1 MIRI Hardware (from Oct-Dec NPM reports)‏ Fred Lahuis (NPM input from Rieks Jager)‏ SRON MIRI NL Meeting Leiden, 6 th January 2010.

Slides:



Advertisements
Similar presentations
CMS Week March presented by John Coughlan RAL FED Hardware Status Pre-Series Manufacture Final Production Plans.
Advertisements

1 FGS Guider CDR – April 19, 2007 © Copyright 2007 Her Majesty the Queen in Right of Canada Subject to Controlled Goods Regulations of Canada FGS Guider.
1 NIRCam Monthly Science Team Telecon March 6, 2008.
MICE Collaboration meeting at CERN March 28 – April 1, 2004 MICE Cooling Channel --- AFC Module work group report Wing Lau – Oxford.
Chandra Calibration Status Summary 1.The gratings and mirrors are very well calibrated at this time and there are no time-dependent effects as far as we.
GLAST I&T January T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up.
Herschel / HIFI 1.Status mirrors FM/FS 2.Status COA QM 3.Status COA FM 4.Financial situation COA FM 5.Status MSA FM/FS.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
1 MICE Magnets Contents: Background Refurbishment Testing Installation & survey Current status Upstream beamline Open issues & concerns MICE Beamline Review,
1 Engineering the James Webb Space Telescope Paul Geithner JWST Deputy Project Manager - Technical March 26, 2011.
MIRI EC Meeting C/D13, Dublin, 17 th to 19 th September JWST Status.
1 Gillian Wright/John Thatcher - European Consortium George Rieke – University of Arizona Greg Goodson/Phillip Barela – Jet Propulsion Laboratory Scott.
TGC Big wheel Sector assembly plan Tatsuo Kawamoto ATLAS workshop 2005.
The Mid-Infrared Instrument (MIRI) Medium Resolution Spectrometer for JWST Martyn Wells MIRI EC & UKATC.
John Coughlan CMS Week Mar FED Update FED Production Status Transition Card.
Current Status of SPICA Focal Plane Instruments October 19, 2009 Hideo Matsuhara (ISAS/JAXA) & FPI team.
ASPERA-3 Apr. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/00 Schedule statused.
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
ASPERA-3 Jan. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 1_25/ Page 1 Monthly Status Report Report due 1/25/01 Schedule statused.
PACS SVR-II 18 January 2007 FM ILT overview1 The PACS FM ILT Phase I overview on actual test execution and analysis Eckhard Sturm MPE.
MIRI Optical System CDR, 6 th & 7 th December 2006 Mid InfraRed Instrument 07-1 Optical System Critical Design Review (CDR) TIPS Presentation: Margaret.
NIRSpec Status and PDR Results Jeff Valenti & Mike Regan 2006 March 16 TIPS/JIM.
Herschel/Planck January 13, 2005PACS IQR - SCI-PT/ ggonzale: Herschel PACS Instrument Qualification Review Review Objectives and Organisation G.Crone/G.Pilbratt.
Apr 17-22, NAOJ External alignment with X-Ray Telescope (XRT) and EUV Imaging Spectrometer (EIS) Y. Katsukawa (NAOJ) and SOT team.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
GLAST LAT Project DOE/NASA Review, March 31, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager
Test Readiness Review 23 October 2003 CRAL - LYON.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
GERB 4 Instrument Status GIST 25 23rd October 2006 Presenter: N Morris.
Status of GEM T2 assembly Outline Status of the GEM components Summary Tests TOTEM Collaboration meeting CERN / Risto Orava for Kari Kurvinen.
July, 2002CMS Tracker Electronics1 APV25 wafer testing Outline Mark Raymond, Imperial College Wafer test procedure speed improvements.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA MIRI VM2 Testing Scott Friedman and the MIRI Test Team (special thanks to Paul Eccleston, Alistair.
DEX Publication Project OASIS PLCS Telecon 27 November 2007 Trine Hansen.
GIST 24 Meeting GERB Hardware Status 14 th December 2005 Eric Sawyer.
ASPERA-3 Feb. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 2_25/ Page 1 Monthly Status Report Report due 2/25/01 Schedule statused.
Progress report from VTF Validation Phase 2 and Next Steps DTP-12, 16th January 2013, Geneva
Goddard Space Flight Center Cryogenics and Fluids Branch Status of the AMS-02 Cryocooler January 2007 TIM.
The INS NIRCam Team.
D. Greenfield CLRC1 UK-V End-cap Engineering 15 July 2003 Debbie Greenfield, RAL.
Page 1HMI/AIA Science Meeting – February 13, 2006 HMI Instrument Status HM/AIA Science Meeting February 13, 2006 Barbara Fischer HMI Deputy Program Manager.
IFS prototype – PM3 LAM, 13/06/2003 Prototype testing at CRAL Tests at room temperature in the visible.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 17 September 2002.
Click to Change Title Here is a text box to present information in paragraph format, instead of bulleted lists. We’ve left space to the right for an image.
NIRISS Science Team Meeting Oct 2015 NIRISS Activities in CV3 André Martel.
Power Upgrade Project SNS September 21-22, TBM Cost Estimate Cost Estimate Schedule Approach Tom Mann October 27, 2005.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
PACS IBDR MPE 27/28 Feb 2002 AIV 1 PACS IBDR Test Cryostat and OGSE Gerd Jakob MPE.
IFU Management Meeting LAM – 15/10/04. Introduction (olf)
MIRI day 3 june 2010 Biography of JWST MIRI SMO FM MIRI day 1.
PDS4 Project Report PDS MC F2F University of Maryland Dan Crichton March 27,
January 3, 2008 TAC Meeting Texas Nodal Program Update Jerry Sullivan.
Preparation for silicon sensor arrival sensor delivery schedule aggressive expect 130 L2-L5 sensors each in July and August sensor lot/batch will likely.
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
1 Mission preparation Fred Lahuis SRON / Leiden Observatory MIRI NL Meeting ASTRON, 3 th June 2010.
1 MIRI Software Fred Lahuis SRON MIRI NL Meeting Leiden, 6 January 2010.
Chris Booth Sheffield 29th March 2006
Bill Raynor Naval Research Lab
F.E.T.S. Mechanical Engineering Update
The Medium Resolution Spectrometer on behalf of the MRS team
ARTICLE 17 REPORTING 23 MS delivered by end 2007 latest delivery early March 2008 latest second delivery early April 2008.
MIRI Observing Templates
Overall Project RAG Status
TSF Upgrade Project Overview Resources Plans and Timetable
Release 3 Update November 2018.
Overall Project RAG Status
Overall Project RAG Status
MIRI Low Resolution Spectroscopy
ARTICLE 17 REPORTING 23 MS delivered by end 2007 latest delivery early March 2008 latest second delivery early April 2008.
TEMPO Instrument Update
Presentation transcript:

1 MIRI Hardware (from Oct-Dec NPM reports)‏ Fred Lahuis (NPM input from Rieks Jager)‏ SRON MIRI NL Meeting Leiden, 6 th January 2010

2 General JWST Mission CDR moved to April 2010 UK planning to start FM integration at beginning of March -either with IOC or SPO -depending which arrives first; -both delivery forecasts are close. -ATC planning extended working when DGAs delivered in order to turn round SPO as soon as possible. FM FPE -JPL has confirmed the mods do work on the prototype new analogue board for the FPE -FM boards are/were (Dec) being populated. -boards undergoing extended testing at JPL but no technical issues found - work around is to go to gravity release test without FPMs if JPL cannot deliver FPS on time.

3 MTS and ISIM MTS work at RAL progressed well -MTS testing completion at RAL awaiting repair/replacement of failed control boards -likely to be late January Successful TIM for MIRI at ESTEC early DEC -concerns about ISIM-level test limitations cleared -David Barrado’s MTS update presentation -No more MTS issues ISIM test planning -lot of follow up will be needed -another meeting at ESTEC on 8th Jan (Martyn/Alistair)‏ -ISIM Optics Test external review (March)‏

4 FM IOC Contamination problem management meeting at CSL on 21st October with OIP, CSL, Belspo, Prodex and EC participation with a very positive outcome -FM IOC has been dismantled -all mirrors have been cleaned -structural parts bake out -re-integration moved to CSL revised alignment procedure reviewed with Martyn & Jose FM IOC assembly complete to POM alignment 2 nd week of Dec -interference in SPO box mirror and POM placement resolved -cal box has been checked and its shims are in manufacture TRR for functional and optical performance tests to follow assembly New issue on tower alignment found in Dec -under investigation -Status ??

5 DW/GW misalignments DW/GW misalignments after vibration DGA measurements showed that initial explanation was incomplete Ratchet arm assembly measured and shown not to be cause Fastener update -higher-strength fastener screws -Details ??? Both FM DGAs reassembled early Dec -vibration test with DGA-A mid Dec -post vibration functional checks and DGA-B pre-vibration checks to be carried out first week of January. Latest... small issue with DGA-A leading to delay of ~1-2 weeks

6 MIRIM Cryo #5 is over and went pretty well Summary of all the tests which have been performed on MIRIM FM: WARM tests: -alignment, -image COLD tests: -DISTORTION GRID: -image quality at 7.7μm -IMAGING: -focus test, -flat, background -microscan at 5.6μm in whole FoV, with /without pupil shear -PSF in each filter (whole filter band)‏ -spectral scan of each filter band (except 21μm and 25.5R). -FoV dependence of band pass

7 MIRI-cont CORONO: -PSF in each filter -Spectral scan of filter band (except 23μm)‏ -Rejection factor VS centring in each filter. Rough estimation of the rejection factors w.r.t. filter bands: μm μm μm -Lyot: data analysis still ongoing. LRS: -Broad Band spectrum, slit and slitless, with atmosphere, with/without blocking filter or plastic (foil with features in mid-IR)‏ -Spectral resolution, slit and slitless -Wavelength registration dependence with position in the slit.

8 MIRIM-cont Data analysis ongoing. Delivery preparation phase started. The manufacturing of the LRS filter is progressing but the delivery will likely be delayed to January. As a consequence, the baseline now is to deliver MIRIM FM as foreseen (end of January) but the Coronagraph FP will be delivered in parallel or later and will be mounted at RAL (the 2 deliveries could occur at the same time but we don't want to delay the main delivery because we have to wait for the bake-out). The MIRIM FM DRB is still foreseen to take place at the end of January as well. The repaired RGA has been actually delivered at CEA; bakeout to start week 1.

9 Schedule Start of integration at RAL in March -Appears to be still possible -Update on this at NPM meeting in Madrid Jan 14 Further schedule -????????????????????