41 st IUVSTA Workshop, Brdo pri Kranju, 21/06 – 24/06/2004 L. Schulz SLS Vacuum System Lothar Schulz Theo Bieri Nazareno Gaiffi Martin Steinacher.

Slides:



Advertisements
Similar presentations
HISTORY, EVOLUTION AND DESIGN OF THIN SEPTUM MAGNETS AT BNL Michael Mapes The 14 th ICFA mini-workshop on septa devices.
Advertisements

Upgrade Plan of KEKB Vacuum system Pre-kickoff KEK1 Y. Suetsugu KEKB Vacuum Group Contents Challenges for vacuum system Designs for.
11-13/10/2007 ILC BDS Kick-Off Meeting, SLAC, US 1 BDS Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
8 th January, 2007 European Linear Collider Workshop, DL, UK ILC DR Vacuum System Progress in ECLOUD Task (Goal 7) for the ILC DR Dr. Oleg B. Malyshev.
Vacuum & Cooling Systems Updates F. Makahleh On behave of Vacuum & Cooling Group TAC 2013, F. Makahleh, Vacuum & Cooling 1.
How e-cloud effect affects the ILC DR Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
Vacuum System Presented by Dong Haiyi Accelerator Center,IHEP,China April 27, 2006.
Beamline 12 Project BL12 In-vacuum Undulator Source August 11, 2004 Andy Ringwall BL12 In-vacuum Undulator Source August 11, 2004 Andy Ringwall.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Engineering Integration of the Double- Double Bend Achromat (DDBA) into the Diamond storage ring Jim Kay Diamond Light Source Low emittance ring 2013 workshop.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe MLC external review October 03, 2012.
Vacuum system in the main Linacs C. Garion CERN/TE/VSC CLIC09 workshop, October.
26-28 August 2008 Final EUROTeV Scientific Workshop, Uppsala University, Sweden 1 ILC DR vacuum system related problems and solutions Oleg B. Malyshev.
30/05-03/06/2007 LCWS2007 and ILC2007, DESY Hamburg Germany Vacuum System Specifications What needs to be specified in Vacuum Specification for ICL Damping.
1 Tetsuhiko Yorita JASRI/SPring-8 Acc. Div. SPring-8 Vacuum System Contents - Outline of Vacuum system - Pressure behavior - Some topics.
1 BROOKHAVEN SCIENCE ASSOCIATES Production of Vacuum Components H.C. Hseuh NSLS-II ASAC Review October 14-15, 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES Vacuum Systems H.C. Hseuh, Vacuum Group Leader 8 th ASAC Meeting for NSLS-II Project May 10-11, 2011.
45 th ICFA Beam Dynamic Workshop June 8–12, 2009, Cornell University, Ithaca New York Jim Crittenden Cornell Laboratory for Accelerator-Based Sciences.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
13/09/2005Vacuum Systems for Synchrotron Light Sources Workshop, Barcelona, Spain 1 Gas Flow Modelling in Design of the Vacuum System for of the Synchrotron.
18-20/12/2007 ILC Damping Ring R&D Mini-workshop, KEK, Japan Vacuum Design vs. e-cloud Oleg B. Malyshev ASTeC Daresbury Laboratory.
Date Event Global Design Effort 1 Technical System Review John Noonan, ANL Yusuke Suetsugu,KEK Paolo Michelato, INFN Milano.
Vacuum Workshop on Vacuum Systems for Synchrotron Light Sources, Barcelona, Installation and vacuum conditioning, 12 th and 13 th September 2005 L. Schulz.
SR Vacuum Systems and Front Ends
June 14th 2005 Accelerator Division Overview of ALBA D. Einfeld Vacuum Workshop Barcelona, 12 th -13 th September 2005 General 10 th September 2005.
1 BROOKHAVEN SCIENCE ASSOCIATES EFAC Review – May 11, 2007 S. Sharma NSLS-II Frontends and Canted Wigglers Options Sushil Sharma.
E.Huttel, Vacuum Workshop, ALBA, Sept.05 Forschungszentrum Karlsruhe / ANKA The ANKA Vacuum System S.HermleA.Völker E.HuttelT.Fischböck.
BDS 11 Vacuum System for BDS [Completeness of RDR] Y. Suetsugu J. Noonan and P. Michelato Design principle Basic design Cost estimation.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
Technical Challenges and Concerns S. Sharma and R. Alforque, R. Beuman, C. Foerster, E. Haas, E. Hu, P. Montanez, P. Mortazavi, S. Pjerov, J. Skaritka,
SuperKEKB Vacuum System - for the positron ring - Y. Suetsugu KEKB Vacuum Group Outline Design and production status of key components Beam pipes for arc.
