MERIT ORDER OPERATION AND GRID DISCIPLINE S.P.KUMAR MANAGER(IT), SRLDC,BANGALORE.

Slides:



Advertisements
Similar presentations
1 FREQUENCY LINKED DISPATCH AND ELECTRICITY PRICING (An unconventional approach for tackling the peculiar problems existing in India) - Bhanu Bhushan -
Advertisements

PRICES Chapter 5.
Tariff. The rate at which electrical energy is supplied to a consumer The rate at which electrical energy is supplied to a consumer Therefore tariff naturally.
OPPORTUNITIES FOR BUSINESSES TO DIRECTLY IMPROVE THE BOTTOM LINE THROUGH ENERGY EFFICIENCY 3 rd May 2010 Kees Brinkman Managing Director.
Consideration of Price Caps Reduction Meeting of the Board of Governors of the California ISO By David Parquet Vice President Enron North America Corp.
December 4, 2000© 2000 Fernando L. Alvarado1 Reliability concepts and market power Fernando L. Alvarado Professor, The University of Wisconsin Invited.
Energy Markets 201 Tribal Solar Working Group April 30, 2015.
11 CHAPTER Perfect Competition
Solutions to California’s Energy Crisis: Real-Time Pricing by Frank Wolak Chairman, Market Surveillance Committee March 17, 2001.
INTRA STATE ABT Necessity Issues Implementation. Some of the features of New National Electricity Policy – Feb.’05 Appropriate Commissions to undertake.
Ron Coutu STRATEGIC MARKET ADVISOR (NOT AN ENGINEER) From the Computer Scientist’s perspective of the Economist view of the Market Wholesale Electricity.
System Planning & Operations Spring 2010
Demand Response in MISO Markets NASUCA Panel on DR November 12, 2012.
1 Least Cost System Operation: Economic Dispatch 2 Smith College, EGR 325 March 10, 2006.
Deregulated Power, Pollution, and Game Theory Frank Deviney 11/16/05.
Chapter 4 How Businesses Work McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Load shedding in Pakistan Reasons & Remedies February 9, 2009 By Muhammad Ziauddin.
1 THE INDIA ELECTRICITY MARKET TIME LINE REAL TIME 15 MT BLOCKS LONG TERM LOAD FORECAST FUND MOBILISATION 10-5 YEARS POWER PURCHASE AGREEMENTS CAPACITY.
Welcome New York Independent System Operator. (Pre-NYISO) Regulated Market Physical contracts Regulated industry Cost Based System Two Party Deals Bundled.
Innovative approach to DSM through Open Access Jayant Deo MD & CEO, Indian Energy Exchange
(C) NordPool1 The Nordic Power Market Zonal Pricing Jan Vidar Thoresen Managing Director Nord Pool Consulting AS.
Energy Markets 101 Tribal Solar Working Group March 24, 2015.
CDAE 272 International Economic Development Spring 2008.
W E L C O M E Power Grid Corporation of India Limited.
Leader-Follower Framework For Control of Energy Services Ali Keyhani Professor of Electrical and Computer Engineering The Ohio State University
Critical Issues Electricity Distribution Industry Restructuring Electricity Distribution Interests of Distributors Power Shortages and the Economy Importance.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
ECONOMIC MODEL A set of assumptions that can be listed in a table, illustrated with a graph, or even stated algebraically - to help analyze behavior and.
1 APPROPRIATE PRICING OF TRANSMISSION A PRESENTATION BY SRLDC, BANGALORE.
1 The End User’s Perspective – Indian Power Sector.
SRLDC WELCOMES SHRI VISHNUVARDHAN REDDY DIRECTOR(F) KPC.
SRLDC 1 POWER SYSTEM OPERATION A FRESH PERSPECTIVE Power Grid Corporation of India Limited New Delhi, India.
ABT / IEGC CLAUSES While making or revising their declaration of capability, the generator shall ensure that their declared capability during peak hours.
Managing Reliability and the Markets with PI
Power Trading The Indian electricity sector has grown manifold since independence making India the third largest producer of electricity in Asia. The installed.
1 Demand Response A 28 Year History of Demand Response Programs for the Electric Cooperatives of Arkansas by Forest Kessinger Manager, Rates and Forecasting.
1 INTRA – STATE AVAILABILITY BASED TARIFF (ABT) A Presentation on INTRA – STATE AVAILABILITY BASED TARIFF (ABT)
AN OVERVIEW IN RESPECT OF CPP’S ON ALL INDIA BASIS.
Illinois Wholesale Market Update December 10, 2003.
© 2010 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
1 The Tipping Point macro forces are converging to create a revolutionary “Tipping Point” within 5 years change will be fast –
POWER SECTOR REFORMS Grid Operation and Control in the changed Scenerio.
Optimizing Power Availability -- Action Plan for Next Decade Challenges of Distribution -- Investment and Reforms 1.
Power Trading Financial Markets Electricity. Triple Point Technology2 Current Situation… GenerationTransmissionDistributionConsumers.
Electricity pricing Tariffs.
AN OVERVIEW IN RESPECT OF CPP’S IN SOUTHERN REGION STATES.
SRLDC 1 COMPETITION IN GENERATION Power Grid Corporation of India Limited New Delhi, India.
Modeling the Market Process: A Review of the Basics Chapter 2 © 2007 Thomson Learning/South-WesternCallan and Thomas, Environmental Economics and Management,
AVAILABILITY BASED TARIFF AND SCHEDULING MECHANISM.
© 2010 Pearson Education Canada Perfect Competition ECON103 Microeconomics Cheryl Fu.
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
UTILISATION OF IDLING CAPACITY OF CAPTIVE POWER PLANTS-A VIABLE ALTERNATIVE BHANU BHUSHAN DIRECTOR(OPERATION),POWERGRID.
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
AVAILABILITY BASED TARIFF. - Tariff structures - Two part tariff - Concept of ABT - ABT structure - Expectations from OEMs/Utilities Session outline.
MERIT ORDER SCHEDULING AND DESPATCH V. K. AGRAWAL NRLDC.
UI – ITS MANY AVATARS!. UNSCHEDULE INTERCHANGE It's more than what meets the eye!!!!
Prices and Decision Making. Life is full of signals that help us make decisions. Price-the monetary value of a product as established by supply and demand-is.
© Thomson/South-Western ECONOMIC EDUCATION FOR CONSUMERS Slide 1 Consumer’s Role in the Economy Objectives: By the end of class, students will be able.
STATE-WISE INSTALLED ELECTRICITY GENERATION CAPACITY OF CAPTIVE PLANTS (1 MW & ABOVE) StatesHydroSteamDieselGasWindTotal AP
W E L C O M E Power Grid Corporation of India Limited.
Energy Economics Group, TU Wien
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
Relevant costs for decision making
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
Impact of Wind Farms Aggregation on Large System Scheduling Cost Under Frequency Linked Deviation Settlement Mechanism Presented by Anoop Singh Authored.
Chapter 6 Prices More real world situations.
Prices.
Ahmad Elberry, Abdelghani Aljayyousi
Economics Created by Educational Technology Network
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
Presentation transcript:

