Doc.: IEEE 802.11-06/1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 1 TGn Opening Report London, UK 802 Interim – 15-19 January ‘07 Date: 2007-01-13.

Slides:



Advertisements
Similar presentations
Doc.: IEEE /130r0 Submission January 2006 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process Notice: This document has been prepared to assist IEEE.
Advertisements

Doc.: IEEE /1934r3 Submission January 2007 Bruce Kraemer, MarvellSlide 1 TGn Opening Report London, UK 802 Interim – January ‘07 Date:
Doc.: IEEE /1702r0 Meeting Report September 2006 Pat R. Calhoun, CiscoSlide 1 Report of TGv – November 2006 DATE: November 2006 Author(s) NameCompanyAddressPhone .
Doc.: IEEE /1662r0 Submission November 2006 Bruce Kraemer, MarvellSlide 1 TGn Opening Report Dallas, TX 802 Plenary November ‘06 Date:
Doc.: IEEE /840r2 Submission June 2006 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process, June Notice: This document has been prepared to assist.
Doc.: IEEE /1623r0 Submission November 2006 Jim Petranovich, Conexant Systems, Inc.Slide 1 PHY Ad Hoc Nov 1 Agenda and Minutes Notice: This document.
Doc.: IEEE /0287r2 Submission January 2006 Adrian Stephens, Intel Corporation TGn Editor Candidate – Adrian Stephens Notice: This document has.
Doc.: IEEE /1588r0 Submission October 2006 Bruce Kraemer, MarvellSlide 1 TGn ad hoc Opening Report – October 17 ‘06 Notice: This document has.
Doc.: IEEE /0420r0 Submission March 2008 Bruce Kraemer, MarvellSlide Marvell Lane, Santa Clara, CA, TGn Closing Report Orlando, FL,
Doc.: IEEE /1662r4 Submission November 2006 Bruce Kraemer, MarvellSlide 1 TGn Opening Report Dallas, TX 802 Plenary November ‘06 Date:
Doc.: IEEE /0913r1 Submission Sep 19-23, 2005 TK Tan (Philips) Slide 1 WNG SC Committee Report IEEE , Orange County, California, September.
Doc.: IEEE /0308r0 Submission March 2005 J. Walker, Intel Corporation, D. Stanley, Agere SystemsSlide 1 March 2005 ADS Closing Report Notice:
Doc.: IEEE /1936r0 Submission December 2006 Bruce Kraemer, Marvell Adrian Stephens, IntelSlide 1 TGn Proposed Draft Revision Notice Notice: This.
February 2006 Richard Paine, BoeingSlide 1 doc.: IEEE /0258r0 Submission 11k Brisbane 2 Agendas Notice: This document has been prepared to assist.
Doc.: IEEE /0646r0 Submission July 2005 Richard Paine, BoeingSlide 1 11k Cairns Agendas Notice: This document has been prepared to assist IEEE.
Doc.: IEEE /1528r0 Submission 22 September 2006 Naveen Kakani, Nokia, IncSlide 1 TGn PSMP adhoc Group September Closing Report Notice: This document.
March 2006 Richard Paine, BoeingSlide 1 doc.: IEEE /0261r0 Submission 11k Denver Ad Hoc Agenda Notice: This document has been prepared to assist.
Doc.: IEEE /1662r3 Submission November 2006 Bruce Kraemer, MarvellSlide 1 TGn Opening Report Dallas, TX 802 Plenary November ‘06 Date:
TGn ad hoc Opening Report – July 31 ‘06
TGp Opening Date: Authors: January 2007 Month Year
TGn ad hoc Opening Report - January ‘07
TGn ad hoc Opening Report – July 31 ‘06
TGn ad hoc Opening Report – May 31 ‘06
TGn Opening Report London, UK 802 Interim – January ‘07
TGn Opening Report Dallas, TX 802 Plenary November ‘06
11k Vancouver Ad Hoc Agenda
TGn ad hoc Opening Report – July 31 ‘06
TGn Opening Report Dallas, TX 802 Plenary November ‘06
TGn ad hoc Opening Report - November ‘06
TGn ad hoc Opening Report - November ‘06
TGn PSMP Ad-hoc July 2007 Date: Authors: July 2007
TGn Chairs’ Closing Report Waikoloa, HI 802 Interim – Sep ‘07
TGn LB97 Frame Format Ad Hoc
TGn ad hoc Opening Report - January ‘07
TGn Opening Report London, UK 802 Interim – January ‘07
TGn ad hoc Opening Report - January ‘07
TGn Opening Report London, UK 802 Interim – January ‘07
TGn ad hoc Opening Report - November ‘06
TGn Closing Report Waikoloa, HI, US 802 Plenary – 8-12 September ‘08
TGn Opening Report London, UK 802 Interim – January ‘07
TGu Agenda Date: Authors: May 2006 May 2006
TGn LB97 Frame Format Ad Hoc
TGp September Opening Presentation
TGn Closing Report Waikoloa, HI, US 802 Plenary – 8-12 September ‘08
IEEE White Space Radio Status Report
TGn PSMP ad hoc Agenda – September 14 ‘06
TGp Closing Report Date: Authors: March 2006 Month Year
TGn ad hoc Opening Report – July 31 ‘06
TGn Opening Report Dallas, TX 802 Plenary November ‘06
TGn ad hoc Opening Report – July 31 ‘06
TGn Closing Report – November 05
TGs Process, July Date: Authors: July 2006 July 2006
TGn Closing Report – March ‘06
March Plenary Opening Report
November Plenary Opening Report
Coex Ad Hoc January London Agenda and Report
[place presentation subject title text here]
November Plenary Opening Report
TGn Editor Report March 2007
IEEE P Wireless RANs Date:
TGn Proposed Draft Revision Notice
TGn Closing Report Montreal, Quebec, CA 802 Interim – 18 May ‘07
Agenda and minutes TGn PHY ad hoc
TGn Closing Report – July ‘06
IEEE P Motions at the July Plenary EC Meeting
TGn Closing Report Orlando, FL, US 802 Plenary – March ‘07
TGn Editor Report March 2007
IEEE P Motions at the July Plenary EC Meeting
PSMP Adhoc Oct TGn Adhoc
TGn Closing Report - July 19 ‘07
Presentation transcript:

