agency GAP has been closed Therefore, GOS’ role in accelerating GAP Closure is the basis in which the federal enterprise achieves Spatial Readiness

Federal Agency Assessment (Measuring Spatial Readiness) Spatial Readiness is one of several key parameters and estimates which serve as inputs to the overall Exhibit 300 Cost Benefit Analysis Preparation The GOS team’s baseline approach to the Life Cycle Cost (LCC) Analysis and CBA is based upon grouping Federal Agencies and Departments into Tiers The proposed next step is to follow this initial grouping with a more rigorous approach which takes into account specific criteria for assessing Spatial Readiness The proposed approach consists of the following steps: - Form a small inter-agency assessment team - Enable team to score agencies independently based upon a specific set of criteria - Total team member scores and develop readiness index for each agency

**Current Readiness - recommend that a small inter- agency team assess and rate each Tier 2 and Tier 3 agency based upon certain GOS specified criteria (i.e., Readiness Matrix) Top Down Approach for Assessing Spatial Readiness Spatial Readiness Inadequate (inability to use spatial data) Low (Required for GOS Compliance) High (Uses Spatial Intelligence) Tier 1Tier 2Tier 3 Essential (On-going Use of Spatial Data) Representative Agencies’ Distribution for Tier 3 Agency X Smaller Readiness Gap Assumption: Having a large Investment in Geospatial Technology (as a % of an Agency’s IT Infrastructure) means high degree of Spatial Intelligence) Overall Readiness GAP

Top Down Approach for Measuring Spatial Readiness Representative Spatial Readiness Index (varies by Agency and by Tier) Representative GAP Size (varies by Agency and by Tier) Assessment and Scoring of individual Agencies/Depts. Representative Readiness Assessment Criteria Note: Spatial Readiness Assessment should also distinguish “Early Adopters” from “Late Adopters” (as defined in the Urban Logic Value Proposition Report)

GEM Other Key Input Parameters

GEM Other Key Input Parameters - Cont’d

GEM Comparison to TNM Economic Model (NB-SIM) Federal Sector State and Local Governments Measures Primarily Impact on State and Local Governments Through increasing GIS Application Usage (and data access) Measures Direct Impact on Federal Sector Primarily Through Improvements in Efficiency (Spatial Readiness) and Operations (Spatial Intelligence) GOS Economic Model TNM Economic Model GEM Benefit Estimation Provides Indirect measurement only - below the Federal Level Boundary where benefits should accrue to both GEM provides an estimate of GOS Net Benefits focused Primarily at the Federal Level Benefits to State and Local government levels are inherent in the Value Proposition by mapping to the BRM NB-SIM provides an estimate of TNM Net Benefits focused Primarily at the State and Local Level (i.e., 3,078 counties) Apps Usage at the Federal level can also be measured directly using NB-SIM - but that is not the focus of benefits associated with TNM

Comparison to TNM Economic Model - Cont’d Benefit estimates for measuring Spatial Intelligence (i.e., going from theory to practice) requires more analytical work GEM is focused on measuring Net Benefits for all Agencies across the Federal Sector. Correspondingly, the model and inputs could be tailored for individual agencies to assess: - Their internal CBA for geospatial investments -Their contribution to the overall GOS CBA GOS Benefits should also accrue directly to States and local governments through their partnership with GOS and improvements in discovery and better access to spatial data Apportionment of GOS Benefit Estimates to State and local levels would require a special study (i.e., a tailored run of GEM for a subset of agencies and BRM sub-functions)

Comparison to TNM Economic Model - Cont’d TNM Economic Model was designed to do the following: - simulate the number of users (across all US counties) - estimate the extent of [gis] application innovation and diffusion -estimate the changes in net benefits (NB) of implementing spatial data applications TNM Economic Model sought to measure the impact (NB) of there being a National Map versus an environment in which there is no National Map.

Comparison to TNM Economic Model - Cont’d TNM Economic Model Benefits: - Value of TNM Data in helping to reduce the costs to generate, populate, or operate spatial databases -Value of improving the outcome of projects because of better information TNM Economic Model defined 3 Tiers of Applications: - Tier 1 (5% of all counties) - represents sophisticated GIS applications (e.g., complex geospatial statistics and formal optimization modeling) - Tier 2 (30% of al counties) - represents applications which use digital spatial data to perform functions such as complex route planning or locational analysis - Tier 3 (65% of all counties) - represent basic applications, including paper mapping and simple overlay analysis in a GIS

The GEM Visual Representation (A Brief Synopsis) The Stella Modeling Tool provides a visual representation of mathematical concepts, formulas, and equations. These equations are used to run the economic simulation that has been developed for GOS. The GEM Visual Representation is a system diagram which shows stocks (where things accumulate, such as benefits and costs). There are also flows into and out of the stocks, which are represented by lines (or pipes). There are also varying rates of flow (or change) through these pipes - such as rates for increasing benefits over time.

GEM Model Visual Components – Federal Budget Input This portion of GEM shows how budget information is represented in the model. This information is later tied to the Federal agencies BRM sub- functions.

GEM Model Visual Components - Spatial Readiness This portion of GEM shows the various components of Spatial Readiness and how the Model handles the relationship between increasing Spatial Readiness (and Spatial Intelligence) as the Gap Size is decreased.

GEM Model Visual Components - Benefit Estimation This portion of GEM shows the key Benefit components that are based upon improvements in federal agency efficiency and coordination, through GOS. It also provides for increasing benefits based upon improvements to agencies BRM sub-function.

GEM Model Visual Components - Cost Elements This portion of GEM shows the various GOS Cost components and how costs are accumulated on an annual basis. The accumulation of costs leads to increase in GOS Percent Completion. This increased completion is, in turn, tied to the rate at which benefits accumulate on an annual basis.

GEM - The Complete Picture Spatial Readiness EstimationLife Cycle Cost Input Federal Agency Spatial/Non-Spatial BudgetsGOS Benefit Estimation