Priscilla Cushman DUSEL S4 Workshop University of Minnesota Oct 1, 2009 Lead, SD Principle Investigators Priscilla Cushman (University of Minnesota) Dongming.

Slides:



Advertisements
Similar presentations
Assay and Acquisition of Radiopure Materials Priscilla Cushman University of Minnesota July 14, 2010 NSF Review PRESENTATION(s) OUTLINE P. Cushman S4 Management.
Advertisements

Underground Facilities Stub 2 Stub 2a,3 ‘H’ Area JIF Area The underground research facilities have evolved since dark matter studies began at Boulby. There.
Soudan Underground Laboratory Features Moderate depth (2100 mwe) augmented with active muon veto shield Existing infrastructure (power, water, networking,
Personal reflections, Belgrade, November 30,2009 Markus Nordberg, CERN/ATLAS.
ILIAS-JRA1 General meeting. Edinburgh. Sept Motivation Motivation Objectives Objectives Deliverables Deliverables Organization.
WP3: R&D on ultra low-level WP3: R&D on ultra low-level detectors and facilities JRA1 general meeting, Paris, Feb. 14 th 2006.
Henderson DUSEL Physics & Geoscience Workshops Lee Petersen, CNA Consulting Engineers Greg Hulne, Miller Dunwiddie Dale Holland, Dunham Associates.
WP3: R&D on ultra low-level detectors and facilities WP3: R&D on ultra low-level detectors and facilities status and outlook Matthias Laubenstein JRA1.
Status of activities of the WP4 on Radiopurity of Materials Pia Loaiza Laboratoire Souterrain de Modane JRA1 meeting Paris February 20 th, 2007.
WP3: R&D on ultra low-level detectors and facilities WP3: R&D on ultra low-level detectors and facilities LNGS: status and outlook.
Materials Assay & ICPMS for DUSEL R&D
WP3: R&D for ultra-low background techniques and facilities in the EU underground labs Dr. Matthias Laubenstein Laboratori Nazionali del Gran Sasso ITALY.
Cyberinfrastructure Breakout Session Looking 5 years ahead... Broad themes that emerged: A) Calibration tools and skill assessment (MInt, as) B) More examples.
Status of activities of the WP4 on Radiopurity of Materials Pia Loaiza Laboratoire Souterrain de Modane JRA1 meeting Paris February 14 th, 2006.
Low radioactivity at the Modane Underground Laboratory
DUSEL Low-Background Counting (to get the program started) Dongming Mei 1, Kevin Lesko 2,Christina Keller 1, Yongchen Sun 1, Zhongbao Yin 1, Keenan Thomas.
ILIAS Physics in deep underground laboratories JRA1 : Low background techniques WP4 : Radiopurity of materials Pía Loaiza Laboratoire Souterrain de Modane,
Low Background Counting Facility at Henderson DUSEL Lots of resources already exist, e.g. 1. Homestake NUSL Reference Design Report WBS 6.1 (Low-level.
DUSEL Experiment Development and Coordination (DEDC) Internal Design Review July 16-18, 2008 Steve Elliott, Derek Elsworth, Daniela Leitner, Larry Murdoch,
Supported by the European Commission, contract number: Fission , and the Research.
Introduction to BIM BIM Curriculum 01.
Low-Background Activation Analysis NAA for ultrapure materials analysis Richard M. Lindstrom Analytical Chemistry Division National Institute of Standards.
Full EXO in Cryopit Cryopit Workshop August 2011 David Sinclair.
Alex C. Mueller, MANETEURONS PCC-Meeting, Mainz (Germany), April 2006 EURONS 1st annual report: Generalities (I)  With an EC contribution of 14,056,000.
Low background Screening and Prototyping Facility at the Soudan Underground Lab 40’ x 35’ x 100’ cavern surrounded by a 99% efficient active muon veto.
A screening facility for next generation low-background experiments Tom Shutt Laura Cadonati Princeton University.
Low Background Counting, Materials Purity, Radon issue Prisca Cushman University of Minnesota Not LBC… New Name? AALRMS Assay and Acquisition of Low Radiation.
Outstanding Issues on Infrastructure and Development Fraser Duncan SNOLAB/Queen’s University 4 th SNOLAB Workshop 15 August 2005.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Meeting Summary Richard.
Harry Nelson UCSB HUSEP Ft. Collins Nov. 19, 2005 Lower Campus.
Fraser Duncan Queen’s University Synergies in Low Background Techniques 26 July 2005 Underground Facilities at SNOLAB.
