LBT Q1 2008 Eng/SW Review MCSC – Mount Control System.

Slides:



Advertisements
Similar presentations
Yokogawa Network Solutions Presents:
Advertisements

LBT Q Eng/SW Review SFWG – Software Group General Norm Cushing.
LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
1 LBT Q Eng/SW Review SHTR: Shutters. 2 Highlights (Q1/2009) Shutters have been working well, generally Shutters have been working well, generally.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli, Chris Biddick.
Software Evolution Planning CIS 376 Bruce R. Maxim UM-Dearborn.
Magellan f/5 Planning and Status Andrew Szentgyorgyi Magellan SAC Meeting Pasadena/17 Mar 2012.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
J. Large Binocular Telescope (LBT) Operational Readiness
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Kern.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
LBT Q Eng/SW Review ROT - Rotators. 4-Apr-2008LBT Q Eng/SW Review Highlights First BG rotator installed First BG rotator installed BG cable.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Engineering Review Primary Mirror Cells Biddick/Gusick/Kern.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
1 LBT Q Eng/SW Review ECS: Enclosure Control System.
LBT Q Engineering Review Swing Arms (SWA) Apr-04LBT Q Engineering Review Highlights (Q4/2007) The PF SAs lost their cable trays The.
LBT Q Eng/SW Review TEL – TELEMETRY Tony Edgin.
LBTO software startup/shutdown and troubleshooting July 18, 2006 Chris Biddick 1 cjb.
LBT Q Engineering and Software Review ENGG Engineering General.
Addition of Polynomials Two terms are considered like terms if they: 1) are both constants, or 2) have the same variables with the same exponents on corresponding.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
1 LBT Q Engineering Review ICS – Instrument Cooling System.
1 LBT Q Eng/SW Review PVM: Preventive Maintenance.
20 October 2008LBT Q Eng/SW Review0 PCS – Pointing Control Subsystem Michele De La Peña.
LBT Q Eng/SW Review TERC Tertiary Mirror Units Commissioning.
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Howard.
1 LBT Q Eng/SW Review PLMG: Plumbing. 2 Highlights (Q2/2008) Have recently replaced worn contactors in the Primary Loop chillers Have recently replaced.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
LBT Q Engineering Review DYB. 21-Dec-2007LBT Q Engineering Review Highlights (Q4/2007) Currently in Commissioning Phase Currently in Commissioning.
LBT Q Engineering Review Instrument Cooling.
1 LBT Q Eng/SW Review ICS – Instrument Cooling System.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
LBT Q Eng/SW Review SFWG – Software Group Norm Cushing.
LBT Q Engineering Review SAB Static Balancing.
1 LBT Q Engineering Review PLMG: Plumbing, includes IC system, chiller systems, instrument lab cooling, and LUCIFER cryo-compressor cooling.
LBT Q Eng/SW Review MCSC – Mount Control System.
LBT Q Eng/SW Review CM – Configuration Management Stephen Hooper.
1 LBT Q Eng/SW Review PWR: Site electrical power.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
1 LBT Q Eng/SW Review ECS: Enclosure Control System.
21 July 2008 LBT Q Eng/SW Review 1 SIN – Software Infrastructure Titus Purdin.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Engineering Review ESW Engineering Software.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
1 LBT Q Engineering Review ECS: Enclosure Control System, includes the dewpoint sensor, CA system upgrades, grounding, enclosure track performance.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
LBT Q Engineering and Software Review ENGG Engineering General.
LBT Q Engineering/Software Review ROTRotators.
1 LBT Q Eng/SW Review PWR: Site electrical power.
LBT Q Eng/SW Review DIMM – Differential Image Motion Monitor.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
LBT Q Engineering Review PMCD. 21-DEC-2007LBT Q Engineering Review Highlights (Q4/2007) Draft of System Overview and O&M manual complete except.
LBT Q Engineering Review DAQ. 19-Apr-2007LBT Q Engineering Review Housekeeping System Requirements Interface directly to the Agilent 34970A.
1 LBT Q Eng/SW Review PLMG: Plumbing, Chiller Systems.
LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
LBT Q Engineering Review Swing Arms (SWA). 10-Jul-2007LBT Q Engineering Review Highlights (Q2/2007) The right secondary arm is wired and the.
HOW TO FIX MSVCR100. DLL IS MISSING ERROR? missing-error.
LBT Q Eng/SW Review SFWG – Software Group General Norm Cushing.
LBT Q Engineering Review ENGG – Engineering General.
1 LBT Q Eng/SW Review PSPI: PEPSI installation preparation.
Request for Proposal and Selection Procedures
Presentation transcript:

LBT Q Eng/SW Review MCSC – Mount Control System

April 4th, 2008LBT Q Eng/SW Review1 Highlights (Q1/2008) Added Rotator and Cable Chain support to MCSPU Added Rotator and Cable Chain support to MCSPU Added Dynamic Balance commands and display pages to MCSPU Added Dynamic Balance commands and display pages to MCSPU Established communication between PCS and MCSPU for rotator polynomials Established communication between PCS and MCSPU for rotator polynomials

April 4th, 2008LBT Q Eng/SW Review2 Progress Repair ELRL read head (no progress) Repair ELRL read head (no progress) Work on punch list for commissioning √ Work on punch list for commissioning √ Additional Progress Additional Progress Added Rotator and Cable Chain support to MCSPU √ Added Rotator and Cable Chain support to MCSPU √ Added Dynamic Balance commands and display pages to MCSPU √ Added Dynamic Balance commands and display pages to MCSPU √ Established communication between PCS and MCSPU for rotator polynomials √ Established communication between PCS and MCSPU for rotator polynomials √ Addressed issue 847 concerning Azimuth startup in the wind √ Addressed issue 847 concerning Azimuth startup in the wind √ Procured and spare azimuth encoder tape √ Procured and spare azimuth encoder tape √

April 4th, 2008LBT Q Eng/SW Review3 Open Issues Technical Technical Encoder reset is not as reliable as it should be (probably a hardware issue) Encoder reset is not as reliable as it should be (probably a hardware issue) AZ/EL start-up procedure not as reliable as it should be (probably a TPLC issue) AZ/EL start-up procedure not as reliable as it should be (probably a TPLC issue) ELRL main encoder read head signal/noise is poor ELRL main encoder read head signal/noise is poor ELFR main encoder read head preload spring is missing ELFR main encoder read head preload spring is missing Cleanup necessary for commissioning Cleanup necessary for commissioning Schedule Schedule none none Financial Financial none none Resource Resource MCS competing for engineering resources MCS competing for engineering resources

April 4th, 2008LBT Q Eng/SW Review4 Planning HBS and Rotator support HBS and Rotator support Add variables to Data Dictionary to make available to TCS Add variables to Data Dictionary to make available to TCS Add MCSPU commands to MCS to make available to TCS Add MCSPU commands to MCS to make available to TCS Numerous Events need to be defined for the Event Logging System Numerous Events need to be defined for the Event Logging System Alter AZ/EL/ROT Hold commands to stop telescope more gently Alter AZ/EL/ROT Hold commands to stop telescope more gently Make existing AZ/EL software use/monitor newly available information from the HPLC Make existing AZ/EL software use/monitor newly available information from the HPLC Repair ELRL read head Repair ELRL read head Install ELFR read head preload spring Install ELFR read head preload spring Work on punch list for commissioning Work on punch list for commissioning