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 1 TGn Opening Report London, UK 802 Interim – January ‘07 Date: Authors: Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE Working Group. If you have questions, contact the IEEE Patent Committee Administrator at. Name Company Address Phone Bruce Kraemer Marvell Garth Hillman AMD 5402 East Ben White, Austin TX (512) Sheung Li Atheros 5480 GAP, Santa Clara, CA (408) Adrian Stephens Intel Corporation 15 JJ Thompson Avenue, Cambridge, CB3 0FD, UK +1 (503) om 5488 Marvell Lane, Santa Clara, CA, 95054

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 2 You are here

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 3 Welcome to London, UK Monday – Friday, January This document 06/1934 Hilton Metropole Meetings Rooms TGN 1 (Main Room) = Sandringham 1 (West 3) except Monday pm 1 & pm2 Balmoral 2 (West 3) Classroom seating TGN 2 (ad hoc) = Meeting room 1-2 (Bus Ctr 2) Theater seating TGN 3 (ad hoc) = Meeting room 3-4 (Bus Ctr 2) Classroom seating

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 4

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 5 Inappropriate Topics for IEEE WG Meetings Don’t discuss the validity/essentiality of patents/patent claims Don’t discuss the cost of specific patent use Don’t discuss licensing terms or conditions Don’t discuss product pricing, territorial restrictions, or market share Don’t discuss ongoing litigation or threatened litigation Don’t be silent if inappropriate topics are discussed… do formally object. If you have questions, contact the IEEE-SA Standards Board Patent Committee Administrator at or visit This slide set is available at Approved by IEEE-SA Standards Board – March 2003 (Revised January 2006)

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 6 Attendance, Voting & Document Status Make sure your badges are correct Questions on Voting status, Ballot pool, Access to Reflector or member’s area –see Harry Worstell – If you plan to make a submission be sure it does not contain company logos or advertising

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 7 TGn Opening Report Dallas, TX 802 Plenary November ‘06 Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE Working Group. If you have questions, contact the IEEE Patent Committee Administrator templates have changed

