Reliable Power Reliable Markets Reliable People RAS Guideline Initiative March 23, 2009.

Slides:



Advertisements
Similar presentations
Parallel Flow Visualization/Mitigation Proposal
Advertisements

1 WECC/AESO Membership and Coordinating Operating Agreement WECC Board of Directors Meeting December 2007 Diana Pommen Director Interjurisdictional Affairs.
Intra Hour Tagging/Oasis During System Contingencies The transmission tagging process was initially developed to solve an after the fact accounting issue.
EMS Checklist (ISO model)
2014 Edition Release 2 EHR Certification Criteria Final Rule.
Ensuring Better Services and Fair Value “Introduction and roadmap to implementation of ISO in Zambia’s water utilities” Kasenga Hara March 2015.
New Cost Estimate Template Issued: December 11, 2014 Effective: January 5, 2015.
Relevance and effectiveness Regional Good Standardization Practice Course July, Bangkok, Thailand Good Standardization Practice 2012.
A Snapshot of TEQSA Dr Carol Nicoll Chief Commissioner Festival of Learning and Teaching University of Adelaide Tuesday 6 November 2012.
Transmission Congestion on the Delmarva Peninsula December 17, 2003 PA
Transmission Corridor Zone Designation Process Terrence O'Brien, CEC December 11, 2007 Energy Action Plan.
Economic Criteria for Transmission Planning in the ERCOT Region Public Utility Law Seminar DeAnn Walker August 3, 2012.
Reliable Power Reliable Markets Reliable People Reliable Power Reliable Markets Reliable People Interconnection Queue Business Practices Stakeholder Consultation.
Western States Energy & Environment Symposium October 27, 2009.
Reliable Power Reliable Markets Reliable People Market Services Stakeholder Session Thursday, January 7, 2010 Metropolitan Centre, Calgary.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Federal Energy Regulatory Commission Proposed Rule on Small Generator Interconnection RM July 23, 2003.
Reliable Power Reliable Markets Reliable People Wind Developments in North America APEX Conference – Sydney, Australia October 14, 2008 Warren Frost, Vice.
Reliable Power Reliable Markets Reliable People ISO Rules Update – – Outage Cancellation – Long Lead Time Energy Dispatch Compliance.
Federal Energy Regulatory Commission Large Generator Interconnection Final Rule RM July 23, 2003.
Business Optix Library Service – Workflow
1 Next Generation ISO Susan LK Briggs Presented to EFCOG/DOE EMS Implementation, Lessons Learned & Best Practices Training Workshop, 3/05.
ISO Quality management International Organization for Standardization International Organization for Standardization It addresses various aspects.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
Copyright Course Technology 1999
Postgraduate Educational Course in radiation protection and the Safety of Radiation sources PGEC Part IV The International System of Radiation Protection.
NERC Congestion Management Congestion Management Option 3 Vendor Meeting Julie Pierce – NERC IDCWG Chair.
October 8, 2003Ontario Energy Board1 Ontario Energy Board Update E.A. Mills Director – Regulatory Affairs Market Advisory Committee October 8, 2003.
Market Design of SE Europe: Reflections from the 3rd Forum on the Way Forward 6 th Permanent High Level Group Meeting Athens, 07 December 2003.
Powering Alberta AESO Annual General Meeting May 14, 2009 Reliable Power Reliable Markets Reliable People.
Key Industry Challenges Regulatory Perspective Michael G. Tutty Chairman Commission for Energy Regulation 13 October
OSC Meeting April 27, Transmission Cost Allocation Overview.
Planning and Community Development Department Housing Element City Council February 03, 2014.
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
Discussion of Market Participant Choice for Transmission Connections Stakeholder Session October 14, 2011.
April, 2008 Maximum Shadow Price. April, 2008 Protocol Requirement: Transmission Constraint Management (2)ERCOT shall establish a maximum Shadow.
Project System Protection Coordination Requirement revisions to PRC (ii) Texas Reliability Entity NERC Standards Reliability Subcommittee.
Environmental Management System Definitions
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
2.2 Acquisition Methodology. “Acquisition methodology” – the processes employed and the means used to solicit, request, or invite offers that will normally.
Madrid, 1 st April 2008 Proposal for the commercialisation of existing and committed capacity at the cross border point of Larrau between France and Spain.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
Reliable Power Reliable Markets Reliable People Transition of Authoritative Documents – Information Session September 2009 Doyle Sullivan Evelyn Kelly.
Standards Review Subcommittee Update August 17, 2010.
Reliable Power Reliable Markets Reliable People AESO Integrated Market Roadmap March 2009 Stakeholder Session.
Organisational Policy
Chatham House Illegal Logging Update 25 January 2007 Public Procurement Policies for Wood Products and Harmonisation Process Between NL, UK and DK Janneke.
The EU’s Third Energy Package European Code Development UNC Transmission W/S - 4 th December 2008.
Projects System Protection Coordination Draft 2 of TOP Texas Reliability Entity NERC Standards Reliability Subcommittee November 2, 2015.
Review of PUC Discussion on Nodal Market Adoption Technical Advisory Committee September 7, 2005.
Faculty Meeting Review Group Alvan Bregman (convener), Lisa Hinchliffe, Joanne Kaczmarek.
Market Working Group Update Presentation to CAWG March 29, 2011 Jim Sanderson, KCC.
1 Market Evolution Program Day Ahead Market Project Regulatory Affairs Standing Committee Meeting May 14, 2003.
RTO WEST Summary of RTO West 9/18/02 Declaratory Order Presentation to The Committee on Regional Electrical Power Cooperation (CREPC) by John Carr 10/1/02.
DRAFT – FOR DISCUSSION PURPOSES ONLY © 2013 New York Independent System Operator, Inc. All Rights Reserved. EIPC Roll-Up Powerflow Model Zach Smith Director,
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
Retail Metering Working Group Progress Report 08/15/07.
Regulation of Medical Devices: Importance of a Globally Harmonized Approach Nicole Taylor Smith, JD September 2017.
Software Project Configuration Management
New transparency guidelines
INTERCONNECTION GUIDELINES
Regulators’ update on Congestion Management and Balancing
Massachusetts Electric Restructuring Roundtable
NERC Reliability Standards Development Plan
Incentives for electricity infrastructure – ERGEG view
NERC Reliability Standards Development Plan
1915(c) WAIVER REDESIGN 2019 Brain Injury Summit
NERC Congestion Management
Energy Storage Roadmap & Flexibility Roadmap Information Session
Presentation transcript:

Reliable Power Reliable Markets Reliable People RAS Guideline Initiative March 23, 2009

2 RAS Initiative Background Proposed Transmission Constraint Management (TCM) rules manage real time congestion through system controller action –AUC decision pending –If TCM rules approved, OPP’s will follow and system controller tools will be built –In the interim, OPP revisions or additions will align with TCM proposal as far as practical

3 RAS Initiative Background A Remedial Action Scheme (RAS) is designed to protect system facilities without the need for system controller intervention – AESO committed to provide more formal documentation of RAS policies and procedures –RAS initiative will explore the need for RAS rules and discuss the content of the RAS guideline seeking stakeholder feedback on improvements to or clarification of the policies and procedures

4 What is RAS? ISO Rule RAS Definition: RAS means a control system that makes automatic adjustments to power system elements in order to preserve system reliability RAS can be categorized into two broad types: –Interconnection RAS A RAS requirement that arises from a customer interconnection application which is usually removed when needed facilities are built The potential RAS rules are expected to be directed toward interconnection RAS only –System RAS A RAS requirement that arises from changes to the AIES that develop over time System RAS requires a more flexible approach to creating solutions as it is more unique, often permanent and is generally paid for by load RAS Guideline will provide some discussion and examples of system RAS

5 RAS Legislative Authority Transmission Regulation requirements: plan for 100% in merit energy under normal conditions non-wires solutions (RAS) allowed as a temporary solution EUA duties: safe, reliable and economic operation Supports technical RAS requirements FEOC market Influences RAS polices and procedures RAS must be used in a manner which is consistent with the Act, any other obligations set out for the ISO in legislation, the ISO rules and any other applicable Authoritative Document.

6 RAS Documentation Format Potential RAS rules: Some aspects of RAS policy and procedure may belong in an ISO rule Regulatory authority Technical requirements Operational implementation Supporting RAS documentation: Most aspects of RAS policy and procedure are informational and may not belong in the rules Some RAS policies may either be addressed in rules or outlined in an informational format The term “guideline” may be too formal for the information document as the contents may be best maintained outside the rules process

7 RAS Policy Issues Interconnection RAS and transmission rights Constraints caused by interconnections often can not be dealt with by the system controller in real time RAS is intended to be proactive allowing early interconnection RAS is assigned to and generally paid for by the interconnecting customer Alternatively, system operating limit derates may be required which manage the constraint in advance among existing and new generation sources Early interconnection needs to balanced with fairness to existing generators in the area and the AESO duties to operate the system

8 RAS Policy Issues Interconnection RAS and real time operation Interconnection RAS operates automatically at preset levels to protect system facilities Under the proposed Transmission Management Constraint rules, after a RAS has been activated, the system controller will apply the TCM protocol using RMO and pro-rata to allocate the constraint mitigation among effective generators in the area; this is a change from past practises Interconnection RAS generators have on occasion requested that whenever possible the system controller issue curtailment instructions to proactively prevent RAS activation; the AESO will need to consider whether it is still appropriate to offer this service

9 Energy Market Life Cycle Stage RAS Guideline

10 Next Steps Market Services stakeholder meeting March 23 Discussion paper Complete internal reviews and publish in April Stakeholder comments will be requested Recommendation paper Discussion paper stakeholder comments will be reviewed and a set of recommendations put forward for further comment ISO Rule process Potentially promote RAS rules thru the October rules process RAS guideline document would be developed in a parallel work stream

11