San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Information Meeting Construction Contract 04-0120F4 November 30, 2005.

Slides:



Advertisements
Similar presentations
Potential Solutions Goals for Design – What are we concerned about? –Primary Goal: Get the deck on successfully Stability during deck pour Stability during.
Advertisements

Structural Steel Construction
BEAMS (FLEXURE) BEAM- COLUMNS SHEAR / CONC. LOADS
Chapter-2 Parts of Steel Bridge.
Actions and Retrofit of Post Earthquake-Damaged Bridges
Unit 45 Metal Framing Industry and Code Regulations • Light-gauge Steel Framing Members • Fasteners • Framing Tools • Metal Framing Safety • Light-gauge.
INTRODUCTION TO PRESSURE VESSELS
Tension Members Last Time
Chp12- Footings.
Elastic Stresses in Unshored Composite Section
Advanced Flexure Design COMPOSITE BEAM THEORY SLIDES
By : Prof.Dr.\Nabil Mahmoud
4-Chapter Allowable stresses. contents Introduction 2.6.1(p8) Compression element, Axial or bending2.6.1(p8) Compression element, Axial or bending Axial.
1 Westinghouse Non-Proprietary Class 3© 2012 Westinghouse Electric Company LLC. All Rights Reserved. Structural Analysis of a Nuclear Fuel Handling Machine.
Connection Design.
Carl Hubben – Structural Option Ae senior thesis Office Building-G EASTERN UNITED STATES.
Design of Tension Members
Connections and Bracing Configurations
Design of Tension Members
2015 Winter School Structures Heidi A. Mertz, P.E. District 8-0 Structure Control Engineer.
Chapter 5 Fatigue.
 Project Delivery  Design Considerations  Lessons Learned.
Chapter -9 WEB STIFFENERS.
COMPOSITE BEAMS-II ©Teaching Resource in Design of Steel Structures –
UNIT-I STANDARD SPECIFICATION FOR ROAD BRIDGE
Shear Capacity of Composite Steel Girder at Simple Support Virtis/Opis User Group Conference Nashville, TN, August 3-4, 2010 George Huang, PhD, PE California.
CM 197 Mechanics of Materials Chap 20: Connections
Tension Members Last Time
Minimum Weight Wing Design for a Utility Type Aircraft MIDDLE EAST TECHNICAL UNIVERSITY AE 462 – Aerospace Structures Design DESIGN TEAM : Osman Erdem.
Introduction to composite construction of buildings
Chapter 10 Web splice.
COLUMNS. COLUMNS Introduction According to ACI Code 2.1, a structural element with a ratio of height-to least lateral dimension exceeding three used.
Jim Merrill, Welding Engineer, Law Crandell
Chapter 6 Plate girder.
Samuel M. P. Jannotti Structural April 14, 2008 American Eagle Outfitters Quantum III: South Side Works.
SFOBB East Span Seismic Safety Project Sarah Picker Duty Senior Toll Bridge Program, Caltrans.
SFOBB East Span Seismic Safety Project Steve Margaris, Specifications Engineer, Caltrans.
San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Information Meeting Construction Contract F4 August 16, 2005.
Static Pushover Analysis
ERT352 FARM STRUCTURES TRUSS DESIGN
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Pier E9 Following the 1989 Loma Prieta Earthquake.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Constructability Workshop Nov. 20, 2002 In Bay.
SOURCE 2 AISI SPECIFICATION.
Moment Connection Requires Bolts Outside the Flanges
SFOBB East Span Seismic Safety Project Dan Ambuhl, Specifications Engineer, Caltrans.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project.
Presented by: Sasithorn THAMMARAK (st109957)
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project.
Overview of New Practices & Policy Skewed Bridges.
IN MODULAR CONSTRUCTIONS
Toll Bridge Seismic Retrofit Program Project Schedule and Budgets.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project March 12, 2002 Contractor Outreach.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Business Enterprise Outreach Program 2003.
Steel Fabrication & Erection of Belle Chasse Primary School ET-493 Final Proposal Spring 2015 Instructor: Chris Koutsougeras Advisor: Edward Rode’ Derek.
IS 800 – 2007 LUG ANGLE TENSION SPLICES SHEAR LAG
Building Construction
DESIGN AND DETAILING FOR EARTHQUAKE LOADS
Proposed Balanced Design Procedure
Construction Methodology for Suramadu Main Bridge.
Introduction to composite construction of buildings
High Bridge Re-Deck Project
GOVERNMENT ENGINEERING COLLEGE, BHAVNAGAR TOPIC : INTRODUCTION TO PRESSURE VESSELS Prepared By :- 1.Aal Akash Ansari Aarif.
Structural verification and certification of two existing platforms
ERT352 FARM STRUCTURES TRUSS DESIGN
CONDOMINIUM TOWER & PARKING
Outline: Introduction: a ) General description of project b) Materials
CFHT Pier Building Evaluation
Chapter-2 Parts of Steel Bridges.
INTRODUCTION TO PRESSURE VESSELS
EAT 415 :ADVANCED STEEL BUILDING DESIGN PLATE GIRDER
Presentation transcript:

