Eric Prebys Accelerator Physics Center Program Director, LARP December 7, 2009.

Slides:



Advertisements
Similar presentations
SLAC Accelerator Department The PEP-II Accelerator John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLUO.
Advertisements

January 15, 2005D. Rubin - Cornell1 CESR-c Status -Operations/Luminosity December/January vs September/October -Machine studies and instrumentation -Simulation.
 An h=4 (30 MHz) RF system will be used for electron operation. For protons, this would correspond to h=56, and the 1 kV maximum gap voltage would only.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
High Level LHC Schottky Software Development Jerry Cai & The LAFS Team 28 January 2009 Presented by Elliott McCrory.
Guy Crockford AB/OP OP Days, 7/2/2007 LHC Specific BI Systems This presentation reviews the status of the specific BI systems for the LHC. The work plan.
Eric Prebys USPAS, Knoxville, TN, Jan , 2014.
12/12/04 1 Stewart Boogert (UCL) Second Mini-workshop Nano project at ATF UK plans for Energy spectrometer studies University College London Stewart Boogert.
1 BeamBeam3D: Code Improvements and Applications Ji Qiang Center of Beam Physics Lawrence Berkeley National Laboratory SciDAC II, COMPASS collaboration.
Eric Prebys LARP Program Director Jaunary 14, 2009.
CERN Trip Report: April 4-8, 2011 LAFS Work Elliott McCrory April 20, 2011.
 Guidance from DOE  $13M with a 6 month continuing resolution at 84%.5*.84*13+.5*13 = $11.96M  Separate money ($1-2M) found for APL planning!  General.
Eric Prebys Fermilab APC Program Director, LARP April 15, 2010.
APEX Cameron BBQ 3Nov06 BBQ and Other Developments Peter Cameron.
Eric Prebys, Fermilab Director, US LHC Accelerator Research Program (LARP) February 16, 2010.
 Good  LARP has grown significantly in size since it started  Gained credibility both here and at CERN US Labs like it as a way to support work CERN.
H. Matis, M. Placidi, A. Ratti, W. Turner [+ several students including S. Hedges] (LBNL) E. Bravin (CERN), R. Miyamoto (BNL – now at ESSS) H. Matis -
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
Recent Upgrades to BBSIM Code V. H. Ranjbar † † Tech-X Corporation We have made several improvements to BBSIM, a parallel beam dynamics simulation code.
Pavel Karataev John Adams Institute for Accelerator Science At Royal Holloway, University of London oPAC Advanced School on Accelerator Optimisation 7-11.
FFAG-Workshop Dec Kumatori Japan Diagnostics for FFAG- accelerator Takahisa ITAHASHI Department of Physics, Osaka Univ. Toyonaka, Osaka, ,Japan.
Eric Prebys, Fermilab Director, LARP November 13, 2014.
Eric Prebys, Program Director US LHC Accelerator Research Program (LARP) 10/24/2008 Ultimate tribute Sept 10, 2008.
US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley.
1 BNL LARP Accelerator Physics Program Resources BNL role in national program BNL Accelerator Physics Program.
Global Design Effort ILC Crab Cavity Overview and requirements Andrei Seryi SLAC on behalf of ILC Beam Delivery and Crab-Cavity design teams Joint BNL/US-LARP/CARE-HHH.
J. Strait Fermilab 16 October 2006 Consideration on LHC upgrade from A US perspective.
Proposal for LHC Microwave Schottky Pickups Ralph J. Pasquinelli 3/9/2005.
F LHC Accelerator Research Program Accelerator Systems Tanaji Sen FNAL/APC  Project management  Accelerator Physics  Instrumentation  Beam commissioning.
Eric Prebys, Fermilab Director, US LHC Accelerator Research Program (LARP) March 15, 2011.
Plan for Review of FCC- ee Optics and Beam Dynamics Frank Zimmermann FCC-ee Design Meeting 31 August 2015.
US LHC Accelerator Research Program (LARP) Background  Proposed in 2003 to coordinate efforts at US labs related to the LHC accelerator (as opposed to.
1 Experience at CERN with luminosity monitoring and calibration, ISR, SPS proton antiproton collider, LEP, and comments for LHC… Werner Herr and Rüdiger.
Joint IR Studies: Operating Margins Nikolai Mokhov Fermilab bnl - fnal- lbnl - slac US LHC Accelerator Research Program LARP Collaboration Meeting SLAC.
Luminosity measurement at LHC (The machine point of view) Enrico Bravin AB/BDI Large part of the material presented here has been produced by the LBNL.
Status of Head-on Beam-Beam Compensation BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program A. Valishev, FNAL 09 April 2009 LARP CM12.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Eric Prebys LARP Program Director January 14, 2009.
LARP Collaboration Meeting April BNL -FNAL - LBNL - SLAC Status Report E. Harms 28 March 2006.
Beam-beam compensation at RHIC LARP Proposal Tanaji Sen, Wolfram Fischer Thanks to Jean-Pierre Koutchouk, Frank Zimmermann.
Welcome !! to the CAoPAC Workshop Carsten P. Welsch.
February 5, 2005D. Rubin - Cornell1 CESR-c Status -Operations/Luminosity -Machine studies -Simulation and modeling -4.1GeV.
Remote Monitoring for Hardware & Beam Commissioning E. Harms/FNAL 7 April 2005 Port Jefferson, New York bnl - fnal- lbnl - slac US LHC Accelerator Research.
Tuning Techniques And Operator Diagnostics for FACET at SLAC National Accelerator Laboratory Chris Melton SLAC Accelerator Operations.
Eric Prebys, Fermilab Director, US LHC Accelerator Research Program (LARP) February 4, 2011.
LARP Review, June 12-14, 2006 Prebys, Todesco, Zisman 1 Accelerator Systems Eric Prebys Ezio Todesco Mike Zisman.
2 February 8th - 10th, 2016 TWIICE 2 Workshop Instability studies in the CLIC Damping Rings including radiation damping A.Passarelli, H.Bartosik, O.Boine-Fankenheim,
Updates on Tevatron and LARP Vladimir Shiltsev FNAL/Accelerator Physics LARP/Accelerator Systems.
Eric Prebys, Fermilab Director, LARP October 29, 2010 *plus a bit of LAFS.
F Monitor of Beam in the Abort Gap Randy Thurman-Keup DOE Review of Tevatron Operations at FNAL March 29-31, 2005 a.k.a. Abort Gap Integrator (AGI)
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
H. Matis, S. Hedges, M. Placidi, A. Ratti, W. Turner [+several students] (LBNL) R. Miyamoto (now at ESSS) H. Matis - LARP CM18 - May 8, Fluka Modeling.
Introduction of Accelerators for Circular Colliders 高亮度 TAU-CHARM 工厂 & 先进光源, 2014/09.
11/3/2010 CM15 Controls for LARP and LAFS - 1 Terri Lahey LARP/LAFS/CERN and SLAC.
Eric Prebys Accelerator Physics Center Program Director, LARP Important material Contributed by Elliott McCrory (FNAL), Ryoichi Miyamoto (BNL), Alan Fisher.
LARP Accelerator Systems D. Rice, J. Rosenzweig, M. White LARP 2009 review.
US LHC Accelerator Research Program (LARP)
Lebanese Teacher Programme 18/04/2017
CLIC-ILC BDS & MDI work.
Jeffrey Eldred, Sasha Valishev
LHC Status, Upgrade Path, and US Contributions
LHC Status, Upgrade Path, and US Contributions
Luminosity measurement at LHC (The machine point of view)
450 GeV Initial Commissioning with Pilot Beam - Beam Instrumentation
Gap Transient Suppression using Increased Bunch Density
Measurement of the beam (transverse) emittances
Crab Crossing Named #1 common technical risk (p. 6 of the report)
Presentation transcript:

