GridPP11 Liverpool Sept04 SAMGrid GridPP11 Liverpool Sept 2004 Gavin Davies Imperial College London.

Slides:



Advertisements
Similar presentations
GridPP July 2003Stefan StonjekSlide 1 SAM middleware components Stefan Stonjek University of Oxford 7 th GridPP Meeting 02 nd July 2003 Oxford.
Advertisements

B A B AR and the GRID Roger Barlow for Fergus Wilson GridPP 13 5 th July 2005, Durham.
Physics with SAM-Grid Stefan Stonjek University of Oxford 6 th GridPP Meeting 30 th January 2003 Coseners House.
CMS Applications Towards Requirements for Data Processing and Analysis on the Open Science Grid Greg Graham FNAL CD/CMS for OSG Deployment 16-Dec-2004.
Amber Boehnlein, FNAL D0 Computing Model and Plans Amber Boehnlein D0 Financial Committee November 18, 2002.
Rod Walker IC 13th March 2002 SAM-Grid Middleware  SAM.  JIM.  RunJob.  Conclusions. - Rod Walker,ICL.
Grid and CDB Janusz Martyniak, Imperial College London MICE CM37 Analysis, Software and Reconstruction.
Oxford Jan 2005 RAL Computing 1 RAL Computing Implementing the computing model: SAM and the Grid Nick West.
F Fermilab Database Experience in Run II Fermilab Run II Database Requirements Online databases are maintained at each experiment and are critical for.
JIM Deployment for the CDF Experiment M. Burgon-Lyon 1, A. Baranowski 2, V. Bartsch 3,S. Belforte 4, G. Garzoglio 2, R. Herber 2, R. Illingworth 2, R.
18 Feb 2004Computing Division Project Status Report1 Project Status Report : SAMGrid  SAMGrid Management, Status, Operations – Merritt  SAMGrid Development.
The SAM-Grid Fabric Services Gabriele Garzoglio (for the SAM-Grid team) Computing Division Fermilab.
F Run II Experiments and the Grid Amber Boehnlein Fermilab September 16, 2005.
Grid Job, Information and Data Management for the Run II Experiments at FNAL Igor Terekhov et al (see next slide) FNAL/CD/CCF, D0, CDF, Condor team, UTA,
SAMGrid – A fully functional computing grid based on standard technologies Igor Terekhov for the JIM team FNAL/CD/CCF.
High Energy Physics At OSCER A User Perspective OU Supercomputing Symposium 2003 Joel Snow, Langston U.
The SAMGrid Data Handling System Outline:  What Is SAMGrid?  Use Cases for SAMGrid in Run II Experiments  Current Operational Load  Stress Testing.
Remote Production and Regional Analysis Centers Iain Bertram 24 May 2002 Draft 1 Lancaster University.
Grid Job and Information Management (JIM) for D0 and CDF Gabriele Garzoglio for the JIM Team.
03/27/2003CHEP20031 Remote Operation of a Monte Carlo Production Farm Using Globus Dirk Hufnagel, Teela Pulliam, Thomas Allmendinger, Klaus Honscheid (Ohio.
November 7, 2001Dutch Datagrid SARA 1 DØ Monte Carlo Challenge A HEP Application.
Building a distributed software environment for CDF within the ESLEA framework V. Bartsch, M. Lancaster University College London.
CDF Grid Status Stefan Stonjek 05-Jul th GridPP meeting / Durham.
Deploying and Operating the SAM-Grid: lesson learned Gabriele Garzoglio for the SAM-Grid Team Sep 28, 2004.
28 April 2003Lee Lueking, PPDG Review1 BaBar and DØ Experiment Reports DOE Review of PPDG January 28-29, 2003 Lee Lueking Fermilab Computing Division D0.
3rd June 2004 CDF Grid SAM:Metadata and Middleware Components Mòrag Burgon-Lyon University of Glasgow.
CHEP 2003Stefan Stonjek1 Physics with SAM-Grid Stefan Stonjek University of Oxford CHEP th March 2003 San Diego.
- Iain Bertram R-GMA and DØ Iain Bertram RAL 13 May 2004 Thanks to Jeff Templon at Nikhef.
1 st December 2003 JIM for CDF 1 JIM and SAMGrid for CDF Mòrag Burgon-Lyon University of Glasgow.
SAMGrid “Addendum” Adam Lyon GDM / April 18, 2006.
Jan. 17, 2002DØRAM Proposal DØRACE Meeting, Jae Yu 1 Proposal for a DØ Remote Analysis Model (DØRAM) IntroductionIntroduction Remote Analysis Station ArchitectureRemote.
SAMGrid as a Stakeholder of FermiGrid Valeria Bartsch Computing Division Fermilab.
SAM and D0 Grid Computing Igor Terekhov, FNAL/CD.
Instrumentation of the SAM-Grid Gabriele Garzoglio CSC 426 Research Proposal.
GridPP18 Glasgow Mar 07 DØ – SAMGrid Where’ve we come from, and where are we going? Evolution of a ‘long’ established plan Gavin Davies Imperial College.
