LQS03 Readiness Review, Feb 21, 2012Introduction – G. Ambrosio 11 Introduction Giorgio Ambrosio LQS03 Readiness Review LBNL February 21, 2012 BNL - FNAL.

Slides:



Advertisements
Similar presentations
LM dipole status & plans – Fred Nobrega 1 Long Quadrupole (LQ) Workshop, February 7-9, 2007 BNL - FNAL - LBNL - SLAC Long Dipole Mirror (LM) Status and.
Advertisements

LQ & LM Status & Plan for FY08 – Fred Nobrega 1 LARP Collab. Meeting – SLAC, Oct , 2007 BNL - FNAL - LBNL - SLAC Long Quadrupole (LQ)-Long Dipole.
BNL - FNAL – LBNL - SLAC US LHC Accelerator Research Program LQ Reaction/Impregnation DR’s & Travelers at FNAL CM15 Magnet Systems Working Groups HQ Coils.
LARP MSM Conductor, Cable and Procurement - A. Ghosh1 Strand, Cable and Procurement BNL -FNAL - LBNL - SLAC Magnet Systems Meeting Jan 09, 2014.
DOE Review of LARP – February 17-18, 2014 Overview and Responses to Recommendations Giorgio Ambrosio 2/17/14 1.
Racetrack Coil Technology – G. Ambrosio 1 LARP DOE review – FNAL, June. 5-6, 2007 BNL - FNAL - LBNL - SLAC Racetrack Coil Technology (LR, SQ) & other Supporting.
Helene Felice Joint LARP CM20 / Hilumi Meeting April 8 th to 10 th 2013 Napa, CA, USA HQ02 Assembly summary and Next steps.
ASC 2012, 10/10/2012Test results and analysis of LQS03 – G. Ambrosio 1 BNL - FNAL - LBNL - SLAC Test Results and Analysis of LQS03 Third Long Nb 3 Sn Quadrupole.
Nb3Sn Cable and Insulation for LARP High-Gradient Quadrupole Magnets
Long Racetrack (LR) strategy – G. Ambrosio 1 LARP DOE review - FNAL, June 12-14, 2006 BNL - FNAL - LBNL - SLAC OUTLINE: LR R&D goals & plans Long Racetrack.
BNL - FNAL - LBNL - SLAC Long Quadrupole Results & Status Giorgio Ambrosio Fermilab Task Leaders: Fred Nobrega (FNAL) – Coils Jesse Schmalzle (BNL) – Coils.
IR Quad Cost Estimate Status Marc Kaducak 02-Nov-2012 IR Quad Cost Estimate - M. Kaducak1.
Collaboration Mtg, St Charles, IL 10/5-6, 2005 A. Ghosh1 Conductor R&D Plan Arup K. Ghosh BNL.
LQ Goals and Design Study Summary – G. Ambrosio 1 LARP Collab Mtg – SLAC, Oct , 2007 BNL - FNAL - LBNL - SLAC LQ Goals & Design Summary Giorgio Ambrosio.
AARD Sub-panel at Fermilab Feb , 2006 LARP Magnet R&D Program - S. Gourlay1 BNL -FNAL - LBNL - SLAC LARP Magnet R&D Program Steve Gourlay AARD Sub-Panel.
QXF Cable Status D.R. Dietderich Conductor Working Group Video Meeting, Sept. 17, 2014.
LQ status and plans – G. Ambrosio 1 LARP Collaboration Meeting - LBNL, April , 2006 BNL - FNAL - LBNL - SLAC OUTLINE: Goals, Input and Output Sub-tasks.
HiLumi-LHC / LARP Conductor and Cable Internal Review October 16 th and 17 th 2013 H. Felice LARP Short Magnets Fabrication and Test experience relevant.
BNL - FNAL - LBNL - SLAC Design and Test of the 1 st Nb 3 Sn Long Quadrupole by LARP Giorgio Ambrosio Fermilab Acknowledgement: many people contributed.
Plans and schedule for QXF Giorgio Ambrosio and Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013 The HiLumi LHC Design.
ASC 2012Nb 3 Sn IR Quadrupoles for HL-LHC – G. Sabbi 1 Nb 3 Sn IR Quadrupoles for HL-LHC BNL - FNAL - LBNL - SLAC GianLuca Sabbi for the US LHC Accelerator.
Title – xxxx 1 LARP & US-HiLumi Contribution to the Inner Triplet Quadrupoles G. Ambrosio Cost and Schedule Review CERN, March 9 th -11 th 2015.
BNL - FNAL - LBNL - SLAC Progress Report on LQ Program Giorgio Ambrosio Fermilab Task Leaders: Fred Nobrega (FNAL) – Coils Jesse Schmalzle (BNL) – Coils.
11 T Dipole Informal Coil and Assembly Readiness Review CERN September 2013 Review committee: Herman Ten Kate CERN (Chair) Fred Nobrega FNAL Davide.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
HL-LHC/LARP: International Review of the Inner Triplet Quadrupole (MQXF) Design Executive Committee Report International Review Committee held at CERN.
LQ03 Titanium Pole Length Study Fred Nobrega LQ Collaboration Video Meeting June 27, 2008 BNL - FNAL - LBNL - SLAC.
LQ Quench Protection – G. Ambrosio 1 LQ DS video Mtg – May. 23, 2007 BNL - FNAL - LBNL - SLAC Long Quadrupole Quench Protection Giorgio Ambrosio LQ DS.
Helene Felice 11/16/2011 LARP Collaboration Meeting 17 1 st HiLumi Collaboration Meeting CERN Status on HQ Coil Design and Fabrication.
LARP Magnets FNAL contribution to LARP (LHC Accelerator Research Program) FNAL core-program support to LARP DOE Annual Program Review - May 16-18, 2006.