Eric Prebys Accelerator Physics Center Program Director, LARP December 7, 2009

 Proposed in 2002 to coordinate efforts at US labs related to the LHC accelerator (as opposed to CMS or ATLAS)  Originally FNAL, BNL, and LBNL  SLAC joined shortly thereafter  Some work (AC Dipole) supported at UT Austin  Currently $12-13M/yr + coordination of core resources  LARP Goals  Advance International Cooperation in High Energy Accelerators  Advance High Energy Physics By helping the LHC integrate luminosity as quickly as possible  Advance U.S. Accelerator Science and Technology  LARP includes projects related to initial operation, but a significant part of the program concerns the LHC upgrades December 7, AEM Talk - LARP/LAFS Instrumentation

 Schottky detector  Used for non-perturbative tune measurements (+chromaticities, momentum spread and transverse emmitances)  Tune tracking  Implement a PLL with pick-ups and quads to lock LHC tune  Investigating generalization to chromaticity tracking  AC dipole  US AC dipole to drive beam  Measure both linear and non-linear beam optics  Luminosity monitor  High radiation ionization detector integrated with the LHC neutral beam absorber (TAN) at IP 1 and 5.  Improved synchrotron light monitor  Alan Fisher improved the light collection optics in the SLM  Low level RF tools  Leverage SLAC expertise for characterization and optimization of RF cavities December 7, AEM Talk - LARP/LAFS Instrumentation

 It was decided early that LARP itself would not support software projects  The idea was the LARP would do R&D, and the promising technology (along with the required software) would be handed off to someone else.  For this reason, the LAFS groups was created. Charter members:  Dave McGinnis  Jean Slaughter  Suzanne Gysin  Elliott McCrory  Jim Patrick December 7, AEM Talk - LARP/LAFS Instrumentation

 Role-based access control (RBAC): sophisticated access control for accelerator related applications  Susanne Gysin spent 9 months at CERN gathering information, writing requirements and implementing version 1  Wire scanner app.  Elliott McCrory worked on this app. during his two years at CERN  Already being used extensively  Beam Synchrotron Radiation Monitor (BSRT) app And daemon:  Monitor beam synchrotron radiation to measure bunch shape and verify abort gap  Schottky application:  Set schottky DAQ parameters, read and display data  Lumi monitor application:  GUI to control and display data from the lumi monitor *courtesy Elliott McCrory Joint involvement with LARP December 7, AEM Talk - LARP/LAFS Instrumentation

 Proposed by LARP  Installed in collaboration with CERN  Application written by LAFS (J. Cai) Allows tune to be monitored on selected buckets (simulated data) December 7, AEM Talk - LARP/LAFS Instrumentation

Installation at IP5 In-situ noise measurement Simulated signal December 7, AEM Talk - LARP/LAFS Instrumentation

 By driving the beam near the (aliased) tune, one can probe linear and non-linear optics  4 AC dipoles installed at CERN based on tests in the Tevatron (R. Miyamoto) Sextupole term Audio amplifiers December 7, AEM Talk - LARP/LAFS Instrumentation

 Used to measure beam profile and monitor abort gap  Alan Fisher (LARP LTV from SLAC) proposed and implemented dramatically improved optics to accommodate shifting source location December 7, AEM Talk - LARP/LAFS Instrumentation

 Leverage RF tools and techniques developed at PEP-II  Effort led by John Fox  Configuration tools used extensively during LHC RF commissioning December 7, AEM Talk - LARP/LAFS Instrumentation

December 7, AEM Talk - LARP/LAFS Instrumentation