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 8 Attendance 1.Register 2.Indicate attendance

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 9 TGn Quick Review of Events prior to this meeting

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 10 One Page History of TGn HTSG formed – First meeting (Sep-11-’02 Monterey) TGn formed – First meeting (Sep-15-’03 Singapore) Began call for proposals (May 17 ’04 Garden Grove) 32 First round presentations (Sep 13 ’04 Berlin) Down selected to one proposal (Mar ’05 Atlanta) –first confirm vote failed Confirmation vote #2 failed - reset to 3 proposals -left the May ‘05 meeting with a serious deadlock. (Cairns) 3 proposal groups agreed to a joint proposal activity (Jul ’05 San Francisco) JP proposal accepted by vote of 184/0/4, editor instructed to create draft (Jan ’06 Waikoloa) Baseline specification converted into Draft 1.0 (335p). Letter ballot issued (LB84) March ’06 (Denver) and closed on April 29 (failed) Draft 1.0 Comment resolution begins (May ’06 Jacksonville) Approved 6711 editorial and 1041 technical resolutions; Created Draft 1.03 (Jul ’06 San Diego) Approved 568 technical resolutions in Sep ’06 Melbourne; Created Draft 1.06 (388p) Approved 703 technical resolutions in Nov ’06 Dallas; Created Draft 1.09 (444p)

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 11 11n - Overall timeline PAR Approved TGn Formed Selection Process & Criteria Call for Proposals Proposal Presentation s Down Select 1st WG Letter Ballot First Sponsor Letter Ballot REVCOM Approval Publication HT SG Formed Joint proposal Confirmation 2 nd WG Letter Ballot

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 12 Letter Ballot #1 Comments EditorialTechnical Editorial & Technical UniqueDuplicate

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 13 TGn Ad Hoc Organization Ad Hoc TopicAd hoc leader PSMPNaveen Kakani CA DocSheung Li Frame FormatPeter Loc PHYJim Petranovich MACMatt Fischer CoexistenceDon Schultz Eldad Perahia Beamforming & AdaptationJohn Ketchum Joonsuk Kim GeneralJon Rosdahl EditorialAdrian Stephens

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 14 Comment Allocation Technical 3124

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 15 Comment Resolution Events Weekly teleconferences Ad hoc – Melbourne, AU Sep ‘06 Interim – Melbourne Sep ‘06 Ad hoc – Portland, OR Oct 17 – 19 ‘06 Ad hoc – Dallas, TX Nov 8-10 ‘06 Plenary – Dallas, TX Nov ‘06 Ad hoc – London, UK Jan ‘07 Interim – London, UK Jan ‘07 Goal = release of Letter Ballot 2.0

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 16 Entering November - Comment Allocation Technical Approved through September & included in D1.06 Resolutions Prepared But Not Approved Resolution Not completed

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 17 Entering January - Comment Allocation Unique Technical Approved through September & included in D Approved in November & included in D Resolutions pending approval Resolutions not completed

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 18 Ad Hoc Output Document Summary Ad Hoc Topic.xls resolution file # Sep 17 8 am Nov 13 8am Nov 16 8pm Jan 15 8am Beamforming & Adaptation PSMP General MAC PHY Editorial Frame Format Coexistence CA Doc73104

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide Draft Revision Procedure Editor prepares revision Chair reviews and uploads 1 page submission on 802wirelesworld public server indicating new document exists in the private server draft area. Harry receives draft and posts in members area Server area will differentiate approved from un- approved versions

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 20 Draft Revision History Draft 1.0- Approved by WG for letter ballot (LB84) Draft Working draft –contains proposed editorials Draft Contains editorials only -  TGn (July ‘06) Draft Working draft -Contains July technical resolutions Draft Clean version of  TGn (Sep ‘06) Draft Working draft -Contains Sep technical resolutions Draft Clean version of  TGn (Nov ‘06) Draft Working draft -Contains Nov technical resolutions Draft Cleaner version of 1.07 Draft Cleaner version of TGn approval (Jan ‘07) Black = actual past events, Blue = expected future events