TD/MSD REVIEW CHARGE AND AGENDA Clas12 Torus CCM Production Readiness Review –Dec 4, 2013.
Conductor Review Oct 16-17, 2013LARP Strand :Specs. Procurement, Measurement- A. Ghosh1 LARP Strand: Specifications, Procurement and Measurement Plans.
Long Quadrupole – G. Ambrosio 1 LARP Collaboration Meeting – FNAL, Oct , 2008 BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio LARP Collaboration.
Dan Cheng, Helene Felice HL-LHC Standards and Best Practices Workshop June 11-13, 2014 The US LARP Collaborative Effort Magnet Design and Engineering Tools,
LARP CM17, 11/16/2011Magnet Systems Overview – G. Sabbi 1 Magnet Systems Overview GianLuca Sabbi LARP Collaboration Meeting 17 November 16, 2011 BNL -
US-side contributions to the EUCARD2 collaboration Planning video meeting May 16, 2013.
MQXFS Coil V1 Fabrication Status -Winding and Curing Miao Yu
Overview short model design and structures P. Ferracin on behalf of the MQXF collaboration MQXF Workshop on Structure, Alignment, and Electrical QA CERN.
SQXF1 End Parts Mini Review G. Ambrosio and P. Ferracin October,
MQXF Short model and prototype plans P. Ferracin, G. Ambrosio HL-LHC/LARP International Review of the MQXF Design December 10-12, 2014 CERN.
Bi-2212 cable transverse pressure tests in Twente A. Godeke, J. Jiang, E.E. Hellstrom, D.C. Larbalestier – MS&T & ASC – NHMFL - FSU L.D. Cooley, T. Shen.
QXF protection meeting, 4/29/14HQ High Miits Study – H. Bajas, G. Sabbi 1 HQ02 High MIITs Studies Preliminary findings and next steps Hugo Bajas, GianLuca.
Helene Felice Joint LARP CM20 / Hilumi Meeting April 8 th to 10 th 2013 Napa, CA, USA HQ02 Assembly summary and Next steps.
LARP Review, June 10, 2013Magnet Cost and Schedule – M. Kaducak 1 IR Quadrupole Cost and Schedule Marc Kaducak LARP Review June 10, 2013.
S. Caspi, LBNL HQ Magnet Program Shlomo Caspi LBNL LARP DOE Review FNAL June 1-2, 2011 BNL Jesse Schmalze Mike Anarella Peter Wanderer Arup Gosh FNAL Rodger.
BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio Fermilab Long Quadrupole Task Leaders: Fred Nobrega (FNAL) – Coils Jesse Schmalzle (BNL) – Coils.
LARP DOE Review, 7/9/2012Long Quadrupole – G. Ambrosio 1 Long Quadrupole Program Giorgio Ambrosio DOE Review of the LARP Program SLAC July 9-10, 2011 LQ.
BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio Fermilab Many people contributed to this work, most of all the Long Quadrupole Task Leaders:
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 Quench Protection of Long Nb 3 Sn Quads Giorgio Ambrosio Fermilab.
BNL - FNAL - LBNL - SLAC 6m (and 8m) scale-up Giorgio Ambrosio Fermilab Contributions from: Fred Nobrega, Rodger Bossert, Guram Chlachidize (FNAL) Jesse.
LARP Collaboration Meeting 15 Nov 1-3, 2010 A2C- Materials Working Group Arup Ghosh (coordinator), Emanuela Barzi, Dan Cheng, Dan Dietderich, Soren Prestemon,
LHQ Coil Design and Features Miao Yu Fermilab May 09, 2012.
LARP CM15, SLAC, 11/3/2010GianLuca SabbiSummary of MS Parallel Sessions Summary of Magnet Systems Parallel Sessions GianLuca Sabbi LARP Collaboration Meeting.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
LQS01a Test Results LARP Collaboration Meeting 14 Fermilab - April 26-28, 2010 Guram Chlachidze.
Helene Felice With input from Dan C, Maxim… Possible options for coil wiring.
LARP CM15, SLAC, 11/1/2010GianLuca SabbiMagnet R&D Plans Magnet R&D Plan for GianLuca Sabbi LARP Collaboration Meeting 15 SLAC, November 1 st,
LARP DOE Review July 13-14, 2009Materials – Conductor Support - A. Ghosh1 LARP DOE Review July , 2009 FNAL 2.4 Materials – Conductor Support Arup.
LARP Collaboration Meeting 15 Nov 1-3, 2010 Conductor Procurement and Qualification Arup K. Ghosh (BNL) bnl - fnal- lbnl - slac US LHC Accelerator Research.
P. Ferracin on behalf of the MQXF collaboration
QXF Coil Fabrication & Tooling Reaction / Impregnation
2K Cold Box PDR Introduction
MQXF Goals & Plans G. Ambrosio MQXF Conductor Review
Discussion session on day 1
P. Ferracin and G. Ambrosio
Paolo Ferracin, Giorgio Ambrosio
Course Schedule Day 1 Day 2 8:00 AM - 9:30 AM 9:30 AM - 9:45 AM
Course Schedule Day 1 Day 2 8:00 AM - 9:30 AM 9:30 AM - 9:45 AM
Daniel Chávez A NbTi Cable-in-Conduit conductor for the
Course Schedule Day 1 Day 2 8:00 AM - 9:30 AM 9:30 AM - 9:45 AM
Presentation transcript:

LQS03 Readiness Review, Feb 21, 2012Introduction – G. Ambrosio 11 Introduction Giorgio Ambrosio LQS03 Readiness Review LBNL February 21, 2012 BNL - FNAL - LBNL - SLAC

LQS03 Readiness Review, Feb 21, 2012Introduction – G. Ambrosio 22 Charge Goals: Evaluate the readiness of coils, structure, assembly and test plan for LQS03 Committee: G. Ambrosio, H. Felice, A. Ghosh. Location: LBNL video-meeting room BNL and FNAL through video-mtg link IP#: (back-up#: ) Date and Time: February 21, 2012 from 8:30am to 2:30pm (Pacific Time) Link to talks: Format: Internal review; everybody is invited to ask questions and make comments.

LQS03 Readiness Review, Feb 21, 2012Introduction – G. Ambrosio 33 Agenda (Pacific time)  Introduction and charge o Time: 8:30-8:40 (Giorgio Ambrosio)  Conductor: strands, cabling, insulation, and witness samples o Time: 8:40-9:00 (Dan Dietderich) o Time: 9:00-9:20 (Arup Ghosh) o Time: 9:20-9:40 (Vito Lombardo)  Coffee break: 9:40-10:00  Coils: fabrication data and tests – Coils #15, #17, and #19. o Time: 10:00-10:30(Fred Nobrega)  Coils: fabrication data and tests – Coils #16 and #18. o Time: 10:30-11:00(Jesse Schmalzle)  Coils: All coils qualification tests and heater connections o Time: 11:00-11:30(Ray Hafalia, Maxim Martchevskii)  Discussion of conductor and coils data o Time: 11:30-12:00  Lunch: 12:00-1:30  Structure and assembly plans o Time: 1:30-2:00pm (Helene Felice)  Test preparation and test plan o Time: 2:00-2:30pm(Guram Chlachidze)