Previous Week’s Goals Status Goal Status Narrow down materials through 98% Complete testing (all) Continue to learn Inventor In Process TestingIn Process
Design Analysis/Testing Results From Testing Back wall set to 4.5” Gap between rollers at 5.25” Plastic wheel rollers show the most promise
Prototypes Proto-type # 3 Adjustments leading up to prototype 4 Angles within grabber Materials on rollers Power supplied
Prototypes Grip Tape Roller Rubber Bike Tube Roller Plastic Wheel Roller
Manufacturing & Assembly Bevel gear proof of concept Polycarbonate guardsTroy tapping holes
CAD/Drawings Angled Main Rollers Assembly Alternative View
CAD/Drawings
Next Week: Goals Ongoing- Continue to machine parts for the final grabber design(All) Thursday- finished practice roller assembly (All) Continue to learn inventor (Mr. Fox)
Questions?