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 21 TGn Minutes of Nov ’06 06/1713r0 Executive Summary (also see Chairs’ meeting doc r6 and closing report doc r1): The meeting was devoted to LB84 comment resolution. Out of a total of 22 hours 12 were devoted to ad hoc meetings and 10 hours were devoted to full body voting meetings. Coming into the meeting ~1863 unique technical comments out of 3077 had been resolved leaving 1214 to be resolved. 37 motions were passed directly related to the draft text and resolution of ~ 859 comments. This means ~88.5% of the unique technical comments have now been resolved. Confidence is high that the remaining ~350 comments can be resolved at the January Interim session. The goal is to go to Letter Ballot after the January meeting and resolve comments from that Letter Ballot at the March session. There will be an ad hoc meeting Wednesday Jan 10 thru Friday Jan 12 in London prior to the January Interim session There will be four ad hoc teleconference meetings on the following Wednesdays from 11:00 to 13:00 ET – Dec 6, 13, 20 and Jan 3 Joint meetings were held with.11k to synchronize amendments in process. Synchronizing text changes will be proposed by both groups at the January session. Similar synchronization meetings were proposed with.11r for the January session The most contentious issue was standardizing 40 MHz channel usage in the 2.4 GHz band. Two proposals were voted on and both failed to attain the 75% super-majority. The Time Line was considered and the consensus was to leave it unchanged -.11n will be published in April There was a motion to go to letter ballot pending at adjournment.

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 22 Approve Minutes Motion to approve Dallas November ‘06 TGn minutes as contained in r0 Move: Second:

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 23

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 24 January 2007 (London) WG Agenda (06/1881) am 1 am 2 pm 1 pm 2 eve MondayTuesdayWednesdayThursday

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 25 Primary TGn Meeting Rooms

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 26 TGn ad hoc Meeting Rooms

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 27 TGn –Jan ‘07 Schedule Time MondayTuesdayWednesdayThursdayFriday 8:00-10:00 WG Plenary  :30-12:30 2  WG Plenary 24 13:30-15: :00-18: :30-21:  Social  Prep for Friday Jan 15Jan 16Jan 17Jan 18Jan 19 Meeting Rooms for the week: am 1 am 2 pm 1 pm 2 eve

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 28 TGn –Jan ‘07 Schedule Time MondayTuesdayWednesdayThursdayFri 8:00- 10:00  16 - ad hocs 22 - ad hocs 10:30- 12: Full TGn  24 - ad hocs 13:30- 15: ad hocs 10 - ad hocs 18 - ad hocs 26 - Full TGn 16:00- 18: ad hocs 12- Full TGn20- Full TGn28 - Full TGn 19:30- 21: Full TGn 14 - ad hocs  Jan 15Jan 16Jan 17Jan 18Jan 19 am 1 am 2 pm 1 pm 2 eve

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 29 TGn –Jan ‘07 Schedule Time MondayTuesdayWednesdayThursdayFri 8:00- 10:00  16 - ad hocs Sandringham 1 MR 1- 2 MR ad hocs Sandringham 1 MR :30- 12: Full TGn Sandringham 1  24 - ad hocs Sandringham 1 MR :30- 15: ad hocs Balmoral 2 MR 1- 2 MR ad hocs Sandringham 1 MR 1- 2 MR ad hocs Sandringham 1 MR 1- 2 MR Full TGn Sandringham 1 16:00- 18: ad hocs Balmoral 2 MR 1- 2 MR Full TGn Sandringham Full TGn Sandringham Full TGn Sandringham 1 19:30- 21: Full TGn Sandringham ad hocs Sandringham 1 MR 1- 2 MR  Jan 15Jan 16Jan 17Jan 18 am 1 am 2 pm 1 pm 2 eve

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 30 TGn – Monday Jan 15 Schedule Time Monday Main Room TGN 1TGN 2TGN 3 8:00-10:00 WG Plenary 10:30- 12: Full TGn Sandringham 1 (W3) Opening report, minutes, agenda Pending motion Technical editor report Ad hoc chair reports (FF, PHY, Coex, Beam, Gen, MAC,…) MAC ad hoc 13:30- 15: ad hocs Balmoral 2 (W3) Beam -15 min PHY MR 3-4 (W2) (Beam) MR 1-2 (W2) FF 16:00- 18: Full TGn Balmoral 2 (W3) Discussion & voting MR 3-4 (W2)MR 1-2 (W2) 19:30- 21: ad hocs Sandringham 1 (W3) Coex am 1 am 2 pm 1 pm 2 eve

