SR NSLS prototype magnets. Dipoles 90 mm aperture dipole Pole Ends will be matched to achieve the magnetic field quality (1.5. 10 -4 )

Slides:



Advertisements
Similar presentations
Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment.
Advertisements

Daniel Schoerling TE-MSC-MNC 1 Review of AD-ELENA TL dipole Daniel Schoerling on behalf of WP 2.2 ELENA IIC meeting 27 th February 2014.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Electrical Issues John Escallier, NSLS-II Project To achieve high quality electrical characteristics for storage.
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
Dipole Magnets for NESR and RESR Gebhard Moritz GSI Darmstadt November 2004.
Isaac Vasserman Magnetic Measurements and Tuning 10/14/ I. Vasserman LCLS Magnetic Measurements and Tuning.
1 Zachary Wolf 1 Undulator Tuning Status June 9, 2009 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, D. Jensen,
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
Jim Stewart Tagger Magnet Design Review July 2009.
Magnet rotated by 5.9 degree Distance from entrance point to magnet right bottom corner m.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
SENSORS AND TRANSDUCERS
Zachary Wolf Undulator Oct 12, LCLS Undulator Tuning Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko,
Coil Manufacture, Assembly and Magnetic Calibration Facility for Warm and Cold Magnetic Measurements of LHC Superconducting Magnets CERN AT-MTM 1 / 21.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
April 24, 2008 FNAL ILC SCRF Meeting 1 Main Linac Superconducting Quadrupole V. Kashikhin, T. Fernando, J. DiMarco, G. Velev.
Angular orientation reconstruction of the Hall sensor calibration setup By Zdenko van Kesteren Supervisor: prof. dr. Frank Linde.
Single PET-module Design Update 1 TRIMAGE Meeting Munich, Dec. 12,2014 WP 3 Design and optimization of PET-system Andreas Seebacher, raytest.
H. Felice - P. Ferracin – D. Cheng 09/19/2013 Update on structure CAD model.
H. Felice - P. Ferracin – D. Cheng 09/11/2013 Update on structure CAD model.
1 Fourth Year Final Project - BGU HF Electromagnetic Vector Sensor Students: Roy Nevo, Yiftach Barash Advisors: Mr. Benny Almog Prof. Reuven Shavit
Task7: NUSTAR2 - Design and Prototype Construction of a Radiation-Resistant Magnet C. Mühle GSI Task leader: G. Moritz /GSI.
Ultra-Compact Electrical Machines for Wind Energy DE-FOA : Demo Machine C. L. Goodzeit and M. J. Ball May 1, 2014 Part 1: Design and Construction.
Scientific support Scientific laboratories have the qualified specialists in fields of accelerator physics and technique. They calculate and model the.
Permanent Magnet Quadrupoles for the CLIC Drive Beam Jim Clarke, Norbert Collomb, Neil Marks, James Richmond, and Ben Shepherd STFC Daresbury Laboratory,
1 Booster Corrector BPM Status AD/ Instrumentation Jim Fitzgerald.
Task7: NUSTAR2 - Design and Prototype Construction of a Radiation-Resistant Magnet C. Mühle GSI Task leader: G. Moritz /GSI.
Forum March 2003H.Taureg1 Magnetic Fields in ALICE Mapping and Monitoring.
BINP experience in magnet production Sample. Example of MLS Dipole modeling Number of magnets8 Bending angle, deg45 Bending radius, mm1528 Gap, mm50 ±
SCU1 Vertical Test Results Matt Kasa 9/16/2014. Vertical Cryostat Assembly Coil Training Record the current decay and the terminal voltage across the.
1 Magnetic measurements proposal of the FAIR magnets Magnetic Measurements of Super-FRS dipoles: budgets 1 Budget for dipoles ( ) document FAIR-SFRS-magnetic_measurement_EVM.xls.
Physical Science Spring Review Electricity and Magnetism.
STATUS REPORT ON DIPOLE MAGNETS FOR TRANSFER LINE-2 FOR CTF3 22 Jan 2008 S.S. PRABHU, A. K. JAIN & V. C. SAHNI RRCAT, INDORE (INDIA)
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
Low Energy RHIC e - Cooling Meeting Minutes – 11/5/14 1.Funding is available to purchase magnets. 2.Comment during presentation of attached slides: 180.
Bending Magnets for the Metrology Light Source
Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
An electron/positron energy monitor based on synchrotron radiation. I.Meshkov, T. Mamedov, E. Syresin, An electron/positron energy monitor based on synchrotron.
MQXF Workshop on Structure, Alignment, and Electrical QA Feb 2-4, 2016 Dan Cheng J. DiMarco, C. Hernikl, D. Humphries, S. Myers, X. Wang MQXFA Magnet Fiducialization.
NUMI Update on Steel, Coils, Fixtures, and Prototyping J.K. Nelson 12/98 MINOS Meeting.
Magnets Attilio Milanese Doing Business with CERN
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
HTS insert magnet design: Stack Cable Johnny Himbele, Arnaud Badel, Pascal Tixador 1.
Physics requirements  mapping spec’s Strategy: analyze measurements to get field Mapping plan: where/how to map Engineering design: sensor, fixtures,
Physics Requirements Sensitivity to Manufacturing Imperfections Strategy  where to map field  measure deviation from ideal model  fit to error tables.
Practical aspects of small aperture quadrupoles Dr Ben Leigh Tesla Engineering Ltd.
CERN –GSI/CEA MM preparation meeting, Magnetic Measurements WP.
Displacement, Location or Position Sensor Muhajir Ab. Rahim School of Mechatronic Engineering, KUKUM.
DDBA magnets Chris Bailey Low emittance rings Sept Frascati.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
MSE Pulsed Septum for g-2 and Mu2e Design Review A. Makarov 2/11/2016.
HTS and LTS Magnet Design and Prototyping for RAON
Magnetic Measurements At SLAC
Tutorial On Fiducialization Of Accelerator Magnets And Undulators
Iranian Light Source Facility, IPM, P.O. Box , Tehran, Iran
6th BINP-FAIR-GSI Workshop,
The design schemes of the low field dipole magnets
EFREMOV INSTITUTE SAINT PETERSBURG RUSSIA
Magnetic Measurements For The LCLS Undulator System
Introduction of MEMSIC Magnetic Sensor Solution
Main magnets for PERLE Test Facility
Pierre-Alexandre Thonet
LCLS Undulator Fiducialization
as a prototype for Super c-tau factory
Undulator Tuning Status
CEPC Collider Magnets CHEN, Fusan November 13, 2018.
Breakout Session SC3 – Undulator
LCLS Undulator Magnetic Measurements
Magnetic measurements at ambient temperature on the MQXFBP1
Presentation transcript:

SR NSLS prototype magnets

Dipoles 90 mm aperture dipole Pole Ends will be matched to achieve the magnetic field quality ( )

Dipoles Pole Ends will be matched to achieve the magnetic field quality ( ) and equivalent magnetic field integrals (relative to 90 mm aperture dipoles) 35 mm aperture dipole

Dipoles 90 mm aperture dipole Number of magnets8 Bending angle, deg45 Bending radius, mm1528 Gap, mm50 ± 0.02 Field range, Tup to 1.5 Good field area, mm 2 60 x 36 Homogeneity dB/B  2.5x10 -4 Stabolit 70 Stabolit 20

Dipoles

90 mm aperture dipole Magnetic field in gap

Dipoles..\..\..\NSLS SR tender\out documents\dipole\main info\Attachment 3 (Dipoles_technological equipments).doc Magnetic measurement The carriage with the Hall sensors (1 – the temperature sensor, 2 – the Hall sensors, 3 –the NMR probe) The carriage with Hall sensors in the guide mounted in the magnet aperture Parameters  B /B  I /I Geometry-dependent errors (orientation of the sensors in the carriage plane, alignment of the guide relative to the magnet, errors caused by the carriage transportation mechanism) Time instability of *: The feed current of the magnets The feed current of the Hall sensors Temperature instability Accuracy of calibration of the Hall sensors Noise of the electronics Resultant errors of the measurements The accuracy of the magnetic measurements.

Dipoles Stamping toolEnd glue pack Views of CMM Contura

Dipoles The stacking fixture during assembly. The stacking fixture with yoke

Dipoles Yoke with reference surface plate inside the stacking fixture Yoke with face plates inside the stacking fixture.

Dipoles Yoke face Yoke back

Dipoles Yoke bottom Dipole aperture views

Common Water and electrical connections and terminals - Water tubes from plastic radiation resistance plastic / metallic tubes - Radiation resistance of materials used for magnets -Tubes & manifolds - Coils (SLAC technology with Alumina insertion) - insulators (supports, electrics, Documentation