APS April meeting Jacksonville, 2007 WIMP Search With SNOLAB Chris Jillings SNOLAB Staff Scientist For the DEAP-1 Collaboration.
A large water shield for dark matter, double beta decay and low background screening. T. Shutt - Case R. Gaitskell - Brown.
Construction and Development Status SNOLAB Workshop V 21 August 2006 Fraser Duncan.
Introduction to the “Cavities and vessels” session ( by L. Mosca) 9h 10’ Presentation of the Laboratoire Souterrain de Modane (15’+ 5’) G. Gerbier (Saclay)
1 Homes take DUSEL NSF Preliminary Baseline Review - April 13-15, 2010 Bob Altes Engineer- ISE Water Shield Engineering Figure Courtesy PDG and LBNL Homestake.
Underground Laboratories and Low Background Experiments Pia Loaiza Laboratoire Souterrain de Modane Bordeaux, March 16 th, 2006.
March 19, 2010Kara Keeter1 Ultra-Sensitive Immersion Tank MOTIVATION –WHOLE-BODY COUNTING –TARGET SENSITIVITIES TO – g/g U/Th, etc. –POLLING.
TopCAT Use Cases Priorities User Interface 1 ICAT developer workshop, August 2009 Laurent Lerusse – STFC
Ultra-low background gamma spectrometry 2 nd LSM-Extension Workshop, Valfréjus, 16 October 2009 Pia Loaiza Laboratoire Souterrain de Modane.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
CTF at Gran Sasso (overview of the hardware) Richard Ford (SNOLAB) (who has not been in the collaboration since 2004) March 19 th 2010.
CD FY09 Tactical Plan Status FY09 Tactical Plan Status Report for Neutrino Program (MINOS, MINERvA, General) Margaret Votava April 21, 2009 Tactical plan.
ILIAS Project Summary ILIAS is an Integrated Infrastructure Initiative that has pulled together all of Europe's leading infrastructures in Astroparticle.
New Product Development Page 1 Teddy Concurrent Engineering by Teddy Sjafrizal.
Deep Underground Science and Engineering Laboratory at Homestake1 Richard DiGennaro, LBNL DUSEL Project Manager 20 June 2008 Facility Planning for DUSEL.
Low Background Studies at the Soudan Underground Laboratory-9/20/ Low Background Studies at the Soudan Underground Laboratory The Soudan Underground.
Homestake DUSEL Project Management and Systems Engineering Richard DiGennaro LBNL April 20, 2007.
A screening facility for next generation low-background experiments Tom Shutt Case Western Reserve University.
DUSEL Development Process: The Roadmap from Science & Engineering Plan to the Facility Description Lee Petersen CNA Consulting Engineers.
Luciano Pandola, INFN Gran Sasso Luciano Pandola INFN Gran Sasso Genova, July 18 th, 2005 Geant4 and the underground physics community.
Template for DUSEL Meeting with Potential Experiments.
Thomas Gutberlet HZB User Coordination NMI3-II Neutron scattering and Muon spectroscopy Integrated Initiative WP5 Integrated User Access.
GeMPI-type low background counting system for SURF Kara Keeter 15 September 2014.
Toward a coherent program in Assay and Related Technologies Priscilla Cushman LRT2013 University of Minnesota LNGS April 10, 2013.
The Princeton NaI Experiment (SABRE) Frank Calaprice Princeton University Cosmic Frontier Workshop SLAC March
Workshop summary Outline  Workshop’s aims  Highlights from the presentations (my selection!)  Costing Exercise – What we learnt  Summary - Roadmap.
Oxygen Deficiency Hazards Analysis for MAJORANA Temporary Clean Room Steve Elliott Los Alamos National Laboratory.
Main Entry: syn·er·gy Inflected Form(s): plural -gies Etymology: New Latin synergia, from Greek synergos working together A mutually advantageous conjunction.
LBNF/DUNE Update Public Meeting Sanford Lab Update
SuperCDMS & Radon Ray Bunker
Presented by Terry Peckham
T5.2: Harmonization - Material and Component Reference
Introduction to IDEA Outline Andrea Giuliani What is IDEA ?
General Issues We will need to understand infrastructure requirements
Evolving an ILC focused SCRF Facility from the XFEL Infrastructure
Budgeting and fund raising
Assay and Acquisition of Radiopure Materials
Radiological and Environmental Monitoring System (REMS)
Integrated Double-beta-decay European Activity
Presentation transcript:

Priscilla Cushman DUSEL S4 Workshop University of Minnesota Oct 1, 2009 Lead, SD Principle Investigators Priscilla Cushman (University of Minnesota) Dongming Mei (University of South Dakota) Kara Keeter (Black Hills State University) Richard Schnee (Syracuse University) Assay and Acquisition of Radiopure Materials Characterize radon, neutron, gamma, and alpha/beta backgrounds at Homestake Develop a conceptual design for a common, dedicated facility for low background counting and other assay techniques. Assist where appropriate in the creation of common infrastructure required to perform low background experiments. Perform targeted R&D for ultra-sensitive screening and water shielding Engineering Consortium CNA Consulting Engineers (Lee Petersen) Dunham Associates Miller Dunwiddie Architecture, Inc

Priscilla Cushman DUSEL S4 Workshop University of Minnesota Oct 1, 2009 Lead, SD Structure of AARM S4 Process Conventional Design of the Facility for AARM by Engineering Consortium Based on Information from the Users (YOU!) Gleaned and organized by the Co-PIs YOU are represented by the following “AARM Scientific Collaboration” who has already given feedback, but must continue to provide information as the process evolves. Scientific Collaboration Craig Aalseth Henning Back Tim Classen Jodi Cooley-Sekula Yuri Efremenko Reyco Henning Jeff Martoff Robert McTaggart Esther Mintzer Tullis Onstott Andreas Piepke Andrew Sonnenshein John Wilkerson

Priscilla Cushman DUSEL S4 Workshop University of Minnesota Oct 1, 2009 Lead, SD International Scientific Advisory Panel Laura Baudis (Zurich University) Richard Ford (Queen’s University, SNOLab) Gilles Gerbier (CEA Saclay) Gerd Heusser (Max Planck Institute, Heidelberg) Andrea Giuliani (University of Insubria (Como), Coordinator of ILIAS Continuation) Mikael Hult (European Commission: JRC Inst. for Reference materials and Measurements) Vitaly Kudryavtsev (University of Sheffield) Pia Loaiza (Laboratoire Souterrain de Modane) Matthias Laubenstein (INFN, Gran Sasso Laboratory) Neil Spooner (University of Sheffield) Integrate Effort with European Labs The Synergy Workshops and Integrative Website were dropped: budget 1.3M  1.0M (linking research fields and linking multiple sites) Same thing happened in ILIAS Next process via reviewer comments ** Difficult to fund interdisciplinary projects ** But, we will still draw heavily from expertise in existing Low Background Facilities via

Priscilla Cushman DUSEL S4 Workshop University of Minnesota Oct 1, 2009 Lead, SD Cost effective sharing of resources, close to experiments Unified scheduling tools and infrastructure will streamline counting and match users to the sensitivity and modality needed. Common materials database and shared experience Electronics pool, code repository, unified analysis system Expert Technicians and Training center can become a center for new R&D in screening and assay develops new field of low background techniques Large enough to include on site clean machine shop, chemical services, radon-free storage and assembly areas, common shielding and shielding elements available Why do we need an LBCF? Why do we need a common Low Background Facility?

Priscilla Cushman DUSEL S4 Workshop University of Minnesota Oct 1, 2009 Lead, SD Why do we need other sites as well? Urgency of screening: DUSEL experiments need to begin screening NOW Design parameters are determined in part by material selection Prototypes are being built now Sanford is not yet up to speed, Multiple sites can help Economy of scale only goes so far Experiments are designed and built at local institutions Local on-site analysis/screening inexpensive access, quick turn-around, student training Cooperative agreements with local industry, accelerators, commercial labs can generate user fees and foster synergies with other fields Some specialty users may prefer a different site e.g. high security, different rock or bugs, different bkgds There are no resources in the S4 to unify and facilitate multiple sites Can we identify funding source(s) to create Training Centers at existing sites (Kimballton, WIPP, Soudan, Oroville) Establish loan programs and jump start purchases of detectors the will eventually be part of the DUSEL AARM system?

Priscilla Cushman DUSEL S4 Workshop University of Minnesota Oct 1, 2009 Lead, SD Points of Contact, Meeting Summary We have filled out the docs contact form Spokesperson: P. Cushman AARM Engineer: L. Petersen EH&S Contact: K. Keeter E&O Coordinator: C. Keller Liaison Engineer: S. Marks Liaison Scientist: Y-D Chan Met with about 10 members of the AARM Scientific Collaboration plus Dave Plate and Steve Marks Firmed up plans for FAARM design and determined location Discussed interface between AARM, Facilities, and the Experiments New floor plan will be distributed in 2 weeks, need feedback in a month Recast our “Program Infrastructure” spreadsheet into official docs form (2 weeks)