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 31 TGn –Tuesday Jan 16 Schedule Time Tuesday Main Room TGN 1TGN 2TGN 3 8:00-10:00  10:30- 12:30  13:30- 15: ad hocs Sandringham (W3) MAC MR 1-2 (W2) ½ hour in TGk MR 5-6 MR 3-4 (W2) 16:00- 18: Full TGn Sandringham (W3) Discussion & Voting MR 1-2 (W2)MR 3-4 (W2) 19:30- 21: ad hocs Sandringham 1 (W3) Coex am 1 am 2 pm 1 pm 2 eve

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 32 TGn –Wednesday Jan 17 Schedule Time Wednesday Main Room TGN 1TGN 2TGN 3 8:00-10: ad hocs Sandringham 1 (W3) PHY MR 3-4 (W2) MAC 10:30- 12:30  13:30- 15: ad hocs Sandringham (W3) Coex MR 1-2 (W2)MR 3-4 (W2) 16:00- 18: Full TGn Sandringham 1 (W3) Discussion & Voting MR 1-2 (W2)MR 3-4 (W2) 19:30- 21:30  am 1 am 2 pm 1 pm 2 eve

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 33 TGn –Thursday Jan 18 Schedule Time Thursday Main Room TGN 1TGN 2TGN 3 8:00-10: ad hocs Sandringham 1 (W3) Coex MR 1-2 (W2)MR 3-4 (W2) 10:30- 12: ad hocs Sandringham 1 (W3) MAC ? MR 1-2 (W2)MR 3-4 (W2) 13:30- 15: Full TGn Sandringham 1 (W3) Voting 16:00- 18: Full TGn Sandringham 1 (W3) Voting Timeline Ad hocs Teleconferences 19:30- 21:30  am 1 am 2 pm 1 pm 2 eve

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 34 Approve Agenda Motion to approve January ’07 TGn agenda as contained on slide (with any minuted amendments). Move: Second:

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 35 Motion Pending Motion by Jason Trachewsky and seconded by Dave Andrus to incorporate all of the comment resolutions approved during the November plenary into Draft 1.06 to create Draft 1.07 and request a 15 day Working Group Letter Ballot to approve Draft 1.07 to become Draft 2.0 and that Draft 2.0 be sent to Working Group Letter Ballot requesting that Draft 2.0 be forwarded to Sponsor Ballot Request for Permission to Withdraw (Roberts 33) Motion belongs to the assembly Member who made the motion may state: “I request permission to withdraw the motion” Chair may state: “Unless there is an objection the motion is withdrawn” If there is objection vote on the request, simple majority

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 36

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 37 Technical Editor’s Report r1

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 38 TGn Ad Hoc Status Reports Ad Hoc TopicAd hoc leader PSMPNaveen Kakani CA DocSheung Li Frame FormatPeter Loc PHYJim Petranovich MACMatt Fischer CoexistenceDon Schultz Beamforming & AdaptationJohn Ketchum Joonsuk Kim GeneralJon Rosdahl EditorialAdrian Stephens

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 39 TGn – Monday Jan 15 Schedule Time Monday Main Room TGN 1TGN 2TGN 3 8:00-10:00 WG Plenary 10:30- 12: Full TGn Sandringham 1 (W3) Opening report, minutes, agenda Pending motion Technical editor report Ad hoc chair reports (FF, PHY, Coex, Beam, Gen, MAC,…) MAC ad hoc 13:30- 15: ad hocs Balmoral 2 (W3) Beam -15 min PHY MR 3-4 (W2) (Beam) MR 1-2 (W2) FF 16:00- 18: Full TGn Balmoral 2 (W3) Discussion & voting MR 3-4 (W2)MR 1-2 (W2) 19:30- 21: ad hocs Sandringham 1 (W3) Coex am 1 am 2 pm 1 pm 2 eve

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 40 MAC ad hoc As time allows

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 41

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 42

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 43 Attendance 1.Register 2.Indicate attendance

