Cost Efficiency Factor

Slides:



Advertisements
Similar presentations
Ewa Lidén Kassel Project No Presentation 2009 Tool 2 Cost/Benefit Check.
Advertisements

1 Bid And Proposal Evaluation Bill Shelton Scott Norton
Defense Contractor Financial Management presented to EPMC by Dr. Tony Perino.
Baselines for Recognizing Textual Entailment Ling 541 Final Project Terrence Szymanski.
© 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
The Weighted Guideline Approach
Cost Allocation Concepts Managerial Accounting Prepared by Diane Tanner University of North Florida Chapter 35.
Advertising Programs. Effects of Advertising Programs ¶ Cognitive stageExposure to message Message recall Awareness of product Knowledge of product attributes.
PPA 502 – Program Evaluation Lecture 10 – Maximizing the Use of Evaluation Results.
6 Chapter Training Evaluation.
1© 2013 by Nelson Education Ltd. CHAPTER TWELVE The Costs and Benefits of Training.
McGraw-Hill/Irwin © 2005 The McGraw-Hill Companies, Inc. All rights reserved Chapter Training Evaluation.
Prof. J.J Lew, P.E. Principal Investigator – Purdue Univ. James H. Anspach, P.G. Technical Advisor – So-Deep, Inc. C. Paul Scott, P.E. FHWA Advisor Kevin.
Benchmarking Method Glen Anderson, Chief of Party Climate Change Resilient Development Project Zagreb, Croatia June 29, 2015.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e PPNM’s/PNM’s Date: 29 Dec 2006.
Introduction ► This slide deck provides a suggested framework for the financial evaluation of an investment project. When evaluating any such project,
Plans to bring Out-of-Compliance UES Measures back into Compliance: 1. Agricultural Irrigation Hardware UES 2. Agricultural Motors UES Regional Technical.
On Target Group Coaching
1 Billing, Metering CRM/CIS America 2004 Transition Strategy: Manual Field Data Collection to AMR Implementation Chuck Session Manager, Cinergy Meter Reading.
PRESENTATION 9: PART III “Financial Documents” or “Financial Plan” MASTERS IN MARKETING & INTERNATIONAL BUSINESS JUAN ANTONIO CRUZ ALVARADO INSTITUTO CULINARIO.
Software Project Management
Leapfrog Hospital Rewards Program™: Implementation Options Catherine Eikel February 6, 2006.
5 Chapter Training Evaluation.
Equipment Costing: What You Don’t Track Can Hurt You (The Devil is in the Details)
1 Activity-Based Costing and Activity-Based Management
CS-411W VIII – Budgeting, Costing, and Pricing. Definitions Cost - the value of inputs that have been used to produce something. Inputs are typically.
Financial Project Metrics in Feasibility Study
Update: Grocery Refrigeration Provisional Standard Protocol for Site Specific Savings RTF Meeting June 28,
© 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
Organizational Design, Responsibility Accounting and Evaluation of Divisional Performance Chapter 18.
PMT 402 Defense Contractor Finance August 12, 2004 Jack Cash.
Copyright , Dennis J. Frailey CSE7315 – Software Project Management CSE7315 M16 - Version 8.01 SMU CSE 7315 Planning and Managing a Software Project.
1 Improving the Risk Management Capability of the Reliability and Maintainability Program An introduction to the philosophy behind the AIAA S-102 Performance-Based.
Reducing Project Duration CHAPTER NINE Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Change management control Sources of Change  Project scope changes  Implementation of contingency plans  Improvement changes ISE Ch. 6 1.
WUE Comprehensive Review Urban Conservation Projections Presentation To Water Plan Update Advisory Committee August 17, 2005.
Management & Development of Complex Projects Course Code - 706
Weighted Guidelines Cost Efficiency Factor. Cost Efficiency Provides additional profit $ for reduction in costs on the “pending” contract Range is 0 –
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
Explain the Impact of Poor Cost Information © Dale R. Geiger
(6) Estimating Computer’s efficiency Software Estimation The objective of Software Estimation is to provide the skills needed to accurately predict the.
C Learning Objectives Power Notes 1.Nature of Capital Investment Analysis 2.Methods of Evaluating Capital Investment Proposals 3.Factors That Complicate.
1. 2 Cost & Price Analysis Breakout Session # 312 Beverly Arviso, CPA, Fellow, CPCM, CFCM, Arviso, Inc. Melanie Burgess, CPA, CFCM, Burgess Consulting,
DR. Nabil Dmaidi F ACTORS THAT D ETERMINE V ARIATION IN E STIMATES.
Chapter McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. Short-Run Alternative Choice Decisions 26.
Chapter 3: Cost Estimation Techniques
Contracting Officer Podcast Slides
“Should Cost” Analysis
Cost Efficiency Factor
Allocation of Support Department Costs, Common Costs, and Revenues
Activity-Based Costing and Activity-Based Management
Activity-Based Costing
ANSI/EIA-748-B Earned Value Management Systems (EVMS)
Fort Stanwix National Monument Energy Audit Contract
Chapter 3: Cost Estimation Techniques
Chapter 20: Standard Costing: A Managerial Control Tool
“Should Cost” Analysis
Benchmarking Method Glen Anderson, Chief of Party
Allocation of Support Department Costs, Common Costs, and Revenues
Systems Design: Job-Order Costing
Chapter 3: Cost Estimation Techniques
Chapter 24: Capital Investment Decisions
Module 6: Return on Investment
Chapter 20: Standard Costing: A Managerial Control Tool
Power Notes Chapter M9 Capital Investment Analysis Learning Objectives
6 Chapter Training Evaluation.
Certified Cost or Pricing Data vs
Where We Are Now. Where We Are Now Rationale for Reducing Project Duration Time Is Money: Cost-Time Tradeoffs Reducing the time of a critical activity.
Where We Are Now. Where We Are Now Rationale for Reducing Project Duration Time Is Money: Cost-Time Tradeoffs Reducing the time of a critical activity.
Presentation transcript:

Cost Efficiency Factor Weighted Guidelines Cost Efficiency Factor

Cost Efficiency Provides additional profit $ for reduction in costs on the “pending” contract Range is 0 – 4% There is no normal value – start at 0 Contractor must provide justification with the proposal so it can be analyzed at the same time as other elements CO evaluates benefits to specific contract and assigns %

Approach to Analyzing WGL Cost Efficiency Step 1 – Top level review of contractor’s justification package eliminate any generic, superficial, inconsequential, ambiguous, etc. info that does not demonstrate a specific cost impact to your contract Examples “We have a cost savings program to reduce overheads and therefore deserve 2% cost efficiency.” “Historically the Program has implemented cost reductions resulting in the average cost coming in under contract cost.”

Approach to Analyzing WGL Cost Efficiency Step 2 – Review rationale for potential cost savings measures Is the cost savings reflected in the cost line? What is the basis for the estimate? How realistic are these savings? What is likely impact to your contract? Example “This new machine will save 10,000 hours at $80/hour for a total of $800,000”

Approach to Analyzing WGL Cost Efficiency Step 3 – Calculate cost impact to your contract (could be a number of initiatives added together) Savings should be consistent on the cost side and that quantified for cost efficiency Example: Government believes machine will save 8,000 hours at $80/hour or $640,000 on Contract F33657-02-C-0000/P00001

Approach to Analyzing WGL Cost Efficiency Step 4 – Determine Ktr share of cost savings How much should the Government share and how much should the contractor share? Consider cost to obtain savings (direct and indirect) Remember that increasing profit % improves contractor return on investment, even though cost baseline may be less Don’t lose sight of big picture This involves judgment Example: Contractor’s share of $640,000 is $192,000 (based on 70/30 share)

Approach to Analyzing WGL Cost Efficiency Step 5 – Translate contractor share into % of cost to determine cost efficiency % Take contractor share and divide by cost dollars (before cost of money) Example: $192,000/$19,167,382 is 1.0%

Summary There is no normal value – start at 0, until proven otherwise The savings must relate to the contract you are negotiating Think in terms of dollars, not just percentages 2% of $100,000,000 is $2,000,000 2% of $1,000,000 is $200,000 What is the magnitude of the savings?

Summary Cont’d. Content of Cost Efficiency Packages may duplicate support for other factors of Weighted Guidelines Examples from Management/Cost Control Criteria: Does the contractor have an aggressive cost reduction program that has demonstrable benefits? Does the contractor use a high degree of subcontract competition? Does the contractor aggressively seek process improvements to reduce costs? Conclusion: Contractors may be better served supporting other factors rather than Cost Efficiency where savings need to be related to pending contract.