STATUS OF THE LHC INJECTORS UPGRADE (“LIU”) PROJECT R. Garoby for the LIU Project Team March 6, 2012CERN.

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

Dr. José Miguel JIMENEZ LS2 Coordinator LHC Performance Workshop (Chamonix 2014) Session 8 - Long Shutdown 2 Strategy and Preparation Chair: José Miguel.
Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
Role of Management and Technical Coordination
Status of the PSB 2 GeV Upgrade and the RCS Study SGUI Meeting B. Mikulec, 07 July 2011.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Few slides from J. Fox’ talk in last November’s LARP meeting LARP CM
HL-LHC Project Kick-off Meeting Friday 15 th April 2011 Sylvain Weisz DG-DI-DAT on the behalf of the A&T Sector Projects Support Office.
LIU-IONS Linac3 meeting LIU Project – Planning and Installation Julie Coupard EN/MEF-OSS.
TS, Length of YETS EYETS LIU & CONS Project
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
HL-LHC/LIU Joint workshop Goal: Progressing towards an agreed set of 450 GeV beam parameters for High Luminosity operation in LHC after LS2 & LS3. Slides.
1 1. Some recent views ( ) 2 Linac tunnel
Plan. 12/05/ Who are we? PM (Project Management and Resource Planning) – APT – IMPACT – PPTEU2 – Plan LS1 – 2012 –…–… Plan V2 – From LS1 to LS2.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The Stripping Foil Test Stand in the Linac4 Transfer Line
THE LHC INJECTORS UPGRADE PROJECT - Organisation Malika Meddahi for Roland Garoby and the LIU Project Team.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
THE LHC INJECTORS UPGRADE (“LIU”) PROJECT R. Garoby for the LIU Project Team LIU-2011November 25, 2011CERN.
View From CERN Summary of Upgrade Projects:  Phase 1 IR upgrade: construction project  LINAC4: construction project  Phase 2 collimation: design finalization.
High Bandwidth damper Input from W.Hölfe Acknowledgement to all collaborators at SLAC, INFN, LBNL and CERNL Presentation of recent MD results (J.Cesaratto):
Linac4 Status 1 M. Vretenar sLHC public event
LIU-PSB Configuration Management EDMS Documentation, Layout and ECRs Thomas Birtwistle EN-MEF-DC.
Planning & Installation meeting New working group EDMS th October 2014LIU PLI meeting - J.Coupard1.
Accelerator and Technology sector organization from January, 1st, 2014 Frédérick Bordry 18 th November 2013.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
SPS proton beam for AWAKE E. Shaposhnikova 13 th AWAKE PEB Meeting With contributions from T. Argyropoulos, T. Bohl, H. Bartosik, S. Cettour.
LIU-SPS upgrade, schedule, target parameters and observed limits 1 B. Goddard, E. Shaposhnikova for LIU-SPS coordination team SPS scrubbing review
LHC Injectors Upgrade Project 1/12/2010 R. Garoby.
LIU budget cuts – SPS savings? First brainstorming discussions!!! BG 30/4/14.
Planning of Injector Activities for Linac4-to-PSB Connection and LS2 Thanks to all the valuable input from the LIU project leaders and LIU work- package.
LIU-SPS action list for BE/BI L. Jensen with input from BL, PI, QP, PM 27/08/2015Lars K. Jensen BE/BI/SW1.
LIU-SPS progress for BE/BI L. Jensen on behalf of BE/BI 27/08/2015Lars K. Jensen BE/BI/SW1.
28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. Long.
Agenda 1 BOSS Meeting - 27/5/ : :10 Introduction and aims of the workshop 10‘ 09: :25 Priorities from OP for PSB and transfer lines 15'
14/01/2005M. Giovannozzi - PS-SPS Days1 When can we have a clean Multiturn Extraction from the PS? M. Giovannozzi M. GiovannozziContentIntroduction Summary.
Linac4 Project Meeting 1/2011 3/3/2011 M. Vretenar Update on schedule and structure 1.
Impedance Working Group Update ICE meeting June 12 th 2013.
EVOLUTION OF BEAM CHARACTERISTICS DURING THE LIU PROJECT R. Garoby for the LIU Project Team March 7, 2012CERN.
End-of-year talk LIU-SPS BD WG meeting Our meetings in 2013 O During year - 9 meetings of LIU-SPS BD WG (less than usual 12 in the past :-)
LIU-Ions overall status and outlook: LEIR H. Bartosik for the LIU-IONS LEIR team* with lots of material from “Beam dynamics studies on LEIR”, H. Bartosik,
Introduction R. Garoby LIU 2014April 11,  LIU summary  LIU Highlights in 2013  Outcome of the «Review of LHC and Injectors Upgrade Plans» (Oct.2013)
LIU-PSB Overview K. Hanke for the LIU-PSB Working Group K. Hanke, LIU-2011, 25 Nov 2011.
1 st of April st LS2C LS2 Committee Mandate and Organization 2 Chairman:Jose Miguel JIMENEZ Deputy:Jean-Philippe.
High Intensity Beams in Existing Accelerators for CN2PY: SPS studies, PS issues E. Shaposhnikova Laguna-LBNO General Meeting CERN, Acknowledgments:
LIU EL-FC ACTIVITIES Georgi Minchev Georgiev EN-EL-FC EDMS
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Reminder of upcoming milestones For all machines: Nov. 2012:Table of performance parameters Jan. 2013: Baseline activities defined Feb. 2013: Update APT/EVM.
PS-LIU status S. Gilardoni – BE/ABP H. Damerau – BE/RF LIU-PT 27 Aug
Research progress and plan CERN-KEK Committee, 2nd meeting 07/Dec/07 Masamitsu AIBA CERN-Japan fellow, AB/BI.
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
LIU Critical Key activities in Long Shutdown 1 (2013) LIU-PSB: assuming LINAC4 connection in LS2 –Beam dump consolidation If not done: operation will be.
ELENA installation progress F. Butin / ELENA collaboration.
LHC Injectors Upgrade Project 11/11/2010 R. Garoby.
LIU-SPS Project baseline, objectives and reviews for 2016 B.Goddard 20/01/16.
LIU-PS Beam Dynamics Working Group Introduction and objectives
AFC 2017 (and 2018) AFC timeline:
BE-CO Activities for LIU-CPS and LIU-SPS
Installation of an Instrument on a CERN machine
LIU – EVM status and next steps
LIU–PLI report LIU SPS meeting.
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Update on the HiLumi/LIU parameters and performance ramp up after LS2
LIU project M. Meddahi LIU Project Team: G. Rumolo, J. Coupard, H. Damerau, A. Funken, S. Gilardoni, B. Goddard, K. Hanke, A. Lombardi, D. Manglunki, B.
Acknowledgments: LIU-PT members and deputies, H. Bartosik
Generation of Higher Brightness Beams for LHC
SPS collective effects Hannes, Gianni, Giovanni, Benoit, Yannis
Summary of session 9: "LHC Injectors Upgrade"
Presentation transcript:

STATUS OF THE LHC INJECTORS UPGRADE (“LIU”) PROJECT R. Garoby for the LIU Project Team March 6, 2012CERN

OrganizationOrganization Progress in 2011 Plan for 2012 and 2013 Plan beyond LS1 Resources Open issues

R.G. 3 LIU status - 6/03/2012 LIU-PSB coordination team K.Hanke – Activity leader B.Mikulec – Deputy V.Raginel – Scientific secretary /liu-project/liu-psb/ LIU- PS coordination team S.Gilardoni – Activity Leader H. Damerau– Deputy and Scientific secretary h/liu-project/liu-ps/ LIU-SPS coordination team B.Goddard E.Shaposhnikova – Deputy G.Rumulo – Scientific secretary liu-project/liu- sps/default.aspx LIU-Project Safety coordination L. Ponce Director of Accelerators and technology - Steve Myers LIU Project team Roland Garoby (Project Leader) - Malika Meddahi (Deputy) - Brennan Goddard (LIU-SPS machine coordinator) - Simone Gilardoni (LIU-PS machine coordinator) - Klaus Hanke (LIU-PSB machine coordinator) - Maurizio Vretenar (Linac4 Project Leader)- Laurette Ponce (Project Safety Officer)-Django Manglunki (LIU-Ion chain coordinator) Linac4 Project M.Vretenar project.web.c ern.ch/linac4- project/ LIU Administrative Support: Cécile Noels. Project Support: Pierre Bonnal, Sylvain Weisz, Tadeusz Kurtyka - EVM coordinators: De Jonghe, Benoît Daudin Project Organization Breakdown Structure

Organization Progress in 2011Progress in 2011 Plan for 2012 and 2013 Plan beyond LS1 Resources Additional issues

R.G. 5 LIU status - 6/03/2012 Achievements in 2011 Formal organization of the LIU project: Nomination of additional members of the project team (Project Safety Officer and responsible for ions) Adjustment of project scope with transfer of activities from Linac4 (H - injection the PSB and all PSB-related tasks) and Consolidation Definition of Work Breakdown Structure, most of Work Units, budget codes and budget needs. Scientific/technical achievements: Analysis of injectors’ potential using MDs and simulations Refinement of the required actions on equipment (upgrades and replacement) with reviews (e-cloud, 160 MeV injection, beam instrumentation…) Workshop with HL-LHC project in view of converging on beam characteristics.