San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Information Meeting Construction Contract F4 November 30, 2005

SFOBB East Span Seismic Safety Project 2 Jon Tapping Interim SFOBB East Span Project Manager, Caltrans

SFOBB East Span Seismic Safety Project 3 Dan McElhinney, District 4 Director, Caltrans

SFOBB East Span Seismic Safety Project 4 DVBE - Civil Rights Robert Padilla Statewide Small Business Liaison for Caltrans, Office of Civil Rights Disabled Veteran Business Enterprise (DVBE) goal Disabled Veteran Business Enterprise (DVBE) goal Prime Contractor’s commitment Prime Contractor’s commitment

SFOBB East Span Seismic Safety Project 5 Technical Issues Brian Maroney SFOBB East Span Technical Manager, Caltrans

SFOBB East Span Seismic Safety Project 6 Guidelines for Q&A Please submit questions in writing on cards provided Please submit questions in writing on cards provided Any answers provided today are preliminary and not considered final until posted on the bidder inquiry web site Any answers provided today are preliminary and not considered final until posted on the bidder inquiry web site  Bidder Inquiry website:  Future inquiries may be addressed to the Duty Senior Mailing address: P.O. Box 23660, Oakland, CA Fax number: (510) All inquiries must include the contract number ( f4)

SFOBB East Span Seismic Safety Project 7 Mike Whiteside Upcoming Addenda

SFOBB East Span Seismic Safety Project 8 Upcoming Addendum Items Addendum 4, early December CJP to PJP CJP to PJP Remove “Unsatisfactory Progress” Specification Remove “Unsatisfactory Progress” Specification Add Temp. Tower AE & AW final Designs Add Temp. Tower AE & AW final Designs Use of Electorslag Welding Use of Electorslag Welding Pre-Assembly Requirements Reduced Pre-Assembly Requirements Reduced Constructability Refinements/Improvements & Conflict Resolution Constructability Refinements/Improvements & Conflict Resolution

SFOBB East Span Seismic Safety Project 9 Upcoming Addendum Items Addendum 5, late December Performance specifications for castings E2 Shear Key/Bearing Alternative E2 Shear Key/Bearing Alternative Hinge K Pipe Beam Fabrication Hinge K Pipe Beam Fabrication Hinge K Closure Hinge K Closure Availability of North Side of Oakland Approach Availability of North Side of Oakland Approach

SFOBB East Span Seismic Safety Project 10 Upcoming Addendum Items Addendum 6, early January Miscellaneous clean-up issues Miscellaneous clean-up issues Constructability Refinements/Improvements & Conflict Resolution Constructability Refinements/Improvements & Conflict Resolution

SFOBB East Span Seismic Safety Project 11 Michael Stone Schedule

SFOBB East Span Seismic Safety Project 12 SAS Schedule

SFOBB East Span Seismic Safety Project 13 SAS Schedule – Working Drawings

SFOBB East Span Seismic Safety Project 14 SAS Schedule  Changes since last advertisement Increased bidder compensation Revised CRIP specifications to provide non-compensable time for CRIP submittal Reduction in time required for Caltrans to review and approve weld repairs Allowing repairs to be made after erection E2/T1 availability earlier in the contract, more time between E2/T1 availability and Milestones 2, 3 and 4

SFOBB East Span Seismic Safety Project 15 Marwan Nader Temporary Tower Design Example

SFOBB East Span Seismic Safety Project 16 TEMPORARY TOWER DESIGN EXAMPLE November 18, 2005

SFOBB East Span Seismic Safety Project 17

SFOBB East Span Seismic Safety Project 18 Tower Configurations Tower C Tower C Tower G Tower G

SFOBB East Span Seismic Safety Project 19

SFOBB East Span Seismic Safety Project 20

SFOBB East Span Seismic Safety Project 21 DESIGN CRITERIA Codes, Standards, Specifications Applicable Codes/Specifications: CalTrans Standard Specifications, 1999 CalTrans Standard Specifications, 1999 CalTrans Special Provisions, Contract F4 CalTrans Special Provisions, Contract F4 CalTrans Falsework Manual, Rev. 32, November 2001 CalTrans Falsework Manual, Rev. 32, November 2001 AISC-LRFD, 1999 for rolled sections AISC-LRFD, 1999 for rolled sections API RP2A-LRFD, July 1993 for tubular sections and connections (and pipe piles) API RP2A-LRFD, July 1993 for tubular sections and connections (and pipe piles) AASHTO-LRFD Bridge Construction Specification, 2nd Ed. (Concrete only) AASHTO-LRFD Bridge Construction Specification, 2nd Ed. (Concrete only) ANSI/ASCE 795 (Wind loads only) ANSI/ASCE 795 (Wind loads only)