Priscilla Cushman DUSEL S4 Workshop University of Minnesota Oct 1, 2009 Lead, SD Facility for AARM (FAARM) Staged approach to cleanliness and shielding Class 2000 clean room & Rn mitigation throughout. Shielded room with easy access Additional separate Class 100 (or 500) clean rooms (sample handling, assembly) Additional shielding for screeners, Special water shield for sensitive applications. Veto shield for the most sensitive applications and for Prototypes (e.g. dark matter)

Priscilla Cushman DUSEL S4 Workshop University of Minnesota Oct 1, 2009 Lead, SD 4850 level = Facility for AARM (FAARM)  screening and support infrastructure rendered images from CNA Engineering

Priscilla Cushman DUSEL S4 Workshop University of Minnesota Oct 1, 2009 Lead, SD Facility for AARM (FAARM) Refinement of Design New plan will be drawn, including first pass at sensitivities for each screener Distribute to AARM Collaboration and all S4 PI which labeled screeners will you use and for how long? Typical use of clean room, storage needs, machining needs Protoyping? Ultra-sensitive screening type, size, sensitivity.

Priscilla Cushman DUSEL S4 Workshop University of Minnesota Oct 1, 2009 Lead, SD 4850-ft level deep enough for ultra sensitive screening and dark matter prototype testing close to experiments for easy access (drive in large items) share water purification and cryogen infrastructure Open Questions tend to be about duplication with facilities or experiments Location and commonality of Water Purification and Cryogen system Nitrogen liquifier and distribution system? !st stage of water purification for shield Confirmed 4850 level Radon mitigation for the whole lab or just for us? Additional Cu Electroforming probably required timescale of handing over the Majorana facility

Priscilla Cushman DUSEL S4 Workshop University of Minnesota Oct 1, 2009 Lead, SD Davis Cavern Ross Shaft Standard Lab Modules Yates Shaft New Drifts at 4850L Existing Drifts Staging Area New Drift to 5040L Large Cavity 1 Project Scope (LM) Project Scope (LC) #6 Winze New Winze New Bypass Drift and Large Cavity Utility Area at 4850L Small Lab Module Confirmed 4850 level Define overall size and location FAARM Expt

Priscilla Cushman DUSEL S4 Workshop University of Minnesota Oct 1, 2009 Lead, SD New Winze Confirmed 4850 level Located at back of Module 2 Expt Shielded Clean Assembly Prototyping Main Entrance Emergency Egress

Priscilla Cushman DUSEL S4 Workshop University of Minnesota Oct 1, 2009 Lead, SD Water Shield Design Modular, stackable containers vs Steel frame support vs custom wall We will move ahead quickly on vendor quotes Simulation of thickness and sensitivity requirements still needs to be done properly, but General consensus that we go for the gamma reduction as well as the rock radioactivity  3 m water e.g. commercial vendor Dufrane Nucear Shieding

Priscilla Cushman DUSEL S4 Workshop University of Minnesota Oct 1, 2009 Lead, SD Ultra-sensitive Immersion Tank Identity Crisis I. A very pure water shield into which we put several high sensitivity screeners or even whole prototype experiments (e.g. high pressure Xe or …?) or II. A Sensitive Detector into which we dip large items that need whole body counting LUX water tank may be available for purpose I at the right timescale but we need to plan our requirements – let Facilities integrate Need both applications eventually Explore a double tank or concentric tank solution more real estate required… It is there because it needs to be! Goal: – g/g U/Th Ideas, but no existence proof yet – include only a footprint for April 2010

Priscilla Cushman DUSEL S4 Workshop University of Minnesota Oct 1, 2009 Lead, SD Other levels are also part of AARM 800’ level Storage of Materials (overburden and radon-free) copper, lead, small components Pre-screeners and NAA gamma counters Radiochemistry labs for NAA Chemical Assay and/or Cu Electroforming Coordinate with Majorana (e.g. might be at 4850’) Define Surface Facilities NAA receiving Later additions may include ICPMS, Surface Characterization Lab (PIXE, SIMS, RBS, Auger …)

Priscilla Cushman DUSEL S4 Workshop University of Minnesota Oct 1, 2009 Lead, SD Milestones for the AARM Cooperative Agreement Site Characterization and Simulation Studies

Priscilla Cushman DUSEL S4 Workshop University of Minnesota Oct 1, 2009 Lead, SD Milestones for the AARM Cooperative Agreement Determining the parameters of the FAARM

Priscilla Cushman DUSEL S4 Workshop University of Minnesota Oct 1, 2009 Lead, SD Milestones for the AARM Cooperative Agreement Translating this into a Conceptual Design