MERIT ORDER OPERATION AND GRID DISCIPLINE S.P.KUMAR MANAGER(IT), SRLDC,BANGALORE

TRADITIONAL METHODS TOPICS COVERED FREQUENCY BASED DESPATCH CPP’S GETTING THEM INTO THE GRID SPOT MARKET

ECONOMIC SYSTEM OPERATION TRADITIONAL METHODS AVAILABILITY BASED TARIFF –LONG TERM MARKET –DAY AHEAD MARKET –SPOT MARKET

TRADITIONAL METHODS COSTS INVOLVED IN A POWER PLANT –FIXED COST (EMBEDDED-STRANDED) CAPITAL,INTEREST,INSURANCE,ROE,AMORTIZATION –VARIABLE COST BASICALLY FUEL COST(MAIN&ALTERNATE FUELS), VARIABLE O&M COST ETC START UP COSTS RAMP UP/DOWN COSTS BOX UP COSTS CONCURRENCY CAPABILITY/COSTS VALVE POINTS CONGESTION CHARGES TRANSMISSION LOSS TRANSMISSION CHARGES

ELECTRICITY PRICE SIGNALS LIGHTING A 100W LAMP RS0.60/UNIT RS 1.00/UNIT WHO WOULD YOU BUY THE POWER FROM? C1=2400*P C2=4000*P /HOUR COST YOU NEED SAY 100 W WHO WOULD YOU BUY THE POWER FROM? BOTH PLANTS 500<P<1500 SURPRISINGLY, THE ANSWER IS THE SAME PLANT A!!

