1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware December 2004 Status Marc Campell, Subsystem Manager.

Slides:



Advertisements
Similar presentations
Mech Systems Proposed EMI Modifications Marc Campell 9/2/03.
Advertisements

1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
GLAST LAT ProjectLAT Mgr’s meeting July 17-18, LAT Planning Meeting Mechanical Systems Marc Campell.
GLAST LAT ProjectQuarterly Review of the GLAST/LAT Project, August 14, 2001 Martin Nordby1 GLAST Large Area Telescope: Mechanical Systems Martin Nordby.
GLAST LAT ProjectLAT Mgr’s Meeting October 13, LAT Planning Meeting Mechanical/Thermal Systems October 2004 Marc Campell.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 1.1 Management 1 GLAST Large Area Telescope: Mechanical.
GLAST LAT ProjectLAT Mgr’s Meeting November 17, LAT Planning Meeting Mechanical/Thermal Systems November 2004 Marc Campell.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems Radiator and X-LAT Assy1 GLAST Large Area Telescope:
GLAST LAT Project I&T Meeting – Jan 29,2004 E. Gawehn 1 GLAST Large Area Telescope: MGSE Status Report Eric Gawehn SU-SLAC I&T MGSE Engineer
GLAST LAT Project – Cost and Schedule ReviewNovember 3, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review November 3, 2004.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 1 Presentation 8 of 12 Integration and Test GLAST Large Area Telescope: Pre-Shipment Review Integration.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
LAT-PR Section 22-1 GLAST LAT ProjectMechanical Design Integration Peer Review, March 2003 Mechanical Design Integration Peer Review, March 2003.
GLAST LAT ProjectMonthly Status Review – December 2, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Darren Marsh SLAC Performance & Safety.
GLAST LAT ProjectLAT Mgr’s Meeting LAT Planning Meeting Mechanical/Thermal Systems March 17, 2005 Marc Campell.
111/3/2004 GLAST LAT ProjectLAT Engineering Meeting LAT Face to Face Manager’ Meeting Nov. 3, 2004 LAT Level Design Status LAT Face to Face Manager’ Meeting.
GLAST LAT ProjectF2F, June 15, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager.
GLAST I&T January T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
LAT Design Integration1 GLAST LAT ProjectDecember 2003 LAT Planning Meeting December 10, 2003 Design Integration LAT Planning Meeting December 10, 2003.
GLAST Calorimeter SLAC LAT Meeting 17Jul 2003 Naval Research Lab Washington DC wnjohnson 1 SLAC Meeting Calorimeter Subsystem 17 July 2003 W. N. Johnson.
ASPERA-3 Sep. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 9_25/ Page 1 Monthly Status Report Report due 9/25/00 Schedule statused.
GLAST Large Area Telescope:
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems X-LAT Assy1 GLAST Large Area Telescope: Mechanical.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.1 Grid Box Design 1 GLAST Large Area Telescope:
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
LAT Design Integration and Analysis1 GLAST LAT Project1 Sep 2005 LAT Monthly Status Review 1 Sep 2005 Design Integration and Analysis LAT Monthly Status.
LAT-PR Section 55-1 GLAST LAT ProjectMechanical Design Integration Peer Review, March 2003 Mechanical Design Integration Peer Review, March 2003.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Overview LAT Environmental Test.
GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 8 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
Instrument Status GLM Science Team Meeting 9 September 2016 Marc Rafal/GSFC GLM Instrument Manager.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Operations and Logistics LAT Environmental.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem.
GLAST LAT ProjectMonthly Status Review – Nov 3, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems September 2003 GSFC Status Marc Campell, Subsystem Manager.
GLAST Calorimeter Monthly Cost / Schedule / Mission April 2004 Naval Research Lab Washington DC wnjohnson 1 Monthly Cost/Schedule/Mission Review GLAST.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
LAT-PR Section 11-1 GLAST LAT ProjectMechanical Design Integration Peer Review, March 2003 Mechanical Design Integration Peer Review, March 2003.
LAT MPSRLAT Structural Analysis-1 GLAST LAT ProjectNov-04 Structural Analysis: Completed Tasks LAT System Level –LAT Environmental TIM Support A success.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.3 Fab & Assy Plans 1 GLAST Large Area Telescope:
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT I&T MGSE Page 1 of 11 GLAST Large Area Telescope: I&T Integration Kickoff Meeting MGSE March.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems November 2003 GSFC Status Marc Campell, Subsystem Manager.
Bill Raynor Naval Research Lab
GLAST Large Area Telescope:
SPF MAG Quarterly Report – Feb 2015
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Mechanical Integration
Environmental Test Planning
Integration and Test GLAST Large Area Telescope:
GLAST Large Area Telescope:
Precision Oven Thermal Design
GLAST Large Area Telescope: Cost/Schedule Review September 1, 2005
1. Introduction and Overview
GLAST Large Area Telescope:
Thermal Vacuum Test: Plans and Procedures
Design Integration and Analysis
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Integration and Test Organization Chart
GLAST Large Area Telescope:
Mechanical/Thermal Systems
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Design Integration and Analysis
GLAST Large Area Telescope:
Presentation transcript:

1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware December 2004 Status Marc Campell, Subsystem Manager

2 GLAST LAT ProjectMechanical Systems Accomplishments Accomplishments during December. –Missing feature was added to grid – this allowed temperature sensor wiring in the X axis purge grooves to pass under the Y axis heat pipes (more later). –The 5th Top Flange Heat Pipes was bonded into Grid. –Lockheed progress reported earlier.

3 GLAST LAT ProjectMechanical Systems 3 Month Milestones Jan - Mar

4 GLAST LAT ProjectMechanical Systems Drawing Release Plan 57 of 81 (70%) drawings released –18 MLI drawings have been added to MECH drawing list –4 unreleased parts not needed until I&T operations In check Known drawing revisions –Feb – 2 planned X-LAT (ready for release) & Radiator IDD’s –Investigating potential interference between X-LAT cooling tube exit point and proposed Spacecraft MLI attachment

5 GLAST LAT ProjectMechanical Systems Concerns Lockheed Martin - X-LAT plate & Radiator delivery schedule –See LM presentation

6 GLAST LAT ProjectMechanical Systems Concerns (cont) Grid to I&T delivery date – schedule continues to compress. –2 big delays in delivery to I&T –Requirement to bake out adhesive used to bond heat pipes in order to meet outgassing requirements Oven identified for this work in Oct After SLAC injury incident, internal review revealed multiple deficiencies that had to be corrected before oven could be used. Still not online. Developed work around plan to address these issues. Plan to demonstrate ability to control grid temperatures on grid mass simulator (alum plates) –Rework of Grid for missing feature Tooling developed and fabricated Rework technique demonstrated on 1 x 4 Grid

7 GLAST LAT ProjectMechanical Systems Grid Rework Completed

8 GLAST LAT ProjectMechanical Systems Open Flight Design Issues Requirements for Grid survival heaters & thermostats being revised to raise minimum Tracker temperatures –MRB has approved modification to these parts –Existing Qual is valid for new thermostats with higher set point and slightly higher current for 30,000 cycles –New thermostat has a much higher duty cycle in Safe mode. Is 30,000 cycles satisfactory? TCS validation vs. LM modified Radiator Thermal Vacuum & Balance plans –TCS test requirements being developed with Tom McCarthy –~3 additional TCS cases proposed –Cost & schedule impacts will be evaluated –TCS risk assessment and Qual test plan requested by GSFC Define GBA Static Load test requirements & plans –Detailed load cases & STE being developed Stress has performed another iteration on the load cases Loads have gone down and many cases are now Qual by analysis and other test cases will be combined

9 GLAST LAT ProjectMechanical Systems Open Flight Design Issues (cont) Radiator integration sequence –Coupon testing of repeated make & break of joint in process –Disassembly facilitated by use of mold release agent X-LAT MLI blanket billowing does not violate stay clear (Closed) Radiator MLI blanket and wiring violates stay clear –S/C to LAT MLI design options in work with Spectrum Astro Working group meeting held in Jan Radiator vibration requirements –Current proposal is pre & post low level sine sweep, sine vibe and Acoustic testing –Working with GSFC & LM to minimize & finalize requirements –Preliminary design of vibration test fixture complete. –Design concepts for Acoustic test fixture are next –Effort on hold

10 GLAST LAT ProjectMechanical Systems MECH Qualification Program

11 GLAST LAT ProjectMechanical Systems PMCS Mech Sys (SLAC only) cum schedule variance -$727K –Driven by late receipt of Grid #2, TCS hardware and Static Load Test did not start. –Will decrease each month as these are worked off Mech Sys (LM only) current cost variance -$317K, and Mech Sys (LM only) cum cost variance -$1,246K –LM is behind schedule and not on their headcount profile –LM has provided a spending profile for Jan – Mar to take them up to $7.5M –Investigating other testing options for Radiator and X-LAT plate

12 GLAST LAT ProjectMechanical Systems Program Threats Top threats to maintaining schedule –Grid Box is a pathfinder for Flight hardware operations in B33 –Highly compressed, success oriented schedule –LM X-LAT & Radiator delivery have no float and LM manufacturing is not maintaining their schedule Top threats to staying within cost –LM staying on schedule –LM maintaining headcount profile, esp. planned roll-off –SLAC staying on schedule –Interdependencies with DAQ for fab, assy & test of TCS