1 Stepping in everyone’s toes ( but for a good cause….) Eduardo do Couto e Silva Software Meeting – January 2001.

Slides:



Advertisements
Similar presentations
Tracker Subsystem1 GLAST LAT Project FM8/14 PSR, Oct. 5, 2005 GLAST LAT Tracker Towers 8/14 Pre-Ship Review INFN-Pisa.
Advertisements

Software Quality Assurance Plan
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 IOC – S.Williams SAS - R.Dubois 1 Instrument Operations Center (IOC) and Science.
GLAST LAT Project I&T Meeting – Jan 20,2004 E. do Couto e Silva 1 GLAST Large Area Telescope: EM1 Data Analysis and Calibration Summary Report Eduardo.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.31 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT Silicon Tracker Marcus ZieglerAPS April Meeting The GLAST Silicon Tracker Marcus Ziegler Santa Cruz Institute for Particle Physics University.
GLAST Large Area Telescope - OperationsDOE Review, 15 June GLAST Large Area Telescope Operations Review Rob Cameron Instrument Science Operations.
GLAST LAT ProjectOctober 14, 2002 Tracker, WBS GLAST Large Area Telescope: Tracker Subsystem WBS Engineering Meeting Tracker Engineering-Model.
GLAST LAT ProjectISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.1 Requirements 1 Gamma-ray Large Area Space Telescope GLAST Large.
GLAST LAT Project 1 Tracker “mini-tower” Full Size Calorimeter module Face to Face IDT meeting March 20, 2002 Convener: E. do Couto e Silva Engineering.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby1 Martin Nordby Stanford Linear Accelerator Center Stanford University.
GLAST LAT ProjectEGSE Peer Design Review, August 17, S. WilliamsEGSE Schedule and Cost Electrical Ground Support Equipment Schedule and Cost Scott.
GLAST LAT Project Engineering Meeting – ISOC Peer Review 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope ISOC Peer Review ISOC Detail.
GLAST LAT Project July 19, 2005 E. do Couto e Silva 1/17 Science Verification Analysis and Calibration GLAST Large Area Telescope Eduardo do Couto e Silva.
GLAST LAT Project Analysis Meeting March 22, 2004 E. do Couto e Silva 1/8 LAT Instrument Test Analysis Eduardo do Couto e Silva March 23, 2004.
Section 15-1GLAST Ground System Design Review August 18&19, 2004 ISOC Organization ISOC Manager R Cameron Commanding, H&S Timeline Planning Command Generation.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 4.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Section Gamma-ray Large Area Space Telescope GLAST Large Area Telescope ISOC Peer Review 7.2.
GLAST I&T January T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 7.1 Pre-launch Operation and Calibration 1 Gamma-ray Large Area Space.
GLAST LAT Project SE Test Planning meeting October 4, 2004 E. do Couto e Silva 1/13 SVAC Data Taking during LAT SLAC Oct 4, 2004 Eduardo.
GLAST Large Area Telescope - OperationsDOE Review, 15 June GLAST Large Area Telescope Operations Review Rob Cameron Instrument Science Operations.
Tracker Subsystem1 GLAST LAT Project FM6 PSR, July 21, 2005 GLAST LAT Tracker Tower6 Pre-Ship Review INFN-Pisa.
GLAST LAT Offline SoftwareWorkshop - SLAC, Jan , 2001 R.Dubois Lehman Review Feb Joint NASA/DoE review My understanding: –“The purpose of the.
GLAST LAT Project ISOC Subsystem1 Response to Peer Review RFA 6  Request: –Need to provide more information on the planned and actual staffing profiles.
GLAST LAT ProjectI&T PDR – Jan. 9, 2002 Gary Godfrey1 Integration and Test Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
Fermi Large Area Telescope (LAT) Integration and Test (I&T) Data Experience and Lessons Learned LSST Camera Workshop Brookhaven, March 2012 Tony Johnson.
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 K.Young 1 LAT Data Processing Facility Automatically process Level 0 data.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
Tracker Subsystem1 GLAST LAT Project Production Readiness Review, 25 August, 2004 GLAST LAT Tracker TOWER-A PRR TKR Tower Electrical Test Plan Luca Latronico.
Robotics & Engineering Design Projective Management Chin-Sung Lin Eleanor Roosevelt High School.
GLAST LAT ProjectI&T&C Pre PDR, October 2, 2001 E. do Couto e Silva1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
Luca Latronico - INFN Pisa DB requirements relevant info for subsystems integration implementation: custom or available products GLAST Ground Software.
GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai Integration and Test Organization Chart I&T Manager Elliott Bloom WBS
GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: On-Orbit Calibration and.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
1 Japan-US collaboration to develop the “End-to-End simulator” Tsunefumi Mizuno Mar 12, 2003.
GLAST LAT Project LAT Instrument Analysis Workshop – Feb 27, 2006 Hiro Tajima, TKR Data Processing Overview 1 GLAST Large Area Telescope: TKR Data Processing.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: EM Mini-Tower Robert Johnson.
Tasks and time scale T. Tsuboyama (KEK). DSSD production Test production by Micron and SINTEF (Talk by M. Valentan) HPK decided to restart DSSD business.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT ProjectI&T&C Pre PDR Presentation – Oct 2, 2001 B. Grist1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT Project IA Workshop 4 July 14, 2005 E. do Couto e Silva 1/7 Introduction to the Instrument Analysis Workshop 4 Eduardo do Couto e Silva July.
GLAST LAT ProjectSAS PDR, Aug. 17, 2001 R.Dubois1 Schedule Balloon Science Tools, Analysis Platforms Calibrations Performance Tuning, Tracking Data Production.
FNAL PM kick-off Meeting June 17, 2010 E. do Couto e Silva 1/11 SuperCMDS at SNOLAB Ge Towers System Requirements Eduardo do Couto e Silva
1 SUZAKU HUG 12-13April, 2006 Suzaku archive Lorella Angelini/HEASARC.
GLAST Large Area Telescope – ISOC Overview and StatusDOE Annual Review, 13 June GLAST Large Area Telescope Instrument Science Operations Center.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
Rainer Stamen, Norman Gee
GLAST Large Area Telescope Instrument Science Operations Center
I&T&C Organization Chart
GLAST Large Area Telescope:
Mini-Tower test results
Integration, Test, and Calibration
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
Gamma-ray Large Area Space Telescope
GLAST Large Area Telescope Instrument Science Operations Center
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Mini Tower Preliminary Results
Integration and Test Organization Chart
Introduction and Overview
Integration & Test Instrument Operations Coordination
GLAST Large Area Telescope Instrument Science Operations Center
GLAST Large Area Telescope: Deputy for Systems Engineering
Presentation transcript:

1 Stepping in everyone’s toes ( but for a good cause….) Eduardo do Couto e Silva Software Meeting – January 2001

2 LAT Performance/Calibration Ensure faultless operation of integrated hardware on GROUND prior to launch Test and verify hardware (including environmental testing) Provide support to validate tools and strategy developed for LAT on-orbit and offline calibration, monitoring and debugging Characterize the performance of the LAT via Instrument Response Functions and validate background estimations from Monte Carlo simulations. Develop in-house expertise (as much as possible) for backup needed in case subsystem’s schedules are compromised by unforeseen situations

3 Integration Subsystems Hardware/Software Integrated Hardware/Software Beam Tests Cosmic Ray Tests Calibration Science Database Database (s) ? Towers Monte Carlo On line/ off line reconstruction

4 Ground testing is part of the overall calibration plan (Let’s raise some issues…) What will be provided by subsytems (hardware/software) ? What is needed to ensure that upon delivery all subdetectors are working and how this info will be stored and used as a reference ? What will be needed at the tower(s) level from BTEM, BFEM, future tests beams and calibrations with cosmic rays ? How do we interface with on-line,offline reconstruction and Monte Carlo developments ? How to combine, maintain and update the information from different institutions and SLAC (database) ? What will be the our input to the data science software ?

5 Performance & Database The construction database will be continuously developed by the subsystems locally at their institutions and data will certainly be available on the web. How does one transfer only the relevant data needed for integration while keeping the possibility of searching and querying construction information in case problems appear ? Shall we have a central database ? If so, can we maintain it ?

6 Sensors Ladders Kapton Converter Cables MCM GTRC GTFE Trays … FILTER Dead channels Leakage current Local coordinates of strips Database Integration Detector Construction (subsystem level) Both sides must be able to search and query all information An example…

7 Database – What are we looking for ? (let’s plan for it) Shall handle needs for integration (future beam tests and cosmic ray tests). Shall interface with subsystems production database What will be the inputs to the in-flight calibration software? What will be the inputs to the off-line calibration software? What will be the inputs to the Science database

8 Instrument Response Functions ( on GROUND) 1.Monitor electrical properties of detectors and determine effects from temperature, vibrations and vacuum environment 2.Mechanical survey to obtain local spatial coordinates of sensitive elements and determine effects from temperature, vibrations and vacuum environment 3.Characterize performance as a function of angles (how many ?), energy (now many bins and how wide ?) and front/back sections of tracker (efficiencies?). What do the likelihood analyses need ? 4.Detailed program for study of background rejection with data and Monte Carlo simulation

9 Immediate Tasks 1.Define the group of people involved in integration and their roles (on the works by the GLAST management). 2.Define and build an integration database at SLAC with input from all subsystems (SCS is already ready to help–need green light). 3.Define tentative Instrument Response Functions (groundwork has been done by evaluation of science capabilities and by the integration engineers). 4.Define role of BTEM and BFEM data for integration to evaluate efforts needed for the software development (some groundwork done by the BTEM/BFEM groups). 5.Define minimum requirements for reconstruction and Monte Carlo simulations and prepare a working version with the GAUDI framework and GEANT4 (on the works by the software group).