Ronald Lipton Layer 0 Status PMG Sep 7 2004 Status of the Layer 0 Project – emphasis on hardware status, preproduction, and preparations for shutdown work.

Slides:



Advertisements
Similar presentations
23-Aug-2005 VELO Production UCD VELO Module Production at Liverpool T. Bowcock.
Advertisements

HFT Technical Overview September 26, HFT 2013 TPC FGT 2011 STAR Detectors Fast and Full azimuthal particle identification EMC+EEMC+FMS (-1 ≤ 
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Vacuum Vessel Production Readiness Review
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
MICE Target Status Chris Booth Sheffield 10 th May 2006.
LHCC referees meeting, 10 October 2005Børge Svane Nielsen, NBI1 Status of the FMD LHCC referees meeting, 10 October 2005 Børge Svane Nielsen Niels Bohr.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
Mechanical Work Plan Discussion Bill Cooper Fermilab.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
Silicon RunIIb Workshop, Dec , A. Bean, M. Demarteau Slide 1 Workshop  Workshop is to “Move beyond the Technical Design Proposal”  Many.
Director’s Review Dec 1999 Tracker Integration and Installation W. E. Cooper 6 December 1999.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
SSD Status Report July SSD Status Report accessible from STAR group documents Pictures Updated documentation.
PMG, June 15, 2000 Slide 1 Schedule Started ! Done Late Done Done(today)
Thomas Jefferson National Accelerator Facility Page 1 SVT – Review January Sensors for the Silicon Vertex Tracker Amrit Yegneswaran.
Abe Seiden December 2003 SCT Week S USA SCT Barrel Module Assembly SCT Week CERN December 2003 Presented by Abe Seiden U.C. Santa Cruz.
Fred Nobrega, Nikolai Andreev 21 September, 2015.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
DOE Rev of Run IIb Sep 24-26, Detector Production WBS James Fast Fermilab.
R. Lipton, Director’s Installation Review Oct 25, 2005 Layer 0 Preparations Layer 0 assembly was completed Aug 1 The overall quality of the detector is.
Design Discussion of Mechanical / Electrical Interfaces Bill Cooper (Fermilab) (Layer 1) VXD.
The Inclusive (Measurement ) FVTX aka iFVTX sponsored by LANL-DR in FY ‘06-08 FPIX Chip Module/Hybrid Testcard Pixel Plane Assembly/Integration.
8 July 1999A. Peisert, N. Zamiatin1 Silicon Detectors Status Anna Peisert, Cern Nikolai Zamiatin, JINR Plan Design R&D results Specifications Status of.
PMG, Aug 03, 2000 Slide 1 Schedule In preparation Done Started Done Started Half done.
FVTX Review, November 17th, FVTX Mechanical Status: WBS 1.6 Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
Tevatron II: the world’s highest energy collider What’s new?  Data will be collected from 5 to 15 fb -1 at  s=1.96 TeV  Instantaneous luminosity will.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
CDF Japan Meeting, Dec 13-14, Run2b Silicon Detector - Overview K. Hara U of Tsukuba Project Status Sensor Prototype: Delivery Testing at U Tsukuba.
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
A.Nomerotski,2/3/ Layer0 Status Andrei Nomerotski 2/3/2005 Outline  Introduction  Module Production  Assembly of Layer0  Electronics  System.
LAV construction: Status and overview Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting Brussels, 8 September.
TOB meeting, TOB meeting 20 September 2005, Antti Onnela: TOB mechanical integration status and plans n TST-TOB-TIB integration exercise n.
D. Greenfield CLRC1 UK-V End-cap Engineering 15 July 2003 Debbie Greenfield, RAL.
Run Iib Workshop Dec 12-13, 2002 Silicon sensors procurement and quality assurance WBS Regina Demina Kansas State University.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
SiD Vertex Detector Mechanical R&D (May Apply to Other Concepts) Bill Cooper Fermilab.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
NUMI Flexible Joint/Floating Clamp WBS Power Supply System Level 3 Manager Nancy Grossman FNAL July 10, 2001.
R. Lipton Vertex ‘98 Santorini, Greece The D0 Silicon Microstrip Tracker (D0SMT) Outline  Design  Detector Studies Coupling capacitors Radiation Damage.
Run2b Silicon Detector Design goals of Run2b Si system Stave design Silicon sensors Schedule K. Hara (U. Tsukuba)
Pixel Pilot system Hardware Status Simon Kwan August 28, 2012 CMS Pixel Upgrade Workshop, Grindelwald1.
D0 PMG, May 04, 2000 Slide 1 Schedule DØ SMT Status Report.
MPI/ATLAS H.-G. Moser MPI, Munich Detector Status Delivered: 86% IV measured: 58% + Visual insp.: 39% fail : ~5%
A New Inner-Layer Silicon Micro- Strip Detector for D0 Alice Bean for the D0 Collaboration University of Kansas CIPANP Puerto Rico.
Physics Requirements Sensitivity to Manufacturing Imperfections Strategy  where to map field  measure deviation from ideal model  fit to error tables.
Steinar Stapnes, LHCC June The ATLAS inner detector TRT endcap A+B TRT endcap C TRT barrel SCT barrel SCT endcap Pixels uWhole ID sits inside bore.
Origami and Cooling 24th September 2012 C. Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
TF Fabrication Progress is being made on TF bundle fabrication activities but the schedule remains tight. All 24 outer conductors have been machined but.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
EUDET HCAL prototype; mechanics Felix Sefkow Work by K.Gadow, K.Kschioneck CALIC collaboration meeting Daegu, Korea, February 20, 2009.
QXF Coil Fabrication & Tooling Reaction / Impregnation
Design of the He and HB ODU
Radiation Laboratory Meeting
FNAL Production Experience
Limited Streamer Tube Project Summary
Presentation transcript:

