Chapter 14 Pricing and Estimating. Pricing and Estimating Many managers regard pricing as an art ! Many managers regard pricing as an art ! Information.

Slides:



Advertisements
Similar presentations
Successful Project Management Justice, E-Government, & the Internet June 28, 2000 – Dallas, Texas Lawrence P. Webster.
Advertisements

Best Practices for an Owner Estimating Organization
Project Cost Management Chapter 7
Project Management 6e..
Systems Analysis and Design 9th Edition
Project Management Outline of Chapters 1-6. Chapter 1 – Project Management Concepts Definition of a project and its attributes Key constraints within.
Chapter 22 Cost Control Using Standard Costing and Variance Analysis
Chapter 5 Project Planning
PROCEDURES FOR SELECTING THE CONTRACTOR
Chapter 13: Preparing the System Proposal Instructor: Paul K Chen.
Successful Project Management Justice, E-Government, & the Internet June 28, 2000 – Dallas, Texas Lawrence P. Webster.
The Analyst as a Project Manager
Time and Cost Estimation
COMMERCIAL “SOLE SOURCE” PROPOSAL ANALYSIS ROADMAP 1. Is information available within the Government? Step 1 – Information within the Government If Yes.
Chapter 6 IT Cost Control Management of Computer System Performance.
COMP8130 and 4130Adrian Marshall 8130 and 4130 Test Management Adrian Marshall.
Scheduling PREREQUISITES FOR EFFECTIVE SCHEDULING.
Cost Control. Do project managers control costs, monitor costs or both?
Project Management Basics
Chapter 3 Project Initiation. The stages of a project  Project concept  Project proposal request  Project proposal  Project green light  Project.
Reaching Goals: Plans and Controls
Test Results % 18 – 95% or 97%.
© 2006 ITT Educational Services Inc. System Analysis for Software Engineers: Unit 5 Slide 1 Chapter 3 Managing the Information Systems Project.
 2004 Prentice Hall Business Publishing, Accounting Information Systems, 9/e, by Bodnar/Hopwood 11 – 1 Chapter 11 Systems Implementation, Operation,
Project Management Project Planning Costs & Budget
GWAC Ordering Procedures Overview
Copyright © 2014 McGraw-Hill Higher Education. All rights reserved. CHAPTER 15 Project Management McGraw-Hill/Irwin.
McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Reaching Goals: Plans and Controls Today’s smart supervisor.
Free Powerpoint Templates Page 1 Free Powerpoint Templates How do we do it? Class 7.
Chapter 8 Pricing Generally. Objectives Upon completion of this chapter, you will be able to: –Describe the general process of pricing a construction.
Chapter 5 Sem I, 2003/2004Prepared by: Jafri Mohd Rohani1 Project Planning “ If you don’t plan for the project, you are planning for failure” “ Plans act.
Project Management April 28, 2008 Eric Verzuh Project Management April 28, 2008 Eric Verzuh.
CS-411W VIII – Budgeting, Costing, and Pricing. Definitions Cost - the value of inputs that have been used to produce something. Inputs are typically.
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 10 Project Cost Management.
ENTREPRENEURSHIP Chapter # 07 The Business Plan: Creating and Starting the Venture.
Slide 1 Project Management Chapter 4. Slide 2 Objectives ■ Become familiar with estimation. ■ Be able to create a project workplan. ■ Become familiar.
Management & Development of Complex Projects Course Code - 706
Felix Sanchez Estimating the Budget and Cost (Part 1) Project Management for ARA Engineers and Scientists Developing a Bottoms Up Estimate.
3 1 Project Success Factors u Project management important for success of system development project u 2000 Standish Group Study l Only 28% of system development.
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#03 DEPARTMENT OF ENGINEERING MANAGEMENT.
Copyright 2009 John Wiley & Sons, Inc. Chapter 6 Project Activity Planning.
© 2014 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected by Copyright and written permission should be obtained.
 2001 Prentice Hall Business Publishing, Accounting Information Systems, 8/E, Bodnar/Hopwood Systems Implementation, Operation, and Control Chapter.
© 2006 John Wiley and Sons, Inc. Project Management: A Managerial Approach Chapter 7 – Budgeting and Cost Estimation.
Jeff Sestokas Estimating the Budget and Cost (Part 2) Project Management for ARA Engineers and Scientists Developing an Estimate from the Top Down.
Planning in Organizations Why supervisors and managers plan: Knowing what the organization is trying to accomplish helps them set priorities and make decisions.
Module 5 Session 5.2 Visual 1 Module 5 Refining Objectives, Scope, and Other Project Parameters Session 5.2 Reviewing the PAR and refining key project.
What is project management?
Project Management “Project Planning & Scheduling” Lecture 07 Resource Person: M. Adeel Anjum.
Measurement and Payment
Advanced Project Management Project Planning Phase Ghazala Amin.
Life Cycle Costing By Rajat Shuvro Bakshi Formerly Professor of Strategic Management and International Business Indian Institute of Foreign Trade, Management.
1 Chapter 11 Planning. 2 Project Planning “establishing a predetermined course of action within a forecasted environment” “establishing a predetermined.
STRATEGY IMPLEMENTATION Chapter 7. FUNCTIONAL STRATEGIES These are made up of day to day decisions made at the operating level of the firm, often performed.
Cost and Schedule Breakout Session Paul Weinman Pacific Northwest National Laboratory.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
The Project Management Process Groups
What is a WBS? A Work Breakdown Structure is not a list of tasks, a schedule or an organization chart. Rather it provides the basis on which a task.
© Prentice Hall, © Prentice Hall, ObjectivesObjectives 1.A complete definition of a plan 2.Insights regarding various dimensions.
Author name here for Edited books chapter 9 Facility Maintenance 9 chapter.
DR. Nabil Dmaidi F ACTORS THAT D ETERMINE V ARIATION IN E STIMATES.
Systems Analysis and Design in a Changing World, 4th Edition
Systems Implementation,
Project Cost Management
Reaching Goals and Objectives
Strategy implementation
Failure Rates. Failure Rates Failure Rates Building, Heavy/Highway, Specialty Trade Contractors % 29.3%
Cost Estimating Best Practices
Chapter 7: Project Cost Management
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