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 44 TGn – Monday Jan 15 Schedule Time Monday Main Room TGN 1TGN 2TGN 3 8:00-10:00 WG Plenary 10:30- 12: Full TGn Sandringham 1 (W3) Opening report, minutes, agenda Pending motion Technical editor report Ad hoc chair reports (FF, PHY, Coex, Beam, Gen, MAC,…) MAC ad hoc 13:30- 15: ad hocs Balmoral 2 (W3) Beam -15 min PHY MR 3-4 (W2) (Beam) MR 1-2 (W2) FF 16:00- 18: Full TGn Balmoral 2 (W3) Discussion & voting MR 3-4 (W2)MR 1-2 (W2) 19:30- 21: ad hocs Sandringham 1 (W3) Coex am 1 am 2 pm 1 pm 2 eve

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 45 TGn Comment Resolution Motions Ad Hoc TopicAd hoc leaderMondayTuesday PSMPNaveen Kakani0 CA DocSheung Li0 Frame FormatPeter Loc0 PHYJim Petranovich3 MACMatt Fischer3 CoexistenceDon Schultz Eldad Perahia 0 Beamforming & Adaptation John Ketchum Joonsuk Kim 1 GeneralJon Rosdahl0 EditorialAdrian Stephens2

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 46 Motion #121 Move to have the editor update the resolution status and resolutions of duplicate comments as the parent comments are approved for the LB84 comment set. Move: Jon Rosdahl 2 nd : Tim Towell

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 47 Other discussion topics 07/0054r1 Tx MCS Set Definition

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 48

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 49 TGn –Tuesday Jan 16 Schedule Time Tuesday Main Room TGN 1 Sandringham (W3) TGN 2 MR 1-2 (W2) TGN 3 MR 3-4 (W2) 8:00-10:00  10:30- 12:30  13:30- 15: ad hocs Sandringham (W3) MAC exception ½ hour in TGk MR :00- 18: Full TGn Sandringham (W3) Discussion & Voting MR 1-2 (W2)MR 3-4 (W2) 19:30- 21: ad hocs Sandringham (W3) Coex am 1 am 2 pm 1 pm 2 eve

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 50 TGn Comment Resolution Motions Ad Hoc TopicAd hoc leaderMondayTuesday PSMPNaveen Kakani0 CA DocSheung Li0 Frame FormatPeter Loc0 PHYJim Petranovich3 MACMatt Fischer3 CoexistenceDon Schultz Eldad Perahia 0 Beamforming & Adaptation John Ketchum Joonsuk Kim 1 GeneralJon Rosdahl0 EditorialAdrian Stephens2

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 51 TGn –Wednesday Jan 17 Schedule Time Wednesday Main Room TGN 1TGN 2TGN 3 8:00-10: ad hocs Sandringham 1 (W3) PHY MR 3-4 (W2) MAC 10:30- 12:30  13:30- 15: ad hocs Sandringham (W3) Coex MR 1-2 (W2)MR 3-4 (W2) 16:00- 18: Full TGn Sandringham 1 (W3) Discussion & Voting MR 1-2 (W2)MR 3-4 (W2) 19:30- 21:30  am 1 am 2 pm 1 pm 2 eve

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 52

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 53 Does anyone need a Dell PC power supply?

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 54 TGn –Tuesday Jan 16 Schedule Time Tuesday Main Room TGN 1 Sandringham (W3) TGN 2 MR 1-2 (W2) TGN 3 MR 3-4 (W2) 8:00-10:00  10:30- 12:30  13:30- 15: ad hocs Sandringham (W3) MAC exception ½ hour in TGk MR :00- 18: Full TGn Sandringham (W3) Discussion & Voting MR 1-2 (W2)MR 3-4 (W2) 19:30- 21: ad hocs Sandringham (W3) Coex am 1 am 2 pm 1 pm 2 eve

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 55 TGn Comment Resolution Motions Ad Hoc TopicAd hoc leader MondayTuesdayWednesdayThursday PSMPNaveen Kakani000 CA DocSheung Li000 Frame FormatPeter Loc001 PHYJim Petranovich302 MACMatt Fischer312 CoexistenceDon Schultz Eldad Perahia 011 Beamforming & Adaptation John Ketchum Joonsuk Kim 110 GeneralJon Rosdahl020 EditorialAdrian Stephens210