Ronald Lipton Layer 0 Status PMG Sep Status of the Layer 0 Project – emphasis on hardware status, preproduction, and preparations for shutdown work Parts Status Pre-production modules Survey Conclusion

Ronald Lipton Parts Status Sensors –Received 112 of 120 ordered ~July 31 (8 others in ~Nov) –All IV, CV tested at FNAL – 3 out of spec due to large  I/  V. Will be used for prototypes –No bad channels ! (spec 1%) –Four sensors sent to StonyBrook for strip probing –Will irradiate test structures plus a sensor at KSU Analog Cables –Received and tested mid-July – look very good Fixtures –Most now received from MSU - detailing the last sets this week

Ronald Lipton Parts Status Pitch Adapters –Received 13 (71  m) + 34 (81  m) pitch adapters from TFT mid August (ordered 50+50, need 24+24). We require 100% good lines and the yield is low. –TFT overall quality is ~ok, wirebond strengths 6-7 grams. Expect to receive order of from TFT Seigert Sept. 10 th. We will then decide if we need to press for the remainder of the TFT order. Hybrids –Received 119/120(ordered) last Thursday 69 should meet all specs 50 cut 8 mils long – should be OK –Will stuff 10 at SiDet to check functionality and for use in prototype modules

Ronald Lipton Support Structure A prototype support structure to be used for electrical testing was received Aug 11. Mechanical damage was noted when the part was unpacked. The structure was broken at z=0 and one of the sensor-hybrid joints. The part was packed in a cardboard tube surrounded by bubble wrap inside a ~8” diameter ABS plastic tube. –The outer tube was permanently deformed with a sagitta of ~1” – this corresponds to hundreds of pounds of force if the cylinder is simply supported The ABS tube was not sufficiently rigid to withstand the load. The bubble wrap was too rigid and transmitted the bend to the inner cylinder – Bad packing design. The structure was repaired by injecting epoxy into the cracked areas – can be used for electrical tests

Ronald Lipton Boroscope image of crack region

Ronald Lipton Support Structure The shipping problems should not delay the final structure New inner mandril is being machined using low stress steel Need to fabricate the (complex) manifold structures Expect on-time delivery (Mid Oct) of final support structure –Well off the critical path Most other mechanical parts in hand –Mesh spacers, ceramic standoffs …. Cables are being fabricated –Digital junction cable ordered –Twisted pair cable received

Ronald Lipton Modules We now have all parts necessary for modules. Plan: Build a set of four 71 micron pitch modules to populate a segment of the prototype support cylinder for a full wedge electrical test. These will be built with the final fixtures We will then decide if we want more prototypes for testing 71/81 stack or can go into final module production (beginning to mid October) First Prototype module built last week: Bias current V (Depletion voltage 200 V) Noise ~ V 32 0 V Bonding problems

Ronald Lipton Fall 2004 Shutdown Survey of the Z=0 gap (more later) We plan to install and operate a 4-hybrid SVX4 string during the 2004 shutdown. This will allow us to test a mixed SVX2/4 readout system with the associated controls and download software. Reroute H disk cables to accommodate L0 requirements (separate inner and outer) Operate the cooling system at lower temperature No H disk refurbishment The work associated with floating the platform was deemed to take too much time to allow for this work

Ronald Lipton Aperture Measurement We plan to measure the aperture at z=0 using standard survey instruments (Brunson) This was mocked up in Lab 3

Ronald Lipton

Beam Pipe and Inner Disk

Ronald Lipton Lab 3 Test Membranes to simulate those of the Run 2a support structure were located at the following nominal z-positions in mm (inches): –+/ (0.012) –+/ (21.294) –+/ (32.670) All apertures were nominally 1.875” in diameter. Those at z = 0 were nominally offset horizontally by 0.062”. A simulated 96” long beam tube with a flange diameter =1.697” extended through the simulated Run 2a structure. A pair of external CF cylinders blocked light and access Cardboard sheets were used to represent the ends of the L1-4 structure. A Brunson survey instrument was used for the measurements. We found that a ROI light source for a CMM provided good illumination. All Brunson images were clear and distinct, with no color bands

Ronald Lipton Aperture Measurement A 0.059” membrane offset was measured using the Brunson, compared to 0.060” measured on a CMM The technique works but there must be proper illumination and support for the survey instruments The inner H disks do not have to be removed for the survey. Removing the outer disks would make the survey easier because of the limited space between the beam pipe and the H disk cover. We have decided to try the survey without removing the outer H disks – but will be prepared to remove and reinstall them if necessary. Expect to begin this work ~ Sept. 27

Ronald Lipton Layer 0 Summary All parts ~in hand –Need to stuff and test hybrids –Need to receive Seigert pitch adapters –Verify performance of new hybrids We will survey the installation gap during the shutdown We will install 4 SVX4 test strings and recable the H disk readout – this will give us operational experience with a mixed system and force us to develop and test software. Expect to begin module production in late October – depending on hybrid stuffing schedule On or ahead of schedule for July 21 move date with ~6 weeks of SiDet testing