F. Mazzolini Vacuum Systems for Synchrotron Light Sources Barcelona, September 12– Front-end vacuum system F.Mazzolini.
Matthew Cox VSSLS Workshop Barcelona Sept SLIDE 1 1 Diamond Light Source Vacuum Systems Matthew Cox
Vacuum Workshop on Vacuum Systems for Synchrotron Light Sources, Barcelona, Vacuum Technology, 12 th and 13 th September 2005 L. Schulz Introduction Pumps.
G5 Beam Line Vacuum System. G5 Beamline Vacuum System Design  Bakeable and Particulate free to Class 100 Clean Room quality Require Clean room QA and.
1 Progress of IR Vacuum Chambers Chen Peng May 11,2007.
ALBA Vacuum System, E. Al-Dmour Vacuum Systems for Synchrotron Light Sources 12 th -13 th Sep ALBA Vacuum System ALBA VACUUM SYSTEM E. Al-Dmour On.
Design of Vacuum Chambers of SSRF Storage Ring Yonglin. Chen, Dikui. Jiang SSRF Vacuum Group Shanghai Institute of Applied Physics(SINAP) China Academy.
Abstract Storage Ring Vacuum and Interface to Magnets Hsiao-chaun Hseuh, NSLS-II Project This presentation provided a quick overview of the storage ring.
TCLDA Design status Collimation Upgrade Specification Meeting L. GENTINI.
Preliminary calculations for the vacuum system of ELENA R. Kersevan TE/VSC-IVM – 21/6/2012 The vacuum sectors, the position of vacuum pumps, flanges, and.
Insertion Devices: Wigglers and Undulators Session 6 Insertion Devices Group 11/1/12.
28-May-2008Non-linear Beam Dynamics WS1 On Injection Beam Loss at the SPring-8 Storage Ring Masaru TAKAO & J. Schimizu, K. Soutome, and H. Tanaka JASRI.
NSLS Vacuum Experience Eugene J. Hu National Synchrotron Light Source Brookhaven National Laboratory Upton, NY USA September 12-13, 2005 (prepared.
Experience Fabricating the Storage Ring Vacuum Chambers for NSLSII
Accelerator Vacuum Systems at DESY M.Seidel, DESY Workshop on Vacuum Systems of Synchrotron Light Sources Barcelona,
1 Vacuum chambers for LHC LSS TS Workshop 2004 Pedro Costa Pinto TS department, MME group Surface Characterization & Coatings Section.
BROOKHAVEN SCIENCE ASSOCIATES SR Vacuum Systems ASAC Review, 7/17-18/ of 21 Storage Ring Vacuum Systems H. Hseuh, Vacuum Group ASAC Review of NSLS-II.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe.
Vacuum, H-C. Hseuh January 4, 2007 RHIC II Project Internal Cost Review H.-C. Hseuh Vacuum Systems January 4, 2007 Project Overview.
Vacuum System Requirements for a Higgs Factory e + e - Accelerator R. Kersevan CERN, Technology Department Vacuum, Surfaces and Coatings Group R. Kersevan,
Workshop on Accelerator R&D for Ultimate Storage Rings – Oct Nov.1 – Huairou, Beijing, China A compact low emittance lattice with superbends for.
ALBA labs  Magnetic lab  RF lab  Vacuum lab Francis Perez.
F. Mazzolini for the ELETTRA Vacuum Group OLAV CERN, April 11– The ELETTRA vacuum system F.Mazzolini, L.Rumiz, J.Miertusova, F.Pradal, E.Mazzucco,
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
SOLEIL OPERATION AND ON-GOING PROJECTS C. Herbeaux On behalf of SOLEIL Groups C. Herbeaux, November ESLS23, 24-25, 2015, PSI1.
1 Workshop on Vacuum System Design for Synchrotron light Source ALBA - Barcelona, Sept New trends in the vacuum design and technology.
325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Power Coupler design for Superconducting Spoke cavities. Originally.
5-7/11/2007 DR KOM ILC2007,CI, Daresbury, UK Vacuum Design Oleg B. Malyshev ASTeC Daresbury Laboratory.
Vacuum System P. Chiggiato TE-VSC
General remarks about the HESR and PANDA vacuum system
Low Emittance Rings 2014 Workshop
Challenges of vacuum chambers with adjustable gap for SC undulators
CEPC Vacuum System Dong Haiyi 2017/11/5.
XFEL Collimation and Beam Switchyard Vacuum Issues
NEG-coated gun: Black R30 arc at 227kV, white R30 arc at 164 after refurbishing and second bake Carlos Wednesday, August 10, 2018.
Accelerator R&D Results from the B-factory
CEPC Vacuum Systems Design Consideration
Presentation transcript:

41 st IUVSTA Workshop, Brdo pri Kranju, 21/06 – 24/06/2004 L. Schulz SLS Vacuum System Lothar Schulz Theo Bieri Nazareno Gaiffi Martin Steinacher

41 st IUVSTA Workshop, Brdo pri Kranju, 21/06 – 24/06/2004 L. Schulz Main Parameter

41 st IUVSTA Workshop, Brdo pri Kranju, 21/06 – 24/06/2004 L. Schulz Stainless steel vacuum chambers with full ante chamber design. Photon flux is concentrated on lumped OFHC absorbers. Pumps are installed close to the photon absorbers. Flat seal flanges are used. (chamber toleranzes ±0.05 mm longitudinal, ±0.1 mrad angular) Photon absorber Chamber Design Photon absorber

41 st IUVSTA Workshop, Brdo pri Kranju, 21/06 – 24/06/2004 L. Schulz SLS Cell Due to the small chamber tolerances the total number of bellows could be minimized. No bellows in the magnet cells. Only in the straights two bellows are installed. Chamber movements are detected with two dial gauges per BPM station. Chamber Design

41 st IUVSTA Workshop, Brdo pri Kranju, 21/06 – 24/06/2004 L. Schulz Vacuum sections assembled outside the storage ring in a clean room and baked at 250 °C in a oven. During the bake-out, the vacuum sections hang on chains in the oven so that the thermal expansion can take place freely. Sputter ion pumps started during cool down at 150 °C. Vacuum chambers installed under vacuum into the storage ring. Straight sections are baked in-situ with a mobile oven. Vacuum Sector Assembly and Bake-out

41 st IUVSTA Workshop, Brdo pri Kranju, 21/06 – 24/06/2004 L. Schulz Fixed gap 11 mm, BESSY type Aluminum Length 4 m UE 56 Permanent Magnet Fixed gap 18 mm Stainless Steel Length 11 m UE 212 Electro Magnet Fixed gap 5 mm APS type Aluminum Length 2 m Wiggler Permanent Magnet Variable gap, Stainless Steel Length 2 m 3 In-Vacuum IDs (U19) are installed U19 In-Vacuum Undulator Insertion Device Chambers

41 st IUVSTA Workshop, Brdo pri Kranju, 21/06 – 24/06/2004 L. Schulz Dynamic Pressure vs Accumulated Beam Dose