Organization Progress in 2011 Plan for 2012 and LS1Plan for 2012 and LS1 Plan beyond LS1 Resources Additional issues

R.G. 7 LIU status - 6/03/2012 Goals for 2012 and 2013 Scientific/technical goals: Analysis of injectors’ potential using MDs and simulations in view of stating the final project goals in agreement with HL-LHC at the end of Specification of actions on equipment (upgrades and replacement) with reviews (e-cloud, …) Publication of Design Report in 2013, Preparation of future upgrades during LS1.5(?) and LS2. Management goals: EVM follow-up of the PSB upgrade. Specification of cost to completion at the beginning of Start of EVM follow-up of PS and SPS upgrades in 2013.

R.G. 8 LIU status - 6/03/2012 Main work on the accelerators during LS1 PSB: Construction of H - injection equipment (magnets, pulsers, vacuum chambers and valves…) Cabling for H - injection equipment Replacement of beam dump and crane Preparation for new main power converter (new building) Upgrade of beam instrumentation (new orbit measurement system and devices for H - injection) New LLRF and prototype RF cavity PS: Radiation shielding on Road Goward and above septum 16 Finemet-based longitudinal damper New beam instrumentation (fast BLMs, study of IPMs) Design/order of power converters for low energy correctors SPS: Preparation for upgrade of 200 MHz RF system Installation of aC coated vacuum chambers in 2-4 half-cells Upgrade of transverse damper Installation of wide band transverse feedback Beam instrumentation (BFCT upgrade, BGI development, new diamond BLMs, prototype mechanics for new wire scanner) Cabling! Cabling of fibre optic backbone and one LSS + some coaxial cables!

Organization Progress in 2011 Plan for 2012 and 2013 Plan beyond LS1Plan beyond LS1 Resources Additional issues

R.G. 10 LIU status - 6/03/2012 Overall Plan Linac4PS injector, PS and SPSBeam characteristics at LHC injection Continuation of construction… Beam studies § simulations Investigation of RCS option Hardware prototyping Test of new beam gymnastics Design § construction of equipment TDR 25 ns, p/b, ~3 mm.mrad 50 ns, p/b,  2 mm.mrad 2013 – 2014 (Long Shutdown 1) Linac4 beam commissioning Modifications and installation of some prototypes in PSB, PS and SPS Design § construction of equipment Progressive increase of Linac4 beam current Implementation of new PS beam gymnastics… PSB modification and connection to Linac4 during extentended winter shutdown If/when Linac4 connected: progressive increase of PSB brightness with benefits for PS and SPS. Equipment design § construction for PSB, PS and SPS Beam studies Possibly smaller emittance (25 ns) with new PS beam gymnastics… Limited gain from Linac4 proper (pending PSB, PS and SPS hardware upgrades) 2018 (Long Shutdown 2) Extensive installations in PSB, PS and SPS Hardware commissioning 2019 –2021 Beam commissioningAfter ~1 year of operation: beam characteristics for HL-LHC…

Organization Progress in 2011 Plan for 2012 and 2013 Plan beyond LS1 ResourcesResources Additional issues

R.G. 12 LIU status - 6/03/2012 Material budget (kCHF) Comment: planning after 2014 to be redone after the update of the LTP (dates of LS2)

R.G. 13 LIU status - 6/03/2012 Staff (from APT on March 5, 2012) Comment: amounts in 2009 and «bump» in 2013 result from inclusion in LIU of the PSB H - injection system and of miscellaneous consolidation items Grand Total BE PBU-PRJ PSU-PRJ SPU-PRJ IUM-PRJ BE Total EN PBU-PRJ PSU-PRJ SPU-PRJ EN Total TE PBU-PRJ PSU-PRJ SPU-PRJ TE Total Grand Total

Organization Progress in 2011 Plan for 2012 and 2013 Plan beyond LS1 Resources Additional issuesAdditional issues

R.G. 15 LIU status - 6/03/2012 Additional issues (1/2) Will there be an LS1.5 at ~end of 2016? Very useful for (1) making use of the investment in Linac4, (2) reducing risk (stop of Linac2) and (3) minimizing workload and time/risks for commissioning after LS2 (staging of the upgrades) Necessitates resources for work on the PSB during LS1 and preparation of cabling with Linac4. Need for planning LS2: at least 12 months for hardware installation + n months for hardware and beam commissioning. => no beam from the injectors during ~18 months.

R.G. 16 LIU status - 6/03/2012 Additional issues (2/2) Letter of support to the DOE for continuation of the development by US-LARP of a wideband transverse sytem in the SPS. Organization of publications in the Accelerator Sector Present situation is not satisfying (no easy means to identify the publications on LIU at least) Little progress from my side (lack of time) except for a draft proposal prepared with Malika. Suggestion to put someone in charge from the Project Support Office for refining a proposal, proposing it to the ATSMB and following its implementation