Chapter 14 Pricing and Estimating

Pricing and Estimating Many managers regard pricing as an art ! Many managers regard pricing as an art ! Information available to one bidder is generally available to others. This is an essential part of the planning process. This is an essential part of the planning process. Forms the basis for establishing standards for budgets, man-hours, material costs, contingencies, etc. Forms the basis for establishing standards for budgets, man-hours, material costs, contingencies, etc. Specific pricing strategies must be developed for each situation. Specific pricing strategies must be developed for each situation.

Two Types Of Acquisition Policies for Pricing Type I acquisition: One-of-a-kind contract with little or no follow-on potential Objective: - Win the contract - Execute it profitably PRICE IT BASED ON MARKET FORCES PRICE IT BASED ON MARKET FORCES Type II Acquisition: One of many contracts One of many contracts An entry point to larger follow-up project contracts An entry point to larger follow-up project contractsObjective: - Win the contract - Perform with excellence PRICE IT BASED ON ACTUAL COST OF OPERATIONS

What to estimate? Work Work Capacity Capacity Site (roads, paving, landscape, etc.) Site (roads, paving, landscape, etc.) Labor wages, productivity, etc. Labor wages, productivity, etc. Schedule Schedule Materials, equipment, etc. Materials, equipment, etc.

TYPES OF ESTIMATES Order of magnitude estimates Order of magnitude estimates - Made without any detailed engineering data - May use past experience - Accuracy +- 35% within the scope of the project Approximate (rule of thumb) estimates Approximate (rule of thumb) estimates - Made without any detailed engineering data - May use previous similar projects -- - Accuracy +- 15% Definitive (or detailed) estimates Definitive (or detailed) estimates - Prepared from well-defined engineering data, vendor quotes, unit prices, etc. Accuracy +- 5% quotes, unit prices, etc. Accuracy +- 5% Estimating manual Estimating manual - Developed over time - Use to price out “effort”. Accuracy +-10%

Cost Foundations Actual costs to date and estimates to completion Actual costs to date and estimates to completion Proposal data Proposal data Marketing intelligence Marketing intelligence Past performance and trends Past performance and trends

Pricing Method Work is priced out at the department average, and all work performed is charged to the project at the department average salary, regardless of who accomplished the work. Work is priced out at the department average, and all work performed is charged to the project at the department average salary, regardless of who accomplished the work.

Pricing Method (Continued) Work is priced out at the department average, but all work performed is billed back to the project at the actual salary of those employees who perform the work. Work is priced out at the department average, but all work performed is billed back to the project at the actual salary of those employees who perform the work.

Pricing Method Continued) The work is priced out at the salary of those employees who will perform the work, and the cost is billed back the same way. The work is priced out at the salary of those employees who will perform the work, and the cost is billed back the same way.

Pricing out the work--Steps Clear and complete definition of work Clear and complete definition of work Develop a WBS Develop a WBS Price out the WBS Price out the WBS Review WBS cost with each functional manager Review WBS cost with each functional manager Review the Base case costs with upper level managers Review the Base case costs with upper level managers Negotiate with functional managers for qualified personnel Negotiate with functional managers for qualified personnel Develop Linear Responsibility Chart Develop Linear Responsibility Chart Develop the final PERT schedules Develop the final PERT schedules Establish pricing cost summary reports Establish pricing cost summary reports

Smoothing out Resource Loadings

Life-Cycle Costing (LCC) “Total cost to the organization for the ownership and acquisition of the product over its full life” “Total cost to the organization for the ownership and acquisition of the product over its full life” – Cost of R&D –Cost of production –Cost of operation –Cost of support –Cost of disposal Evaluate R&D cost against LCC

Life Cycle Costing SYSTEM R&D PRODUCTION SYSTEM ACQUISITION OPERATION AND SUPPORT LIFE CYCLE COST YEARS

Estimating Pitfalls Misinterpretation of the statement of work Misinterpretation of the statement of work Omissions or improperly defined scope Omissions or improperly defined scope Poorly defined or overly optimistic schedule Poorly defined or overly optimistic schedule Inaccurate work breakdown structure Inaccurate work breakdown structure Applying improper skill levels to tasks Applying improper skill levels to tasks Failure to account for risks Failure to account for risks Failure to understand or account for cost escalation and inflation Failure to understand or account for cost escalation and inflation