DØ Computing Model & Monte Carlo & Data Reprocessing Gavin Davies Imperial College London DOSAR Workshop, Sao Paulo, September 2005.
Stuart Wakefield Imperial College London Evolution of BOSS, a tool for job submission and tracking W. Bacchi, G. Codispoti, C. Grandi, INFN Bologna D.
Status of the LHCb MC production system Andrei Tsaregorodtsev, CPPM, Marseille DataGRID France workshop, Marseille, 24 September 2002.
22 nd September 2003 JIM for CDF 1 JIM and SAMGrid for CDF Mòrag Burgon-Lyon University of Glasgow.
Dzero MC production on LCG How to live in two worlds (SAM and LCG)
16 September GridPP 5 th Collaboration Meeting D0&CDF SAM and The Grid Act I: Grid, Sam and Run II Rick St. Denis – Glasgow University Act II: Sam4CDF.
4 March 2004GridPP 9th Collaboration Meeting SAMGrid:JIM and CDF Development CDF Accepts the Need for the Grid –Requirements How to Meet the Need –Status.
1 DØ Grid PP Plans – SAM, Grid, Ceiling Wax and Things Iain Bertram Lancaster University Monday 5 November 2001.
The Experiments – progress and status Roger Barlow GridPP7 Oxford 2 nd July 2003.
Data reprocessing for DZero on the SAM-Grid Gabriele Garzoglio for the SAM-Grid Team Fermilab, Computing Division.
Run II Review Closeout 15 Sept., 2005 FNAL. Thanks! …all the hard work from the reviewees –And all the speakers …hospitality of our hosts Good progress.
19 February 2004SAMGrid Project Review SAMGrid: Future Plans CDF Accepts the Need for the Grid –Requirements D0 Relies on the Grid –Requirements How to.
DCAF (DeCentralized Analysis Farm) Korea CHEP Fermilab (CDF) KorCAF (DCAF in Korea) Kihyeon Cho (CHEP, KNU) (On the behalf of HEP Data Grid Working Group)
Feb. 14, 2002DØRAM Proposal DØ IB Meeting, Jae Yu 1 Proposal for a DØ Remote Analysis Model (DØRAM) Introduction Partial Workshop Results DØRAM Architecture.
Frank Wuerthwein, UCSD Update on D0 and CDF computing models and experience Frank Wuerthwein UCSD For CDF and DO collaborations October 2 nd, 2003 Many.
The GridPP DIRAC project DIRAC for non-LHC communities.
Run II Review Closeout 15 Sept., 2004 FNAL. Thanks! …all the hard work from the reviewees –And all the speakers …hospitality of our hosts Good progress.
Grid Job, Information and Data Management for the Run II Experiments at FNAL Igor Terekhov et al FNAL/CD/CCF, D0, CDF, Condor team.
Feb. 13, 2002DØRAM Proposal DØCPB Meeting, Jae Yu 1 Proposal for a DØ Remote Analysis Model (DØRAM) IntroductionIntroduction Partial Workshop ResultsPartial.
Distributed Physics Analysis Past, Present, and Future Kaushik De University of Texas at Arlington (ATLAS & D0 Collaborations) ICHEP’06, Moscow July 29,
DZero Monte Carlo Production Ideas for CMS Greg Graham Fermilab CD/CMS 1/16/01 CMS Production Meeting.
The GridPP DIRAC project DIRAC for non-LHC communities.
Victoria A. White Head, Computing Division, Fermilab Fermilab Grid Computing – CDF, D0 and more..
DBS Monitor and DAN CD Projects Report July 9, 2003.
SAM architecture EGEE 07 Service Availability Monitor for the LHC experiments Simone Campana, Alessandro Di Girolamo, Nicolò Magini, Patricia Mendez Lorenzo,
CDF SAM Deployment Status Doug Benjamin Duke University (for the CDF Data Handling Group)
Apr. 25, 2002Why DØRAC? DØRAC FTFM, Jae Yu 1 What do we want DØ Regional Analysis Centers (DØRAC) do? Why do we need a DØRAC? What do we want a DØRAC do?
Sept Wyatt Merritt Run II Computing Review1 Status of SAMGrid / Future Plans for SAMGrid  Brief introduction to SAMGrid  Status and deployments.
DØ Computing Model and Operational Status Gavin Davies Imperial College London Run II Computing Review, September 2005.
DØ Grid Computing Gavin Davies, Frédéric Villeneuve-Séguier Imperial College London On behalf of the DØ Collaboration and the SAMGrid team The 2007 Europhysics.
Overview of the Belle II computing
Moving the LHCb Monte Carlo production system to the GRID
Monte Carlo Production and Reprocessing at DZero
DØ MC and Data Processing on the Grid
Gridifying the LHCb Monte Carlo production system
Presentation transcript:

GridPP11 Liverpool Sept04 SAMGrid GridPP11 Liverpool Sept 2004 Gavin Davies Imperial College London

GridPP11 Liverpool Sept04Introduction Tevatron –Less data than LHC, but still PBs/experiment and growing –Running experiments SAM (Sequential Access to Metadata) –Well developed metadata and distributed data replication system –Developed by DØ & FNAL-CD JIM ( Job Information and Monitoring) –handles job submission and monitoring (all but data handling) –SAM + JIM →SAMGrid – computational grid Runjob –handles job workflow management See

GridPP11 Liverpool Sept04 SAMGrid Architecture

GridPP11 Liverpool Sept04 SAM plots Up to 200TB/month Over 2 PB in last yr CDF usage now similar -have just topped the PB Active SAM sites 40 DØ, 26 CDF (DØ usage)

GridPP11 Liverpool Sept04SAMGrid-plots (09/09/04) JIM: Active execution sites: 11DØ, 1 CDF in testing

GridPP11 Liverpool Sept04 SAMGrid plots

GridPP11 Liverpool Sept04 DØ – Production - MC All DØ MC always produced off-site SAMGrid now default (went into production in mar 04) –Based on request system and jobmanager-mc_runjob –MC software package retrieved via SAM –Currently running at (multiple) sites in Cz, Fr, UK, USA (10 in total + FNAL) more on way, inc central farm –Average production efficiency ~90% –Average inefficiency due to grid infrastructure ~1-5% For more details, see –GridPP10 DØ talk by Peter Love –

GridPP11 Liverpool Sept04 P14 Autumn 2003 –25M events in UK –Based around mc_runjob –Distributed computing rather than Grid –UK effort key to project success P17 Autumn 2004 –x 10 larger, use of db proxy servers –SAMGrid as default –Use LCG resources DØ – Production - Reprocessing

GridPP11 Liverpool Sept04 DØ – Production - LCG Increasing effort to ensure SAMGrid / LCG interoperability –MC generated on EDG/LCG and other shared resources (inc Imperial, RAL) “by hand” –Demo of sam_client functionality on LCG at London workshop in Apr –Will use LCG resources p17 data reprocessing All Nikhef MC produced this way

GridPP11 Liverpool Sept04 (DØ –) Runjob mc_runjob currently used by SAMGrid for MC and reprocessing DØrunjob - the rewrite Joint CDF, CMS, DØ, FNAL-CD project Base classes from common Runjob package DØrunjob available this autumn –Will incorporate Sandbox as a separate module For details see: Runjob CDFRunjobCMSRunjobDØRunjob

GridPP11 Liverpool Sept04 CDF – production - I See Mòrag Burgon-Lyon’s GridPP 10 talk for details Goal 1: 25% of computing offsite by June 2004 –Done, using DCAF and SAM DCAF = de-centralised CDF analysis farm, core of 7 sites, more on way Goal 2: 50% by June 2005, using Grid –Resources being identified / pledged JIM deployment –Originally planned for Oct 15 th –Problematic, look at grid3 as possible alternative

GridPP11 Liverpool Sept04 CDF – production - II Migration of DCAF sites to Condor Migration to SAM V6 –Switch to new internal dbserve code under test –Roll out to global sites expected soon FroNTier - new way to serve database contents to remote institutes –Should lower load on central CDF Oracle servers Studying methods to lower load and avoid fragmentation on remote file servers due to simultaneous network writes

GridPP11 Liverpool Sept04 (CDF -) SAMTV SAM TV used by CDF & DØ to monitor SAM and SAM stations –Currently created from log files –Version in dev created from MIS database, filled by new MIS server

GridPP11 Liverpool Sept04 Summary / plans SAM & SAMGrid critical –GridPP key part of effort SAMGrid, default for –MC production –Data reprocessing from autumn –Analysis to follow dØ tools, dØrte, sandboxing Interoperability –Good progress DØDØ 25% of computing off-site –Most with DCAF/SAM –GridPP effort key part of effort Increase to 50% for June 2005 –More DCAF installations Encourage user migration UKLight -10Gbit/s - “data –reprocessing” CDF

GridPP11 Liverpool Sept04 Backup - I From Peter Love’s GridPP10 talk