Bridge Construction Acceleration Craig Huss, P.E., Griffith Company.

Slides:



Advertisements
Similar presentations
ESTIMATING - A CONTRACTORS PERSPECTIVE. Company History/Background Oman Construction was founded in 1876 First bridge contract in 1881 First Highway Contract.
Advertisements

Project Scheduling for Load Testing Bridges for ENCE 667 Course Project Spring 2001 Justin Myers.
Innovative Contracting Techniques that Consider Driver Impacts Use of A+B Bidding Presented by: David L. Kent P.E. New York State Department of Transportation.
Using the LEARNING CYCLE to Build COMMUNITIES Granite Construction Inc. Pam Mayer Seema Khan Drew Erickson.
TDOT’s WORK ZONE SAFETY AND MOBILITY MANUAL Use & Implementation of Transportation Management Plan AASHTO Subcommittee on Design Dyan C. Damron, P.E. –
Having Fun with Gantt PERT &.
Manjari Akella Pranava Nagpal B-Tech(CSE) 4 th Year.
Bridge Traffic Lights Mimic Name:. Learning Objective How to use Flowol and the Bridge Light Mimic to safely control a set of traffic lights Learning.
Chapter 9: Reducing Project Duration
Reducing Project Duration
ELC 347 DAY 8. Agenda Questions Assignment 3 Corrected  4 A’s, One non-submit Assignment #4 Due Capstone Proposal Due Group Progress report due Exam.
Dedicated to improving home building since Understanding Installation and Costs of the Residential Fire Sprinkler Market.
Air traffic controllers (ATC) consideration and ATC solutions Session 5 Presentation 4.
Construction Scheduling and Estimating.  Someone gets an IDEA  The IDEA inspires a PLAN to be created  The PLAN is used to build the SCHEDULE  The.
2006 California Bridge Construction Forum Opening Remarks Dolores Valls, Chief, Statewide Operations Offices of Structure Construction.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
Digital Game Prgm I Large – Scale Design Process.
National Energy Technology Laboratory U. S. Department of Energy Project Kickoff Presentation December 16, 2003 Ken H. Green Principal Investigator Development.
Mark Kelly McKinnon Secondary College Gantt PERT Having Fun with &
Presented by: Kristi Shinall, Parsons; Jennifer Hall, P.E., Parsons;
OMG Operations Management Spring 1997 CLASS 16: Project Management Harry Groenevelt.
1 © 2003, Cisco Systems, Inc. All rights reserved. CCNA 3 v3.0 Module 4 Switching Concepts.
Module 7 Session 7.2 Visual 1 Module 7 Planning and Scheduling with the Critical Path Method Session 7.2 Scheduling and allocating resources with CPM.
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
Chapter 9: Reducing Project Duration
Chapter 15 Construction Scheduling. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify.
PROJECT SCOPING FOR LOCAL AGENCY FEDERAL AID PROJECTS.
1 Safety & Health Management. One of the most important factors that should be taken in consideration in the site, (from engineering point view), is the.
Project Management Managing the Transformation Process.
Option #1 - Award Current Contract Fastest route to begin and complete project and achieve seismic safety Award requires funding  Option #2 - Re-bid SAS.
1 © 2003, Cisco Systems, Inc. All rights reserved. CCNA 3 v3.0 Module 4 Switching Concepts.
Selling Construction Technology.  How is selling construction technology different than selling other products?  What steps are involved?
Transit Signal Priority (TSP). Problem: Transit vehicles are slow Problem: Transit vehicles are effected even more than cars by traffic lights –The number.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
Oracle's Distributed Database Bora Yasa. Definition A Distributed Database is a set of databases stored on multiple computers at different locations and.
1 © 2003, Cisco Systems, Inc. All rights reserved. CCNA 3 v3.0 Module 4 Switching Concepts.
PLANNING ACADEMY ECONOMIC IMPACTS OF AFFORDABLE HOUSING AND EXTENDED PERMIT DURATION TO A RESIDENTIAL DEVELOPMENT OCTOBER 22, 2013 JAY HIGGINS, AICP.
Authentic Learning Region X. What is it and why teach it? 21st Century Learning.
Reducing Project Duration CHAPTER NINE Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Reducing Project Duration CHAPTER NINE Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Screencast-O-Matic.  Offers opportunities for Differentiated Instruction …Another way to differentiate content is simply to permit the apt student to.
Civil Engineer Constantinos Chrystoforou. Civil Engineer Civil engineering is a professional engineering discipline that deals with the design construction.
A Recipe for Preparing a Schedule that Works Ulla Merz prepared for MPUG phone: (303)
Objectives Recap the different types of energy and energy transformations. Outcomes C: Describe different types of energy. B: Explain energy transformations.
Direct Cost AND Full Cost methods. What is cost? An expenditure, usually of money, for the purchase of goods or services. An expenditure, usually of money,
1 Grant Anticipation Revenue Vehicles (GARVEE) Bond Presented to the California Transportation Commission July 25, 2007.
VT 100 over the Mad River Bridge Replacement July 13, 2015.
BRIDGE CONSTRUCTION FORUM 2006 Work Window Restrictions.
Challenges and Solutions for IT Management of National Olympic Committees.
The Design/Build Contract. What Is A Design/Build Contract? Contract that combines design & construction into one agreement The design/build team provides.
BUAD306 Chapter 17 – Project Management. Life is a Project You are already a project manager! Fraternity/sorority projects Sport-related activities Family.
1 Pertemuan 6 Introduction to Ethernet/802.3 LANs.
1 CCNA 3 v3.1 Module 4 Switching Concepts Claes Larsen, CCAI.
1 Managing Projects Introduction to Project Management.
Fundamentals of Project Control Chapter 11 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project.
BEARING PILES: H-PILE. BEARING PILES  Structural element, a post or pile, which transfers the weight of a foundation to soil that can support it.  Ideal.
The Professional Engineer Stamp. PE Stamp Required: Optional Details Optional Procedures Optional Materials Structural Capacity Safety Results of.
Time-Cost Trade-off Models
Your Septic System Designing and its Maintenance.
The Construction Process TimeCost Linked Schedules Linked Estimating Recipes The Building Model: 5D Concept.
GEORGE WASHINGTON HIGHWAY WIDENING PROJECT E.V. WILLIAMS, INC.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
San Mateo Bridge Replacement Project Caltrain Replaces Four 100-Year-Old Rail Bridges May 2, 2013.
FOR LOCAL AGENCY FEDERAL AID PROJECTS
Engineering Project Management
Background and Objectives
FOR LOCAL AGENCY FEDERAL AID PROJECTS

Learning Objectives The student will analyze, evaluate and refine personal communication patterns. Class Discussion Question: What stops people from.
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
Presentation transcript:

Bridge Construction Acceleration Craig Huss, P.E., Griffith Company

Build Bridges Faster Sounds Easy But How? The Public Expects projects to be completed in shorter durations. Typically on a project with structures the structure is the longest task duration.

Impacts  Traffic Delays  Costs Direct Indirect

Some Areas of Discussion  Permit issues  Design  Mandated Time Frames  Productivity  Does it save money

Permit/Design  Can you design around permit issues?  Are their different designs that can be used to minimize actual time on the site?  What are the major permit issues?

Mandated Time Frames  What are the mandated time frames?  Which ones could be changed to shorten the project duration?

Productivity  Where can the actual construction be shortened?

Does it save money?

What are your ideas for building bridges faster?