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 56 If votes consume 30 minutes Other discussion topics 1901r9 cca sensing in 40 MHz 40 min –Posted 12: r6 40 MHz intolerant bit 40 min –Posted 13:06

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 57

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 58 TGn –Wednesday Jan 17 Schedule Time Wednesday Main Room TGN 1TGN 2TGN 3 8:00-10: ad hocs Sandringham 1 (W3) PHY MR 3-4 (W2) MAC 10:30- 12:30  13:30- 15: ad hocs Sandringham (W3) Coex MAC MR 1-2 (W2)MR 3-4 (W2) 16:00- 18: Full TGn Sandringham 1 (W3) Discussion & Voting MR 1-2 (W2)MR 3-4 (W2) 19:30- 21:30  am 1 am 2 pm 1 pm 2 eve

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 59 TGn Comment Resolution Motions Ad Hoc TopicAd hoc leader MondayTuesdayWednesdayThursday PSMPNaveen Kakani000 CA DocSheung Li000 Frame FormatPeter Loc001 PHYJim Petranovich302 MACMatt Fischer313 CoexistenceDon Schultz Eldad Perahia 011 Beamforming & Adaptation John Ketchum Joonsuk Kim 110 GeneralJon Rosdahl020 EditorialAdrian Stephens210

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 60 If votes consume 30 minutes Other discussion topics Power save extension to 40MHz intolerance

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 61 TGn –Thursday Jan 18 Schedule Time Thursday Main Room TGN 1TGN 2TGN 3 8:00-10: ad hocs Sandringham 1 (W3)  MR 3-4 (W2) Editors 10:30- 12: ad hocs Sandringham 1 (W3)  MR 3-4 (W2) Editors 13:30- 15: Full TGn Sandringham 1 (W3) Voting 16:00- 18: Full TGn Sandringham 1 (W3) Voting Timeline Ad hocs Teleconferences 19:30- 21:30  am 1 am 2 pm 1 pm 2 eve

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 62

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 63

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 64 Entering January - Comment Allocation Unique Technical Approved through September & included in D Approved in November & included in D Resolutions pending approval Resolutions not completed

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 65 Thursday January 18 - Comment Status Unique Technical Approved through September & included in D Approved in November & included in D Resolutions Completed in London

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 66 Ad Hoc Output Document Summary Ad Hoc TopicAd hoc leader.xls res file # Jan 18 8am Beamforming & Adaptation John Ketchum Joonsuk Kim PSMPNaveen Kakani68740 GeneralJon Rosdahl68849 MACMatt Fischer69064 PHYJim Petranovich69386 EditorialAdrian Stephens70629 Frame FormatPeter Loc71752 CoexistenceDon Schultz Eldad Perahia CA DocSheung Li73104

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 67 Technical Editor’s Report

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 68 Motion ? Move to incorporate all of the comment resolutions approved during the TGn January 2007 session into Draft P802.11n D1.09 to create Draft 1.10 approve a 15-day Working Group letter Ballot asking the procedural question “Should n Draft 1.10 be forwarded to Working Group letter ballot as Draft 2.0?” if successful, begin as soon as possible a 30 day Working Group Letter Ballot asking the technical question “Should n Draft 2.0 be forwarded to Sponsor Ballot?”

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 69 Possible letter ballot timing

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 70 Teleconferences & Ad hocs

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 71 Teleconferences Request authorization for TGn to conduct teleconferences for the purpose of comment resolution every Wednesday from 11:00 to 13:00 ET from 29-November to 2 weeks after the close of the 802 March plenary (March 16, 2007). No teleconferences scheduled between January and March

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 72 Ad hoc Chairs Request that the ad hoc chairs be available in the Orlando Caribe Royale on Sunday March 11, 2007 for a one day preparation meeting just prior to the beginning of the March plenary meeting

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 73 Ad hoc Request authorization for TGn to investigate venues at which it could conduct ad hoc meetings for the purpose of comment resolution following the close of letter ballot 2.0 either 1. immediately following the March plenary meeting in Orlando with the preferred location being the Caribe Royale Hotel 2. an acceptable location during mid-April pending final review/approval to be held during the January interim meeting in London