SFOBB East Span Seismic Safety Project 22 Independent Loads Cases Dead Load Dead Load Live Load Live Load Vessel Impact Vessel Impact Earthquake Earthquake  1.0X-direction Y direction  0.3 X-direction Y direction  -1.0 X-direction Y direction  0.3 X-direction Y direction Wind Load Wind Load Wind, Wave and Current Wind, Wave and Current

SFOBB East Span Seismic Safety Project 23

SFOBB East Span Seismic Safety Project 24

SFOBB East Span Seismic Safety Project 25

SFOBB East Span Seismic Safety Project 26 Wind, Wave and Current Wind Wind  ASCE 7-95 specifies an 85MPH Wind +10m  Section of the Special Provisions specifies a 100 MPH 3-sec El. +50m.  The 100MPH Wind Gust velocity stated in the Special Provisions govern.  The importance factor is 1.15 per revised Special Provisions  The exposure coefficients are for exposure D (open water)  The gust factor is 0.85 in accordance with ASCE Section 6.6  The shape factor on projected flat surface of the box girder was 1.5 (ASCE Table 6-8), and 0.8 for the tubular tower structures (ASCE Table 6-9). Wave Wave  2m high, 6sec wave per revised Special Provisions  Drag and inertia coefficients are 0.65 and 1.6 (ref API RP2A), respectively Current Current  3-knot surface current was conservatively assumed (Note: Vessel Collision Report indicates a uniform 2 knot design current for Impact design).  The surface current velocity profile with depth was developed utilizing a 1/7th power distribution.

SFOBB East Span Seismic Safety Project 27

SFOBB East Span Seismic Safety Project 28 Construction Loads/Stages 1. Individual deck lifts 1 thru 9 on the appropriate towers 2. In- fill / heavy lifts 1, 2, 3 & 4 on the appropriate towers 3. Connecting the deck sections together in the longitudinal direction 4. Connecting the cross beams in the transverse direction 5. Connecting the deck sections to W2 and E2 cap beams Tower C  Temporary Tower (TT)  TT plus Deck Lift #1 (830 Tonnes) on 4 bearing pads  TT plus Deck Lift #4 (459 Tonnes) on 4 bearing pads  TT plus Deck Lift #4 plus half of Heavy Lift #1 (830/2 = 415 Tonnes) = total 875 T  Envelope of Vertical Forces (see Table 1 on Sheet Construction Load No. 1) Tower G  Temporary Tower (TT)  TT plus Deck Lift #9 (892 Tonnes) on 6 bearing pads  TT plus Deck Lift #9 plus half of Heavy Lift #3 (1285/2 = 643 Tonnes) = tot al 1535 T  TT plus Deck Lift #9 plus half of Heavy Lifts #3 & #4 = 2177 T  Envelope of Vertical Forces (see Table 1 on Sheet Construction Load No. 1)

SFOBB East Span Seismic Safety Project 29 Load Combinations 1.4 DL 1.1 DL LL 1.0 DL LL Wind Current Impact (Vessel) 1.0 DL LL EQ 1.0 DL LL +1.3Wind +1.3Wave + 1.3Current

SFOBB East Span Seismic Safety Project 30 Tower C Tubular steel structure, trucked and assembled on site with the use of a crawler crane Tubular steel structure, trucked and assembled on site with the use of a crawler crane All tower and truss joints are to be bolted All tower and truss joints are to be bolted Leg segments bolted together with splice flanges located near inflection points Leg segments bolted together with splice flanges located near inflection points Pre-installed gusset plates welded to legs for bracing members to be bolted onto Pre-installed gusset plates welded to legs for bracing members to be bolted onto Gusset plates actually penetrate through the legs to provide load continuity through the joints Gusset plates actually penetrate through the legs to provide load continuity through the joints

SFOBB East Span Seismic Safety Project 31

SFOBB East Span Seismic Safety Project 32

SFOBB East Span Seismic Safety Project 33

SFOBB East Span Seismic Safety Project 34 Tower G 6- leg tubular steel jacket structure, 65m (213 ft) high 6- leg tubular steel jacket structure, 65m (213 ft) high 14m x 30m (46 ft x 98 ft) footprint at the top, to match bearing locations 14m x 30m (46 ft x 98 ft) footprint at the top, to match bearing locations Pin piles driven through the jacket legs Pin piles driven through the jacket legs The jacket base plan dimensions provide the same overturning resistance in both orthogonal directions The jacket base plan dimensions provide the same overturning resistance in both orthogonal directions Bay height chosen to provide efficient diagonal bracing Bay height chosen to provide efficient diagonal bracing Cross braced to provide ductility Cross braced to provide ductility

