Chapter 9 Inventory Kanbans Automating the Replenishment Cycle.

Slides:



Advertisements
Similar presentations
Pull System Workshop THE GOAL: Directly link all processes - from the customer back to raw material suppliers - to improve responsiveness, shorten lead.
Advertisements

Lean Manufacturing.
Lean Systems. Characteristics of Lean Systems: Just-in-Time Pull method of materials flow Pull method of materials flow Consistently high quality Consistently.
WAREHOUSING MANAGEMENT
Just-in-Time Inventory Management Definition: Produce the right items in the quantities needed by subsequent processes at the time needed. Goals: Eliminate.
Inventory Management 2.
© Improvement Initiatives (used with permission of author) freeleansite.com The Lean Enterprise Lean Foundations Continuous Improvement Training Lean Foundations.
Inventory Kanbans Automating the Replenishment Cycle
CHAPTER FIFTEEN JUST-IN-TIME SYSTEMS Chapter 15 Just-In-Time Systems.
Lean Supply Chains Chapter Fourteen McGraw-Hill/Irwin
Kanban Training A Comprehensive Training Tool for Using Kanban.
Chapter 3 Planning for Production. Objectives Product oriented manufacturing systems versus people oriented manufacturing systems. Manufacturing smaller.
Just-In-Time and Lean Systems
Operations Management Just-in-Time Systems Supplement 12
Beni Asllani University of Tennessee at Chattanooga
Summary: Review of Lean Principles
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
CHAPTER 14 Just-In-Time Systems.
S12-1 Operations Management Just-in-Time and Lean Production Systems Chapter 16.
JIT and Lean Operations
JIT and Lean Operations. MRP (push) and JIT (pull) system PULL SYSTEM PUSH SYSTEM A PUSH system where material is moved on to the next stage as soon as.
JIT/Lean Production Chapter 13.
KANBAN An LT6 Training Sesion.
Benefits of Lean Manufacturing: To benefit from Lean Manufacturing, the processes must be maintained consistently and correctly. Everyone involved must.
The Lean Enterprise VSM Symbols VSM Symbols Lean Foundations Continuous Improvement Training Lean Foundations Continuous Improvement Training.
© Improvement Initiatives (used with permission of author) freeleansite.com The Lean Enterprise Lean Foundations Continuous Improvement Training Lean Foundations.
Operations Management
1 Chapter 16 Just-In-Time Systems. 2 JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and.
JIT and Lean Operations
1 Creating Connected Process Flow MHR Just-in-Time  Right part  Right amount  Right time  Right place.
Alissa Brink Gabriela Iasevoli Jason Oesterle Joey Tamburo
JIT/Lean Production Chapter 13. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall Define Just-in-Time.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15 JIT and Lean Operations.
MBA.782.J.I.T.CAJ Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.
Manufacturing.  Manufacturing is all about converting raw material into consumer or industrial products.  A firms manufacturing competency is based.
JIT – Just-In-Time Production
Just-in-Time and Lean Systems
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
POUS Point Of Use Storage. Agenda POUS AGENDA »Introduction and definition Agenda | »Why / Benefits »Examples »When to Use, Not to Use »How to Implement.
Just in Time Chapter 9 Vollmann, Berry, Whybark, Jacobs.
“Without the Cost of Waste …”
Quantity and Delivery Marketing 3860 – Purchasing July 20, 2004 Kimball Bullington, Ph.D. Associate Professor of Operations Management Middle Tennessee.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Chapter 16.
Chapter 29 Waste Elimination. Objectives Select and apply techniques for eliminating or preventing waste. Pull systems, Kanban, 5S, standard work, & poka.
1 Employability skills (a) Employers value people who: fit well into their team and workplace use initiative to solve routine problems work productively.
Lean Production and the Just-in-Time Philosophy. Lean Production Elimination of All Waste – Waste is Anything that Does Not Add Value to Product. Continuous.
Just-In-Time Systems. JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and goods occur just.
The Kan Ban Game. 2 © The Delos Partnership 2003 To understand how Kanbans Aid the transition from a Push to a Pull System Facilitate Continuous Improvement.
1 Lean Office - Pull Kanban, Just in Time, Standardized Work
Lean Production.
JIT and Lean Operations Group Members:. JIT/Lean Production Just-in-time (JIT): A highly coordinated processing system in which goods move through the.
Operations Fall 2015 Bruce Duggan Providence University College.
© The McGraw-Hill Companies, Inc., Just-in-Time and Lean Systems.
CHAPTER 15 LEAN SYSTEM. THE CONCEPTS Operation systems that are designed to create efficient processes by taking a total system perspective Known as zero.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Lean Supply Chains Chapter 12.
JIT and Lean Operations Characteristics of Lean Systems: Just-in-Time  Pull method of materials flow  Consistently high quality  Small lot sizes  Uniform.
16-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
CHAPTER 9 Lean Manufacturing.
JIT/Lean Production Chapter 13.
Chapter 12 Lean Production. Chapter 12 Lean Production.
IENG 451 / 452 Just In Time Processes: Cells, Stores, Kanban, Demand
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
LEAN ORGANIZATION SUMMARY
Pull Production/ Just In Time
andon Japanese term for a signaling system announcing problems
Kanban Production Just in time Systems
Introduction to Materials Management
MODERN TRENDS IN PRODUCTION ENGINEERING
Kanban Replenishment for All Types of Industries
Chapter 12 Lean Production. Chapter 12 Lean Production.
Presentation transcript:

Chapter 9 Inventory Kanbans Automating the Replenishment Cycle

IT-465 Lean Manufacturing2 Kanban A Japanese word that means signboard or signal. Are signals developed to automate the inventory replenishment cycle for items used repetitively in a facility Communicate the need for additional material to be pulled from the supplier Integral in a “pull” manufacturing system.

IT-465 Lean Manufacturing3 Typical Kanban Signal An empty container designed to hold a standard quantity of material or parts. The container is sent back to the supplier from the customer when empty. If returnable containers are not used, a kanban can be as simple as a laminated card.

IT-465 Lean Manufacturing4 Kanbans Are: –Communication devices from the point of use to the previous operation. –Purchase orders for your suppliers. –Work orders for your manufacturing area. –Visual communication tools. –Paperwork eliminators.

IT-465 Lean Manufacturing5 Kanbans Are not appropriate for: –Single piece or lot production –Safety stock –Systems which push inventory carrying requirements and the associated carrying costs back to the supplier. –Long range planning tools.

IT-465 Lean Manufacturing6 Kanbans Reduce Waste Eliminate –Over-production –The need for a stockroom –The need to reissue purchase orders Reduce: –The data management task for prod plng, work orders –Inventory –Parts expediting –Parts shortages –Material handling

IT-465 Lean Manufacturing7 Types of Kanbans (Pull Signals) Cards attached to portable containers such as tote pans Supplier replaceable cards on cardboard boxes designed to hold a standard quantity A painted spot or border on the floor around the standardized container Color coded striped golf balls s Bar code labels Variations of above

IT-465 Lean Manufacturing8 Summary Kanbans tie related processes together as if they were connected by an invisible conveyor. Kanbans: –Improve communication –Improve customer satisfaction –Reduce inventories –Reduce waste

IT-465 Lean Manufacturing9 Pull Systems Outcomes Define Pull system Define supermarket Define kanban

IT-465 Lean Manufacturing10 Production Scheduling Constantly change Production never produces to a schedule Utilize MRP (Material Resource Planning)

IT-465 Lean Manufacturing11 Supermarket Pull

IT-465 Lean Manufacturing12 Scheduling

IT-465 Lean Manufacturing13 Small-Lot Production + Leveling

IT-465 Lean Manufacturing14 Leveling Work Volume

IT-465 Lean Manufacturing15 Leveling Work Volume

IT-465 Lean Manufacturing16 Flow

IT-465 Lean Manufacturing17 The Problem with Inventory

IT-465 Lean Manufacturing18 Kanban Types Production Kanban “One-per-customer” kanban Supplying process can produce as little as one container Signal (Triangle) kanban “One-per-batch” kanban Signals when a reorder point is reached and another batch needs to be produced Used in supplying process where changeovers are required Withdrawal kanban “Shopping list” kanban Instructs the material handler to get and transfer parts

IT-465 Lean Manufacturing19 The Six Steps of Kanban 1.Consumption process withdraws only what is needed 2.Produce to replenish only what is withdrawn by the next process 3.Do not send defective products to the next process 4.Parts must not produced and conveyed when there is no kanban 5.Kanban must be attached to the actual parts or container 6.The actual number of parts in the container must match the number on the kanban

IT-465 Lean Manufacturing20 One Piece Flow Goal Represents a special case of kanban Lot size/quantity is one Benefits Minimizes waste in the process Defects affect only one component thus creating highest possible quality Minimizes inventory and space requirements Keeps pace with customer demand Efficiently utilizes labor in a balanced process Best possible throughput in a balanced process

IT-465 Lean Manufacturing21 Signal Kanban System

IT-465 Lean Manufacturing22 Summary Pull Systems –Single scheduling point –Produce to replenish use –Customer demand creates production Level loading Kanban