ELECTRICITY PRICE SIGNALS THE ‘PRICE SIGNAL’ IN THIS CASE WOULD BE THE 24Ps (PER HOUR) AND THE 40 Ps (PER HOUR) COSTS WE FINALLY ARIVED AT. THIS IS FOR THE INCREMENTAL LOAD – YOUR 100W LAMP! THE COST /HOUR SHOWN IN PREVIOUS SLIDE IS THE VARIABLE COST THE COST DERIVED FOR LIGHTING THE 100W LAMP IS THE ‘INCREMENTAL COST’ –INCREMENTAL COST IS THE COST INCURRED FOR SUPPLYING THE NEXT MW OF POWER. –REPRESENTED BY λ

Economic Operation: cost curves

POWER SECTOR TODAY……. POWER SHORTAGES LOAD SHEDDING ROSTERING POWER CUTS BROWN OUTS BUT STILL OUR CAPTIVE AND CO-GENERATION REMAIN UNDER UTILISED

THE AVAILABILITY BASED TARIFF – A FRAMEWORK FOR FACILITATING TRADE GETTING THEM INTO THE GRID

AN EVERY DAY EXAMPLE SEB CPP + STEEL PLANT CAPACITY: 2X65 MW RATE: 100p/UNIT REQUIREMENT: 120±10 MW CAPABILITY: 120 MW AVAILABILITY: FULL FOR 10 MONTHS, ONE UNIT ON OVERHAUL FOR 2 MONTH EVERY YEAR CONDITIONS 1)30 MW MINIMUM DEMAND 2)70 MW MAX DEMAND FOR 2 MONTHS REPURCUSSIONS: FOR 10 MONTHS THE CPP RUNS AT PART LOAD OF 90 MW DUE TO CONDITION 1) ABOVE

A POSSIBLE SOLUTION SEB AND CPP AGREE ON A SCHEDULE – SAY 70 MW FOR 2 MONTHS AND 30 MW FOR REST OF THE YEAR. ANY DEVIATION FROM THE ABOVE WOULD ATTRACT A FREQUENCY LINKED UI RATE.

A WIN-WIN SITUATION IN CASE THE FREQUENCY IS LOW: –CPP GENERATES MORE AND BENEFITS FROM THE UI. –SEB BENEFITS BECAUSE IT DOES NOT HAVE TO DRAW FROM THE GRID AT HIGH PRICE. –MORE LOAD IS SERVED.

A WIN-WIN SITUATION IN CASE THE FREQUENCY IS HIGH: –CPP GENERATES LESS. –SEB BENEFITS BECAUSE IT DRAWS POWER FROM THE GRID AT A LOW PRICE. –MERIT ORDER IS ACHIEVED. THE CPP CAN DECIDE LEVEL OF GENERATION DEPENDING ON THE FREQUENCY AND ITS NETT INCREMENTAL COST

ADVANTAGES FOR CPP SIMPLICITY – A FREQUENCY METER IS ALL THAT IS REQUIRED NO TELEMETRY OR COMMUNICATION WITH SLDC/SEB NO PRICE TO BE NEGOTIATED CPP DOES NOT HAVE TO SEARCH FOR BUYER CPP CAN MAKE A REASONABLE PROFIT.

ADVANTAGES FOR SEB IMPARTIAL AND UNBIASED SYSTEM NEED NOT WORRY ABOUT CPP UNDER-GENERATING AT LOW FREQUENCY AND OVER- GENERATING AT HIGH FREQUENCY FRAMEWORK FOR SETTLEMENT IS ALREADY AVAILABLE