SFOBB East Span Seismic Safety Project 35

SFOBB East Span Seismic Safety Project 36

SFOBB East Span Seismic Safety Project 37

SFOBB East Span Seismic Safety Project 38

SFOBB East Span Seismic Safety Project 39 3D View of Towers ABC Model

SFOBB East Span Seismic Safety Project 40 Mode 1 (T=0.78 sec)

SFOBB East Span Seismic Safety Project 41 Y Spectral Displacement (5.62 cm at top of Tower C) (Transverse)

SFOBB East Span Seismic Safety Project 42 Wind Displacement (0.8 cm at top of Tower C)

SFOBB East Span Seismic Safety Project 43 Transverse Pushover at 115mm

SFOBB East Span Seismic Safety Project 44 Shear reductions are due to compression member buckling (tension members take over) Transverse Pushover to 115mm

SFOBB East Span Seismic Safety Project 45 3D View of Tower C Model as a separate structure

SFOBB East Span Seismic Safety Project 46 Mode 2 (T=1.43 sec)

SFOBB East Span Seismic Safety Project 47 Y Spectral Displacement (7.63cm at top of Tower) (Transverse)

SFOBB East Span Seismic Safety Project 48 Wind Displacement (1.06cm at top of Tower)

SFOBB East Span Seismic Safety Project 49 Transverse Pushover at 300mm

SFOBB East Span Seismic Safety Project 50 Shear reductions are due to compression member buckling (tension members take over) Transverse Pushover to 300mm, Force- Displacement Curve (76mm Seismic Demand)

SFOBB East Span Seismic Safety Project 51 Tower C Conclusions Combined structure is stiffer; lower period Combined structure is stiffer; lower period Produces larger forces Produces larger forces Separate structure is more flexible; higher period Separate structure is more flexible; higher period Produces lower forces Produces lower forces Consider Base Isolation System Consider Base Isolation System (Slip plane at bearing level with retainers) (Slip plane at bearing level with retainers)

SFOBB East Span Seismic Safety Project 52 3D View of Tower G Model

SFOBB East Span Seismic Safety Project 53 3D View of Tower G alone

SFOBB East Span Seismic Safety Project 54

SFOBB East Span Seismic Safety Project 55 Mode 2 (T=1.36 sec)

SFOBB East Span Seismic Safety Project 56 IMPACTY Displacement (Y=4.5 cm at top of tower, Y=11.5 cm at point of impact)

SFOBB East Span Seismic Safety Project 57 Y Spectral Displacement (9.7 cm at top of Tower)

SFOBB East Span Seismic Safety Project 58 Wind Displacement (4.4 cm at top of Tower)

SFOBB East Span Seismic Safety Project 59 Transverse Pushover Displaced Shape at X=0.45 m

SFOBB East Span Seismic Safety Project 60 Transverse Pushover 0 2,000 4,000 6,000 8,000 10,000 12,000 14, Displacement at Top of Tower (m) Base Shear (kN) No member buckling present at this load level – piles govern capacity Transverse Pushover Curve to 0.45 m

SFOBB East Span Seismic Safety Project 61 3D View of Tower G Model Pinned at the Base

SFOBB East Span Seismic Safety Project 62 Transverse Pushover Displaced Shape at X=1.0 m

SFOBB East Span Seismic Safety Project 63 Transverse Pushover 0 5,000 10,000 15,000 20, Displacement at Top of Tower (m) Base Shear (kN) Shear reductions are due to compression member buckling (tension members take over) Transverse Pushover Curve to 1.0 m

SFOBB East Span Seismic Safety Project 64

SFOBB East Span Seismic Safety Project 65

SFOBB East Span Seismic Safety Project 66 Tower G Conclusions Provide Vessel Impact energy absorption system (reduces overall demand on tower) Provide Vessel Impact energy absorption system (reduces overall demand on tower) Increase pile diameter and/or reduce bracing size (to provide more tower ductility) Increase pile diameter and/or reduce bracing size (to provide more tower ductility)

SFOBB East Span Seismic Safety Project 67 It should be noted that this Design Example is a first iteration in the design process and requires further refining in order to meet the full intent of the specified design requirements. As noted, there are several approaches to meet the requirements of the Drawings and Special Provisions.

SFOBB East Span Seismic Safety Project 68 Chris Traina Cash Flow Analysis

SFOBB East Span Seismic Safety Project 69 Early Pay Items Analysis

SFOBB East Span Seismic Safety Project 70 Steel Payments

SFOBB East Span Seismic Safety Project 71 Cash Flow Analysis

SFOBB East Span Seismic Safety Project 72 Rick Morrow  Outstanding Bidder Inquiries  Tower Mock-Up