Project CIM Test Development Process

Slides:



Advertisements
Similar presentations
An End-User Perspective On Using NatQuery Query Scheduling T
Advertisements

Copyright © 2005, SAS Institute Inc. All rights reserved. SAS ABM Survey Kit A Sample Usage Scenario: Collecting Numeric Attribute Values.
May 2010 Slide 1 SG Communications Boot Camp Matt Gillmore 03/07/11.
CIM Test Development Process John Simmins Weekly Status and Planning Meeting 5/3/2011.
Criminal Procedure From First Contact to Appeal CHAPTER Criminal Procedure: From First Contact to Appeal, 5e John L. Worrall Copyright © 2015 by Pearson.
May SG Communications Overview Matt Gillmore 02/27/2012.
Marine Steam Power Plant Heat Balance Progress Report #2 By Steven Gelardi.
© 2010 EnerNex Corporation. All Rights Reserved. CIM Test Development Process EPRI Project January 2011.
Project Characterization Virtual Traffic Signal Presented by: Ron Herman Ofir Shentzer Technion – Israel Institute Of Technology Electrical Engineering.
© ABB Ltd ABB Experience Neela Mayur CIM Users’ Group Meeting June 12, 2008.
EPRI Smart Grid Demonstration and CIM Standards Development
NSG Software Development Acceptance Test Presentation May 2, 2006 NSG Software Development May 2,
Production Planning Processes EGN 5620 Enterprise Systems Configuration (Professional MSEM) Fall, 2012.
CIM Test Development Process John Simmins Weekly Status and Planning Meeting 4/5/2011.
Best Practices for Implementing Unicenter Asset Portfolio Management r11.2 in an HA MSCS Environment - Part 2 – Unicenter Asset Management Portfolio Draft.
Green Button Initiative GREEN BUTTON DOWNLOAD MY DATA CERTIFICATION DRY RUN Marty Burns, John Teeter for NIST, Kay Clinard UCAIug.
BSBPMG402A Apply Time Management Techniques 1 Apply Time Management Techniques Week 6 Project Time Processes – Part 2 C ertificate IV in Project Management.
Project CIM Test Development Process John Simmins Weekly Status and Planning Meeting 2/1/2011.
Common Information Model and EPRI Smart Grid Research
Doc.: IEEE /212r0 Submission May 2001 John Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks (WPANs)
Sam Houston State University's IR Office Organization System.
Production Planning Processes EGN 5620 Enterprise Systems Configuration Spring, 2014.
CIM Test Development Process John Simmins Weekly Status and Planning Meeting 3/29/2011.
CIM Test Development Process John Simmins Weekly Status and Planning Meeting 3/21/2011.
OpenSG and Conformity Bruce Muschlitz EnerNex Corporation Knoxville October 2009.
CIM Test Development Process John Simmins Weekly Status and Planning Meeting 4/19/2011.
Project CIM Test Development Process Author Name John Simmins Weekly Status and Planning Meeting 1/25/2011.
Technology Transfer Execution Framework. 2 © 2007 Electric Power Research Institute, Inc. All rights reserved. Relationship Between Your EPRI Value and.
CIM for Weather A joint project of: - Southern California Edison (SCE) - EPRI - Open Grid Systems Pat Brown EPRI Senior Project Manager CIMug - Prague.
31-04: Respond Offline to Planning Schedules Supply Chain Platform Training Presentation Updated April 2011.
© 2010 EnerNex Corporation. All Rights Reserved. CIM Test Development Process EPRI Project January 2011.
CIM Test Methodology Overview John Simmins 5/24/2011.
CIM Test Methodology Overview John Simmins 5/3/2011.
12 May 2011 CIM Users Group 2011 Goals Spring Meeting, Prague 12 May 2011.
1 RMS Update - ERCOT May 14, Supporting Reports Section.
1 Copyright © 2015 Pearson Education, Inc. Module 1 Workshop 1 Plan a Project Series Editor Amy Kinser by Kristyn Jacobson.
1 NIIF Summary Report Activities since the NIIF #52 meeting April 11, 2006 Cathie CapitaRobert Schafer NIIF Co Chair.
Erich W. Gunther UtilityAMI Chairman/Facilitator Chairman/CTO – EnerNex Corporation Jerry Melcher Onsite facilitator for this meeting.
TSO Interoperability and the CIM
CIM Test Development Process John Simmins Weekly Status and Planning Meeting 3/15/2011.
August 25, 2008 TPTF Nodal Status Report: Integrated Schedule Update Change Control Update Adam Martinez Troy Anderson.
SIS - Security Lab Introductory Session University of Pittsburgh 2008.
 Scheduling  Member Information  Tracking Progress  Attendance.
RMDSRMDS Retail Market Design Services 1 IGG Agenda – November 1s t 2006 Minutes from last IGG meeting10.00 – Networks AIM Project.
12/10/2016 Smart Grid Requirements for IEEE M2M Network IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16ppc-10/0042.
9/13/2006 RMS Duplicate Retail Transactions. RMS9/13/2006 Background Duplicate Retail Transactions Types of duplicate transactions: –PaperFree duplicate.
Slide 6-1 Chapter 6 System Software Considerations Introduction to Information Systems Judith C. Simon.
Testing Dojo – Intelligence Information Team – 11/05/2015.
© 2010 EnerNex Corporation. All Rights Reserved. CIM Test Development Process EPRI Project January 2011.
Office of the National Coordinator for Health Information Technology ONC Update for HITSP Board U.S. Department of Health and Human Services John W. Loonsk,
Web Redesign Update Extended Communications Group Saturday, March 12, 2016 Rico Natale, Brock University Phil Bliss, Academica Group.
ICSE 2011 Implementation Update Aaron Valdez Liane Nakamura Deeksha Malhotra Phase Manager: Max Mueller.
Project CIM Test Development Process John Simmins Project Overview 1/27/2011.
SLIDE 1 POC PROCEDURES WORKING GROUP (POC-PWG) 14 January 2016.
May 2010 Slide 1 SG Communications Boot Camp Matt Gillmore 11/1/2010.
BSBPMG503A Manage Project Time Manage Project Time Project Time Processes Part 2 Diploma of Project Management Qualification Code BSB51507 Unit Code.
Lab-Wide Earned Value Management System Project Core Team Meeting September 10, 2008 Dean A. Hoffer/Elaine McCluskey.
NMMS Nodal Network Mgmt and Monitoring System Update
CIM Test Development Process
CIM Test Methodology Overview
CIM Test Development Process
Development of draft test procedures
Technical Update MultiSpeak Users’ Group Meeting
Five-Minute Settlement Program: Executive Forum 2
RSA 2019 Interop Demonstration Event
Smart Grid ad hoc Closing Report - March 2010
TAG Agenda – April 6th 2006 Minutes from last TAG meeting – 13.45
PWG Plenary Status Report Workgroup for Imaging Management Solutions
ONC Update for HITSP Board
Validated Healthcare Directory Connect-A-Thon
Presentation transcript:

Project 071103 CIM Test Development Process John Simmins Weekly Status and Planning Meeting 2/15/2011

Agenda Progress since last meeting Issues arising during the previous week Verify progress against stakeholder expectations General issues discussion Action items for individuals Expected work output during next week

Progress Since Last Call Updated Project Plan Added Schedule Details Added Process Steps and diagrams Held Planning Meeting to discuss vender participation Contact Plan Made plans to contact vendors this week Wrote additional concrete test procedures 2.01 Scheduled Meter Read Nominal Interoperability 2.02 Scheduled Meter Read System Errors 2.03 On Demand Meter Read Nominal Interoperability 2.05 Meter Outage Nominal Interoperability http://osgug.ucaiug.org/conformity/Shared%20Documents/CIM_TestingArtifacts/TestProcedureArtifacts Summary of recent activities and of the test cases

Detailed Schedule Update

Refining Virtual Lab Environment

Issues Arising During the Past Week None

Progress Against Stakeholder’s Expectations No real change from last week..

Open Action Items Assignee Action Status John Simmins Work with internal resources to separate lab network completely from the EPRI operational network. In process Mark Ortiz Set up EPRI server at EPRI. Provide written procedures on access to Consumer’s DMZ network and server Kay Stefferud Contract Mark Ortiz to request written procedures to access the Consumers server. Margaret Goodrich Review sample abstract test case. Send Kay excel spreadsheet with test set-up information. Vet set of Part-9 interoperability requirements with Consumers and SCE. Status of action items generated from each weekly meeting. We can discuss status now or else please send an email to the group with the completed action item information.

Expected Work Output During the Next Week Contact venders per plan Finish draft interoperability test procedures