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 74 March ad hoc Monday, Tuesday, Wednesday March 19, 20, 21 ; 8am – 6pm meetings 3 meeting rooms : 50, 20, 15 Orlando confirmed but Exact Hotel location not yet confirmed Could be Caribe Royale but probably another property Internet, AV, cont breakfast, breaks, lunch Agree to proceed with meeting Arrangement Details & registration to follow by asap

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 75 Meeting proposal Meeting Location: –Little America Hotel, Salt Lake City, Utah 500 South Main Street, Salt Lake City, Utah or Meeting Dates: April –Wed-Thurs-Fri Meeting Fee: $ (estimate) Hotel Room Rate: $149 or $169 (plus tax) 3 Meeting rooms – Agree on meeting Details & registration to follow by asap

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 76 Salt Lake City - Expect the Unexpected! 350 Bars and Restaurants within a 6 block radius 4 Major Shopping Malls within a 6 block radius Several Professional Sporting Venues within 10 minutes –Jazz vs Rockets April 18 th already  sold out –Jazz vs Trailblazers April 16 th still available Professional Theatre, Opera, Ballet and Symphony within a 6 block radius There are 7 World Class Ski and Summer Resorts within 30 minutes, 11 within 40 minutes

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 77 Ad hoc Request authorization for TGn to investigate venues at which it could conduct an ad hoc meeting for the purpose of comment resolution following the close of letter ballot 2.0 to be held just prior to the May Interim in Montreal Canada Wednesday May 9 thru Friday May with the preferred option being the Fairmont Hotel pending final review/approval to be held during the March plenary meeting in Orlando

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 78 Time Line Discussion

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 79 11n - Overall timeline PAR Approved TGn Formed Selection Process & Criteria Call for Proposals Proposal Presentation s Down Select 1st WG Letter Ballot First Sponsor Letter Ballot REVCOM Approval Publication HT SG Formed Joint proposal Confirmation 2 nd WG Letter Ballot

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 80 Published 2007 Standards Board Meeting Schedule Dec Sep Jun Mar Nov Aug May Feb Oct Jul Apr Jan days 40 days 50 days 40 days Submission deadlineStds Board meeting Apr Oct Mar Excom meeting dates EC

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 81 Expected 2008 Standards Board Meeting Schedule Dec Sep Jun Mar Nov Aug May Feb Oct Jul Apr Jan days 40 days 50 days 40 days Submission deadlineStds Board meeting Apr Oct Mar EC Concern

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 82 Expected 2008 Standards Board Meeting Schedule Dec Sep Jun Mar Nov Aug May Feb Oct Jul Apr Jan days 40 days 50 days 40 days Submission deadlineStds Board meeting Apr Oct Mar EC Concern X

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 83 End of Process Event Scheduling Current Plan of Record X

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 84 Statistical Analysis of Prior Ballots WG Letter Ballots Avg revision # at completion: 2.11 (for 11 task groups) WG recirculation Ballots At which revision # do they complete? Avg revision # at completion: 4.21 (for 8 task groups) What is the % approval: 93.2 % Average time spent in this phase: 235 days Sponsor Ballots At which revision # do they complete? Avg revision # at completion: 6.74 (for 8 task groups) What is the % approval: 97.6 % Average time spent in this phase: 196 days

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 85 Projected Schedule Release Ballot 2.0 –January ’07 close in March ‘07- pass Complete comment resolution by May and produce Draft 3.0 Move into WG recirculation –Consume 235 days perfecting the draft –Complete January 05, 2008 Move into Sponsor Ballot recirc –Consume 196 days to complete sponsor ballot –Complete July 19, 2008

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 86 End of Process Event Scheduling Current Plan of Record X

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 87 Publication Amendment Publication time after ratification by Standards Board 30 days Draft Publication time after successful WG Letter Ballot ~ 10 days

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 88 Time Line Backup Details

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 89 IEEE SA Meeting Schedule

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 90 IEEE SA Meeting Schedule

doc.: IEEE /1934r5 Submission January 2007 Bruce Kraemer, MarvellSlide 91